Tender Value
₹64.4 L
EMD Value
₹1.3 L
Closing Date
8 Oct 2026, 4:30 pm
Public Works Department
PRAVEEN R HULJI
Annual maintenance to Padubidri-Chikkalagudda (SH-01) km. 393.08 to 401.48, km. 420.56 to 439.75, km. 439.89 to 446.69 of Bailahongal/Savadatti taluk & Raichur-Baachi (SH-20) km. 292.62 to 320.03 of Bailahongal/Savadatti taluk & Bailahongal/Kittur constituency for the year 2026-27
PWD/2026-27/RD/WORK_INDENT43479
PWD/2026-27/RD/WORK_INDENT43479
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Belagavi
11 documents required · 11 mandatory
To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2021-22, 2022-23, 2023-24 2024-25 and 2025-26 Achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs. 64.37 Lakhs
To qualify for award of this contract, each Tenderer in his name should have in the last five years 2021-22, 2022-23, 2023-24 2024-25 and 2025-26 Satisfactorily completed, as prime contractor, at least one similar work such as Maintenance/Improvements/Renewal of Asphalt Road Works of value not less than Rs. 32.19 Lakh
To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2021-22, 2022-23, 2023-24 2024-25 and 2025-26 executed the following minimum quantities of work 1) Pothole Filling-Aspahalt Quantities(Pothole Filiing/MSS/BM/DBM/SDBC/BC) 5619.00 sqm,
Principal Place of Business (Full address)
Name and Address Telephone Nos. Fax Nos. and email ID of the Tenderers Bankers
Tenderers who meet the above specified minimum qualifying criteria will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under Assessed available tender capacity equal to (AxNx2.5 - B) A equal to Maximum value of civil engineering works executed in any one year during the last five years (updated to 2026-27 price level) taking into account the completed as well as works in progress. 0.92 Year where B equal to Value at 2026-27 price level, of existing commitments and on-going works to be completed during the next 0.92 Year form the probable date of Award of this contract.
As per this note each tenderer should further demonstrate Availability of key equipment/ machinery for execution of the work. However as per Govt Circular no GOFDAE 263EXP122022 dt 11 052022 this clause for owning key equipment for works costing upto Rs 3.00 Crores is exempted. However it is obligatory for the contractor to use the fallowing machineries for various activities involved in construction as per MORTH specifications. Tippers-1 Own, 1-Hire, Hot Mix Plant(40/60 TPH)-1 Own,Vibratory Road Roller-1 Own 1-Hire, Paver Finisher-1 Own and Water Tanker-2 Hire
Qualification and experience of the key technical and Management personnel in permanent employment with the Tenderer and those that are proposed to be deployed on this work, if work is awarded
Report on the financial standing of the Tenderer, such as profit and loss statements and auditors report for the last five years.
The proposed methodology and program of construction, backed with equipment planning and deployment duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion
Information on works which are yet to be completed.
Information of the works for which Tender acceptance letters are received.
Each Tenderer should further demonstrate- liquid assets and/or availability of credit facilities of not less than Rs.19.31 lakhs Credit lines/letter of credit/ certificates from the banks for meeting the fund requirement etc. (Enclosed with this NIT under Forms of Bid qualification information as per Govt. Circular No. FD-CAM/16/2022(P-2), dated. 22.08.2022) (estimated cash flow for 3 months of peak construction period)
Report on the financial standing of the Tenderer, such as profit and loss statements and auditors report for the last five years.
Unique Document Identification Number (UDIN) for Practicing Chartered Account is Preffered
The EMD of Rs 1,28,800/- shall be paid in full through e payment or in two parts ie part 1) Rs 50,000 by e- payment part 2) Rs 78,800/-EMD shall be in the form of Bank guarantee and shall be handed over to the Executive Engineer before the prescribed date and time of opening of the Bids
PWD Registration Certificate (Class I/II/III/IV)
₹1,610
₹1.3 L
18 Sept 2026
18 Sept 2026
9 Oct 2026
7 Oct 2026
PUBLIC WORKS DEPARTMENT
EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT, BELAGAVI DIVISION, BELAGAVI
OFFICE OF THE ASSISTANT EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT, SUB-DIVISION, BAILHONGAL. Need to ADD NFL IN GD AND ESTIMATE
: Head of Account : ¥ÁåPÉÃeï-2
3054-03-337-0-05-200 SH Maintenance for the year 2026-27
: Name of Work : NAME OF WORK:
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರು ಮತಕ್ಷೇತ್ರದ ಪಡುಬಿದ್ರಿ-ಚಿಕ್ಕಾಲಗುಡ್ಡ (ರಾ.ಹೆ -01) ಕಿ.ಮೀ. 393.08 ರಿಂದ 401.48, ಕಿ.ಮೀ 420.56 ರಿಂದ 439.75 ,ಕಿ.ಮೀ 439.89 ರಿಂದ 446.69 ರವರೆಗೆ ಮತ್ತು ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ & ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರ ಮತಕ್ಷೇತ್ರದ ರಾಯಚೂರ-ಬಾಚಿ (ರಾ.ಹೆ.-20) ಕಿ.ಮೀ. 292.62 ರಿಂದ 320.03 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು. Mangasuli-Lakshmeshwara (SH-73) from Km 122.67 to 130.9, Km 131.50 to 141.05, Km 141.87 to 159.93, Km 171.51 to 174.21, Km 174.46 to 185.15, and Km 194.17 to 204.16 in Kittur/Bailhongal Taluk of Belagavi District for the year 2025-26 Under 3054-03-337-0-05-200 SH Maintenance.
ESTIMATED COST : Rs 76.00 Lakhs.
PARAGRAPH 130(A) OF THE KARNATAKA PUBLIC WORKS
DEPARTMENTAL CODE.
E S T I M A T E.
Division. : Executive Engineer, PW Dept. Belagavi Division, Belagavi
Sub-Division . : AEE, PWD Sub-Dn. Bailhongal.
Fund Head. : 3054-03-337-0-05-200 SH Maintenance for the year 2026-27
Service Head. :
Departmental Head. :
Estimate framed in the office of the Assistant Executive Engineer, P.W.D. Sub-Division, Bailhongal and probable expenses that will be incurred for the work of 2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರು ಮತಕ್ಷೇತ್ರದ ಪಡುಬಿದ್ರಿ-ಚಿಕ್ಕಾಲಗುಡ್ಡ (ರಾ.ಹೆ -01) ಕಿ.ಮೀ. 393.08 ರಿಂದ 401.48, ಕಿ.ಮೀ 420.56 ರಿಂದ 439.75 ,ಕಿ.ಮೀ 439.89 ರಿಂದ 446.69 ರವರೆಗೆ ಮತ್ತು ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ & ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರ ಮತಕ್ಷೇತ್ರದ ರಾಯಚೂರ-ಬಾಚಿ (ರಾ.ಹೆ.-20) ಕಿ.ಮೀ. 292.62 ರಿಂದ 320.03 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು under HOA 3054-03-337-0-05-200 SH Maintenance for the year 2025-26.
Estimated Cost. : Rs. 48.00 lakhs.
Administratively sanctioned under : No.____________Date ___________
Technically sanctioned under : No.____________Date ___________
Estimate Prepared by : Amareen Mulla, AE
: Suresh Putani, JE
: Poornanand Bagali, AE
Estimate Checked by : Shri.Anil M, AEE
(Call or Authority) :
" Separate Sheet Enclosed "
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರು ಮತಕ್ಷೇತ್ರದ ಪಡುಬಿದ್ರಿ-ಚಿಕ್ಕಾಲಗುಡ್ಡ (ರಾ.ಹೆ -01) ಕಿ.ಮೀ. 393.08 ರಿಂದ 401.48, ಕಿ.ಮೀ 420.56 ರಿಂದ 439.75 ,ಕಿ.ಮೀ 439.89 ರಿಂದ 446.69 ರವರೆಗೆ ಮತ್ತು ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ & ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರ ಮತಕ್ಷೇತ್ರದ ರಾಯಚೂರ-ಬಾಚಿ (ರಾ.ಹೆ.-20) ಕಿ.ಮೀ. 292.62 ರಿಂದ 320.03 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು.
P.W.D. CODE PARA-133
C E R T I F I C A T E
This to certify that, Anil M, Assistant Executive Engineer, have personally visited the spot and prepared the estimate using sanctioned scheduled of rates provided for the most economical and safe way of executing work.
C E R T I F I C A T E
(As required vide G.O.No.PWD.SL.CMS.96 Dtd: 27-6-1991)
Certified that, sufficient care has been taken while preparing the estimate in respect of the above mentioned work to see that all necessary items which are technically required for the work in sufficient quantity are included while preparing the estimate, and specification of items included are completed and correct.
C E R T I F I C A T E
Certified that, the work proposed in this estimate has not been taken up under any other head / programme by any agency. The said work has not been included / proposed / over lapped in any other proposed or approved programme.
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರು ಮತಕ್ಷೇತ್ರದ ಪಡುಬಿದ್ರಿ-ಚಿಕ್ಕಾಲಗುಡ್ಡ (ರಾ.ಹೆ -01) ಕಿ.ಮೀ. 393.08 ರಿಂದ 401.48, ಕಿ.ಮೀ 420.56 ರಿಂದ 439.75 ,ಕಿ.ಮೀ 439.89 ರಿಂದ 446.69 ರವರೆಗೆ ಮತ್ತು ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ & ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರ ಮತಕ್ಷೇತ್ರದ ರಾಯಚೂರ-ಬಾಚಿ (ರಾ.ಹೆ.-20) ಕಿ.ಮೀ. 292.62 ರಿಂದ 320.03 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು.
ಬೈಲಹೊಂಗಲ ಉಪವಿಭಾಗದ 2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರು ಮತಕ್ಷೇತ್ರದ ಪಡುಬಿದ್ರಿ-ಚಿಕ್ಕಾಲಗುಡ್ಡ (ರಾ.ಹೆ -01) ಕಿ.ಮೀ. 393.08 ರಿಂದ 401.48, ಕಿ.ಮೀ 420.56 ರಿಂದ 439.75 ,ಕಿ.ಮೀ 439.89 ರಿಂದ 446.69 ರವರೆಗೆ ಮತ್ತು ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ & ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರ ಮತಕ್ಷೇತ್ರದ ರಾಯಚೂರ-ಬಾಚಿ (ರಾ.ಹೆ.-20) ಕಿ.ಮೀ. 292.62 ರಿಂದ 320.03 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವ ಕಾಮಗಾರಿಯು ಲೆಕ್ಕ ಶೀರ್ಷಿಕೆ : 2025-26 ನೇ ಸಾಲಿನ 3054-03-337-0-05-200 ರಾಜ್ಯ ಹೆದ್ದಾರಿ ನಿರ್ವಹಣೆ ಅನುದಾನದಡಿ ರೂ. 76.00 ಲಕ್ಷಗಳಿಗೆ ಕಾರ್ಯಕ್ರಮ ಪಟ್ಟಿಯಲ್ಲಿ ಅನುಮೋದನೆಗೊಂಡಿರುತ್ತದೆ. ಸದರಿ ರಸ್ತೆಯ ಭಾಗಗಳಿಗೆ ನಿರ್ವಹಣೆಗಾಗಿ ಈ ಕೆಳಕಂಡ ಅಂಶಗಳನ್ನು ಅಳವಡಿಸಿ ಅಂದಾಜು ಪತ್ರಿಕೆಯನ್ನು ತಯಾರಿಸಲಾಗಿದೆ.
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
10 Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approveddrawing.The sign shall be maintained as per section 12 of IRC:67:2022.( iv ) 60 cm equilateral triangle.
11 Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator
12 Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
13 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. Using Screening Crushable type such as Moorum or Gravel
ಸದರಿ ಅಂದಾಜು ಪಟ್ಟಿಯನ್ನು 2023-24 ನೇ ಸಾಲಿನ (2025-26 ಕ್ಕೆ ಮುಂದುವರೆದ) ಲೋಕೋಪಯೋಗಿ ಇಲಾಖೆ, ಏಕರೂಪ ದರಪಟ್ಟಿಯಂತೆ ದರಗಳನ್ನು ಅಳವಡಿಸಿ ರೂ. 76.00 ಲಕ್ಷಗಳಿಗೆ ತಯಾರಿಸಿ ತಾಂತ್ರಿಕ ಮಂಜೂರಾತಿಗಾಗಿ ಸಲ್ಲಿಸಲಾಗಿದೆ.
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರು ಮತಕ್ಷೇತ್ರದ ಪಡುಬಿದ್ರಿ-ಚಿಕ್ಕಾಲಗುಡ್ಡ (ರಾ.ಹೆ -01) ಕಿ.ಮೀ. 393.08 ರಿಂದ 401.48, ಕಿ.ಮೀ 420.56 ರಿಂದ 439.75 ,ಕಿ.ಮೀ 439.89 ರಿಂದ 446.69 ರವರೆಗೆ ಮತ್ತು ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ & ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರ ಮತಕ್ಷೇತ್ರದ ರಾಯಚೂರ-ಬಾಚಿ (ರಾ.ಹೆ.-20) ಕಿ.ಮೀ. 292.62 ರಿಂದ 320.03 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು.
Recaptulation sheet
Sl. No. Description Amount
1 For Annual Maintenance Rs. 6437224.23 6437223.74
4 Add for Misc & Rounding off Rs. 4075.41 4075.99
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Divn Bailhongal Public Works Dept., Divn Belagavi
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರು ಮತಕ್ಷೇತ್ರದ ಪಡುಬಿದ್ರಿ-ಚಿಕ್ಕಾಲಗುಡ್ಡ (ರಾ.ಹೆ -01) ಕಿ.ಮೀ. 393.08 ರಿಂದ 401.48, ಕಿ.ಮೀ 420.56 ರಿಂದ 439.75 ,ಕಿ.ಮೀ 439.89 ರಿಂದ 446.69 ರವರೆಗೆ ಮತ್ತು ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ & ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರ ಮತಕ್ಷೇತ್ರದ ರಾಯಚೂರ-ಬಾಚಿ (ರಾ.ಹೆ.-20) ಕಿ.ಮೀ. 292.62 ರಿಂದ 320.03 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು.
ESTIMATE (ABSTRACT)
Sl. No. Description of Item Unit Qty. Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,. 100 m2 2545.80 393.00 1000499.40
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. m 29969.00 6.00 179814.00
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, . m2 15578.95 39.00 607579.05
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. . m2 1851.33 97.00 179578.53
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. m2 3188.81 388.00 1237259.25
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. m2 3834.45 635.00 2434875.75
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, . m2 262.50 27.00 7087.50
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,. No 31.00 2047.00 63457.00
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint. Km 16.00 206.00 3296.00
10 Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approveddrawing.The sign shall be maintained as per section 12 of IRC:67:2022.( iv ) 60 cm equilateral triangle. each 10.00 3591.00 35910.00
11 Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator Sqm 2062.50 5.00 10312.50
12 Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Cum 206.25 493.00 101681.25
13 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. Using Screening Crushable type such as Moorum or Gravel Cum 206.25 2164.00 446325.00
14 Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (ii)Ordinary kilometer stone (precast) No 21.00 2889.00 60669.00
15 Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (iii)200 m stone (precast) No 84.00 820.00 68880.00
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರು ಮತಕ್ಷೇತ್ರದ ಪಡುಬಿದ್ರಿ-ಚಿಕ್ಕಾಲಗುಡ್ಡ (ರಾ.ಹೆ -01) ಕಿ.ಮೀ. 393.08 ರಿಂದ 401.48, ಕಿ.ಮೀ 420.56 ರಿಂದ 439.75 ,ಕಿ.ಮೀ 439.89 ರಿಂದ 446.69 ರವರೆಗೆ ಮತ್ತು ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ & ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರ ಮತಕ್ಷೇತ್ರದ ರಾಯಚೂರ-ಬಾಚಿ (ರಾ.ಹೆ.-20) ಕಿ.ಮೀ. 292.62 ರಿಂದ 320.03 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು.
SL No Description of work Unit No Measurement Qty Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
Padbudri chikalgudda 393.08 To 401.48 2 8400.00 2.80 50.0% 23520.00
Post Mansoon 34390.00
Padbudri chikalgudda 393.08 To 401.48 2 8400.00 2.80 30.0% 14112.00
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Padbudri chikalgudda 393.08 To 401.48 2 8400.00 35.0% 5880.00
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
Padbudri chikalgudda 393.08 To 401.48 2 8400.00 1.80 5.0% 1512.00
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
Padbudri chikalgudda 393.08 To 401.48 1 8400.00 1.80 3.2% 483.84
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
Padbudri chikalgudda 393.08 To 401.48 1 8400.00 5.50 1.50% 693.00
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
Padbudri chikalgudda 393.08 To 401.48 1 8400.00 5.50 1.50% 693.00
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
Padbudri chikalgudda 30.00 5.00 1.50 225.00
Raichur Bachi 5.00 5.00 1.50 37.50
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Padbudri chikalgudda Repairs & vent clearance to CDs Each 15 1.00 15.00
Raichur Bachi 16 1.00 16.00
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
Km Total Qty 16.00 206.00 3296.00
10 Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approveddrawing.The sign shall be maintained as per section 12 of IRC:67:2022.( iv ) 60 cm equilateral triangle.
Each Total Qty 10.00 3591.00 35910.00
11 Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator
12 Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
13 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. Using Screening Crushable type such as Moorum or Gravel
14 Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (ii)Ordinary kilometer stone (precast)
15 Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (iii)200 m stone (precast)
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರು ಮತಕ್ಷೇತ್ರದ ಪಡುಬಿದ್ರಿ-ಚಿಕ್ಕಾಲಗುಡ್ಡ (ರಾ.ಹೆ -01) ಕಿ.ಮೀ. 393.08 ರಿಂದ 401.48, ಕಿ.ಮೀ 420.56 ರಿಂದ 439.75 ,ಕಿ.ಮೀ 439.89 ರಿಂದ 446.69 ರವರೆಗೆ ಮತ್ತು ಬೈಲಹೊಂಗಲ/ಸವದತ್ತಿ ತಾಲೂಕಿನ & ಬೈಲಹೊಂಗಲ / ಕಿತ್ತೂರ ಮತಕ್ಷೇತ್ರದ ರಾಯಚೂರ-ಬಾಚಿ (ರಾ.ಹೆ.-20) ಕಿ.ಮೀ. 292.62 ರಿಂದ 320.03 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು.
S No Description of work SR Vol Page No Item No Basic Rate Area Wtage 0% Add 18% for GST Finished Rate Unit
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,. Vol-III 9 2.5 a 393.00 0.00 0.00 393.00 100 m2
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Vol-III 147 16.19 6.00 0.00 0.00 6.00 m
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, . Vol-III 91 10.3 39.00 0.00 0.00 39.00 m2
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. . Vol-III 91 10.2 97.00 0.00 0.00 97.00 m2
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. Vol-III 93 10.15 (i) 388.00 0.00 0.00 388.00 m2
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. Vol-III 93 10.15 (ii) 635.00 0.00 0.00 635.00 m2
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, . Vol-III 148 16.26 27.00 0.00 0.00 27.00 m2
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,. Vol-III 147 16.20 (i) 2047.00 0.00 0.00 2047.00 No
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint. Vol-III 148 16.24 (i) 206.00 0.00 0.00 206.00 Km
10 Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approveddrawing.The sign shall be maintained as per section 12 of IRC:67:2022.( iv ) 60 cm equilateral triangle. Vol-III 67 8.6 3591.00 0.00 0.00 3591.00 each
11 Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator Vol-III 17 3.4 5 0.00 0.00 5.00 Sqm
12 Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Vol-III 17 3.5 493 0.00 0.00 493.00 Cum
13 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. Using Screening Crushable type such as Moorum or Gravel Vol-III 26 4.14(a) 2164 0.00 0.00 2164.00 Cum
14 Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (ii)Ordinary kilometer stone (precast) Vol-III 67 8.16.(ii) 2889 0.00 0.00 2889.00 each
15 Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (iii)200 m stone (precast) Vol-III 67 8.16.(iii) 820 0.00 0.00 820.00 each
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
FULL DETAIL BAR CHART - SH-01
NAME OF ROAD : ANNUAL MAINTAINANCE OF PADUBIDRI - CHIKKALGUD (SH-1) IN BAILHONGAL TALUKA BELAGAVI DISTRICT FROM KM.NO.393.08 TO 448.44 NET LENGHT = 43.97 KM ROAD ID : BAI201
ROAD CATEGORY : MDR SUBDIVISION : BAILHONGAL DIVISION : BELAGAVI CIRCLE : BELAGAVI
START LATTITUDE:15.65333 AND LONGITUDE:74.97888 END LATTITUDE:15.96861 AND LONGITUDE:74.760277
Nanagundikoppa Dodawad Village Belawadi
CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD
Road Details (CD Details)
Carriage Way 9.00 m
Last Five Year road Improved Details
KRDCL REACH UNDER DLP
No Improvement Appendix E 2023-24 WI 6567 GSB 150mm WMM 250mm DBM 50mm BC 30mm Over lap -SH-73
Proposed Year Details
Annual Maintenance for 2026-27 More Than 5Years Work Completed under 2023-24 5054 SH Imp and Under DLP Over lap -SH-73 KRDCL REACH UNDER DLP
Legends Desciption Silent Features 1). Completed Works and under DLP 4) On going works
Completed Works & Under DLP Lane Width Details Total Length (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions L (in Km) 9.58
Annual Maintenance for More than 5 Year Single Lane 439.20 to 439.75 and 439.89 to 446.69 9.24 5054 401.48, 413.93 404.43, 420.56 RC 9.58 5054 SH Imp - - RD 0.00
Annual Maintenance for Less than 5 Year Intermediate lane 393.08 to 404.43 and 420.56 to 421.98 28.34 Total Length (in Km) 9.58 5054 SH Imp - - RD 0.00
Work Approved/Progress Two lane 421.98 to 433.13 11.15 Total Length (in Km) 0.000
Non Feasible Two lane + PS 413.93 to 420.56 6.63 2).Maintenance for 2026-27
Major Bridges Four lane - - HEAD OF ACCOUNT From To Provisions L (in Km)
Minor Bridges Major Bridges - - 3054 SH 393.08 401.48 Maint 8.400 5) Eligible for Renewal
CD Minor Bridges - - HEAD OF ACCOUNT From To Provisions L (in Km)
Village/ City Name Railway Crossing - - 3054 SH 420.56 439.75 Maint 19.190 - - - -
Railway Crossing Overlap Length - 11.39 Total Length (in Km) 0.000
Overlap Total Length excluding over lap length (in Km) 43.97 3054 SH 439.89 446.69 Maint 6.800
Total Length including over lap length (in Km) 55.36 Total Length(KM) 34.39
2026-27 Maintenance Abstract
Village/City Limit Other Department Works No. Details Length Description Length in Km
Name of Village/ City From To L (in Km) Under From To L (in Km) 1 1). Completed Works and under DLP 9.580 3) Proposed works under Annual Works 2026-27 Less Than 5 Years Developed Length (2024-25 Maintenance) 14.85
Nanagundikoppa 394.00 394.20 0.20 KRDCL 413.93 420.56 6.63 2 2).Maintenance for 2026-27 34.390 HEAD OF ACCOUNT From To Provisions L (in Km) More than 5 years Developed length (24-25 Maint) 19.54
Dodawad 396.33 398.43 2.10 KSHIP - - - 3 3) Proposed works under Annual Works 2026-27 0.000 Appendix-E - - - Total Maintenance length 34.39
Belawadi 404.00 404.43 0.43 SHDP - - - 4 4) On going works 0.000 Total Length (in Km) 0.000 Total Length of the Road 43.97
PRAMC - - - 5 5) Eligible for Renewal 0.000
Total Length (in Km) 2.730 Total Length (in Km) 6.630 Total Length (in Km) 43.970
Assistant Executive Engineer Executive Engineer
PWD, Sub Division Bailhongal PWD, Division Belagavi
2024-25 Maintenance Abstract
Description Length in Km
Last 5 Years Developed Length (2024-25 Maintenance) 0.00
More than 5 years Developed length (24-25 Maint) 0.00
Total Maintenance length 0.00
Total Length of the Road 0.00
FULL DETAIL BAR CHART - SH ROAD ID BAI 201
NAME OF ROAD : ANNUAL MAINTAINANCE OF PADUBIDRI - CHIKKALGUD (SH-1) IN BAILHONGAL TALUKA BELAGAVI DISTRICT FROM KM.NO.393.08 TO 448.44 NET LENGHT = 43.97 KM ROAD ID : BAI201
ROAD CATEGORY : MDR SUBDIVISION : BAILHONGAL DIVISION : BELAGAVI CIRCLE : BELAGAVI
START LATTITUDE:15.771416 AND LONGITUDE:74.841282 END LATTITUDE:15.752285 AND LONGITUDE:74.835142
Bailhongal Town limit Inchal Village
CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD
Carriage Way 7.00 m
Structure Chainage
SHDP-IV 2021-22
7.00 m 5.50 m GSB 100mm DLC 100mm PQC 250mm Appendix E 2022-23 WI 149244 GSB 100 mm WMM 250mm BM 50mm SDBC 25mm
Annual Maintenance for 2026-27 Les Than 5Years Annual Maintenance for 2026-27 Les Than 5Years Annual Maintenance for 2026-27 Les Than 5Years
Assistant Executive Engineer Executive Engineer
PWD, Sub Division Bailhongal PWD, Division Belagavi
FULL DETAIL BAR CHART - SH ROAD ID BAI 201
NAME OF ROAD : ANNUAL MAINTAINANCE OF PADUBIDRI - CHIKKALGUD (SH-1) IN BAILHONGAL TALUKA BELAGAVI DISTRICT FROM KM.NO.393.08 TO 448.44 NET LENGHT = 43.97 KM ROAD ID : BAI201
ROAD CATEGORY : MDR SUBDIVISION : BAILHONGAL DIVISION : BELAGAVI CIRCLE : BELAGAVI
START LATTITUDE:15.771416 AND LONGITUDE:74.841282 END LATTITUDE:15.752285 AND LONGITUDE:74.835142
Mekalamaradi Vannur
3.75 m OVER -LAP -J.J SH- 31 SH - 73 OVER LAP
Appendix E 2022-23 WI 149244 GSB 100 mm WMM 250mm BM 50mm SDBC 25mm No Improvement in the Last 5 Year
No Improvement OVER -LAP -J.J SH- 31 No Improvement in the Last 5 Year SH - 73 OVER LAP
Over Lap SH-31 Annual Maintenance for the year 2023-24
Annual Maintenance for 2026-27 Les Than 5Years Annual Maintenance for 2026-27 More Than 5Years NF OVER -LAP -J.J SH- 31 Annual Maintenance for 2026-27 More Than 5Years SH - 73 OVER LAP
Assistant Executive Engineer Executive Engineer
PWD, Sub Division Bailhongal PWD, Division Belagavi
Bar charts showing the details of works on National Highway's coming under jurisdiction of NH Circle Dharwad.
Strengthening Work approved under Annual Plan for the year2021-22. Estimate under scrutiny at RO office. (Lane width:9m)
NH-63 Karwar NH Division Four lane Widening/improvement Work approved under Annual Plan for the year2021-22 Work completed on 12.12.2018.Under DLP period till 11.12.2021. Strengthening work completed. vide J.No.16-17-820. Foreclosure proposal submitted to Ministry office. (Lane width:7m) Under M&R
Widening work completed on 31.01.2021. Under DLP for next 3 years (Lane width:7m.) Under M&R
NH-206 (New NH-69) Karwar Divn. (Honnavar sub-divn)
Bar charts showing the details of works on National Highway's coming under jurisdiction of NH Circle Dharwad.
Name of City , Villages & Bridges Start point Tintani Bridge Golapalli bridge (MJB) Lingasusgur Maski MJB Sindhanur Shrirampura Junction MJB End Point Dadesugura Bridge
NH-150A Vijayapura Divn. (Hunagund sub-divn)
Periodical Renawal work Physically completed. Vide J.No.2019-20-29 DLP Upto 30-03.2021 (lane width 5.5 m) The Siad Streach is under 2021-22 Annual plan for widening, The proposal Submitted to CE office Periodical Renawal work Physically completed. Vide J.No.2019-20-29 DLP Upto 30-03.2021 (lane width 2 lane +PS) (Lane width:4 lane) CC Road Under DLP KRDCL Raech (Lane width:4 lane) CC Road Under DLP Lane width:2 lane+PS) CC Road Under DLP upto Under M&R (lane width 5.5m)
Periodical Renawal work Physically completed. Vide J.No.2019-20-19. (Lane width:2 Lane)
Periodical Renawal work Physically completed. Vide J.No.2019-20-19. (Lane width: 5.5 m)
NH-367 Vijayapura Divn. (Hunagund sub-divn) (Lane width: 3.75 m) Under M&R
FULL DETAILS BAR CHART-(SH-20 Road RIS ID:-BAI02)
Name of the Road :) Annual Maintenance to Raichur-Bachi (SH-20) from Km 292.62 to 320.03 in Bailhongal/Saundatti Taluk of Bailhongal/Kittur Constituency
Road Category: SH Sub Division : Bailhongal Division : Belagavi Circle :Belagavi
START LATITUDE:15.53434 LONGITUDE:74.93999 END LATITUDE:15.87928 LONGITUDE:74.69889
Bailhongal Const..Border Halki Cross Harogoppa Cross Gotmar Cross Mekalmardi cross Somanatti cross Somanatti Village Nesaragi Cross Nesaragi Villagre Mattikoppa cross Major Bridge Hogarti cross Bailhongal Border
LAST FIVE YAER DETAILS
Carriage Way WI No:135331 Renewal work under App-E 2020-21 BC=30mm WI No:135331 Renewal work under App-E 2020-21 BC=30mm Flood work Under 4G in 2019-20 BM=50mm SDBC=25mm WI No:135331 Renewal work under App-E 2020-21 BC=30mm Flood work Under 4G in 2019-20 BM=50mm SDBC=25mm WI No:135331 Renewal work under App-E 2020-21 BC=30mm
PROPOSED YEAR DETAILS
Annual Maintenance for 2026-27 (Last 5 Year Developed Length) Annual Maintenance for 2025-26 (More than 5 Year Developed Length) Annual Maintenance for 2026-27 (Last 5 Year Developed Length) Annual Maintenance for 2026-27 (Last 5 Year Developed Length) Annual Maintenance for 2026-27 (Last 5 Year Developed Length) Annual Maintenance for 2026-27 (Last 5 Year Developed Length) Annual Maintenance for 2026-27 (Last 5 Year Developed Length)
Legends Desciption Silent Features 3).Proposed works under Annual Works 2026-27 2).Maintenance for 2026-27 Village/City Limit
Completed Works & Under DLP Lane Width Details Total Length (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Name of Village/ City From To L (in Km)
Works Under Annual Maintenance 2024-25(More than 5 years) Single Lane 0.00 Km 0.00 - - - - 3054 292.62 300.70 Maint 8.08 Nesaragi 310.60 311.09 0.49
Works Under Annual Maintenance 2024-25(less than 5 years) Intermediate lane 0.00 Km 0.00 - - - - 300.70 301.30 Maint 0.60 Somanatti 308.10 308.48 0.38
Work Under progress Two lane 0.00 Km 0.00 - - - - 301.30 320.03 Maint 18.73
Works Eligible for Renewal Two lane + PS 27.41 Km ( Km 292.60 to 320.03) 27.41 Total Length (in Km) 0.00 Total Length (in Km) 27.41 Total Length (in Km) 0.87
Major Bridges Four lane 0.00 Km 0.00 4). On going works 1). Completed Works and under DLP
Minor Bridges Major Bridges 1Nos (317.19 Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Other Department Works
CD Minor Bridges 4 Nos (305.65,307.17,308.20,313.10 Km) - - - - - - - - - Under From To L (in Km)
Village/ City Name Railway Crossing - - - - - - - - - KRDCL 0.00
Railway Crossing Overlap Length - 0.00 - - - - KSHIP 0.00
Total Length (in Km) 27.41 Total Length (in Km) 0.00 - - - - SHDP 0.00
5). Eligible for Renewal Total Length (in Km) 0.00 Total Length (in Km) 0.00
HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km)
0.00 0.00 Ren 0.00 No. Details Length Maintenance Abstract 2026-27
1 1). Completed Works and under DLP 0.00 Description Length in Km
2 2).Maintenance for 2026-27 27.41 Length Developed in Last 5 years 26.81
3 3).Proposed works under Annual Works 2026-27 0.00 More than 5 years Developed length (23-24 Maint) 0.60
4 4). On going works 0.00 Total Maintenance length 27.41
5 5). Eligible for Renewal 0.00 Total Length of the Road 27.41
Total Length (in Km) 27.41
Name of the Road :) Raichur-Bachi (SH-20) in Bailhongal/Saundatti Taluk of Bailhongal/Kittur Constituency
Road Category: SH Sub Division : Bailhongal Division : Belagavi Circle :Belagavi
Bailhongal Const..Border Halki Cross Harogoppa Cross Gotmar Cross Mekalmardi cross Somanatti cross Somanatti Village Nesaragi Cross Nesaragi Villagre Mattikoppa cross Major Bridge Hogarti cross Bailhongal Border
Annual Maintenance for the Year 2023-24
Legends Desciption Silent Features 3).Proposed works under Annual Works 2022-23 2).Maintenance for 2023-24 Village/City Limit
Completed Works & Under DLP Lane Width Details Total Length (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Name of Village/ City From To L (in Km)
Works Under Annual Maintenance 2022-23 Single Lane 0.00 Km 0.00 - - - - - 3054 292.62 320.03 Maint 27.41 Nesaragi 310.60 311.09 0.49
Proposed Works under 2022-23 Intermediate lane 0.00 Km 0.00 - - - - 0.00 Somanatti 308.10 308.48 0.38
Work Under progress Two lane 0.00 Km 0.00 - - - - 0.00
Works Eligible for Renewal Two lane + PS 27.41 Km ( Km 292.60 to 320.03) 27.41 Total Length (in Km) 0.00 Total Length (in Km) 27.41 Total Length (in Km) 0.87
Major Bridges Four lane 0.00 Km 0.00 4). On going works 1). Completed Works and under DLP
Minor Bridges Major Bridges 1Nos (317.19 Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Other Department Works
CD Minor Bridges 4 Nos (305.65,307.17,308.20,313.10 Km) - - - - - 0.00 Under From To L (in Km)
Village/ City Name Railway Crossing - - - - - 0.00 KRDCL 0.00
Railway Crossing Overlap Length - 0.00 0.00 KSHIP 0.00
Total Length (in Km) 27.41 Total Length (in Km) 0.00 0.00 SHDP 0.00
5). Eligible for Renewal Total Length (in Km) 0.00 Total Length (in Km) 0.00
HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km)
0.00 0.00 Ren 0.00 No. Details Length
1 1). Completed Works and under DLP 0.00
2 2).Maintenance for 2023-24 27.41
3 3).Proposed works under Annual Works 2022-23 0.00
4 4). On going works 0.00
5 5). Eligible for Renewal 0.00
Total Length (in Km) 27.41
Bar charts showing the details of works on National Highway's coming under jurisdiction of NH Circle Dharwad.
NH-63 Karwar NH Division PR work proposed. Work completed on 12.12.2018. Strengthening work completed. vide J.No.16-17-820 PR work proposed. Work sanctioned under PR for the year 19-20. work completed. Ylp town limit 16-17-008 Work sanctioned under PR for the year 19-20.Estimate to be submitted from division.
EPC work under progress. (J.No.KNT-16-17-838) From Km.142.75 to 267.600 handed over to NHAI. Only one time improvement from Km.187.00 to 193.50(Gadag city limit) and 248.30 to 255.16(Koppal city limit) is taken up by NH Dept. and works are completed.
NH-63 Hubli NH Division Work nearing completion. KNT-16-17-832 * The work Construction of minor bridge @ Km.112.30 with approaches from Km.110.00 to 112.800 -tender under process & * PR work from Km.112.800 to 128.85-estimate submitted to Ministry.
Chainage 106.00 110.00
IL PR Work completed on 28/12/2018. DLP was upto Dec-2019.
NH-206 Karwar Divn. (Honnavar sub-divn) Widening from Single/Intermediate Lane to two lane from Km 299.600 to 348.00 is under Progress & it will be completed on 28/02/2020
Vijaypur (4.4 to 56) & Hubli (56 to 193.35) EPC work is under progress and is nearing completion. (Job No.KNT-16-17-836) EPC work is under progress and is nearing completion. (Job NO.KNT-14-15-775) EPC work is under progress and is nearing completion. (Job NO.KNT-14-15-776) EPC work is under progress and is nearing completion. (Job NO.KNT-2012-735)
* Construction of 4-lane ROB @ Km.15 on NH-218:For land acquisition, 3(D) notified.
ROB at CH 0.50 work under progress 2L+PS-Work completed in 2017.DLP completed on 31 Mar-2020. 2L+PS-Work under progress. (Job No.17-18-869) 95 % work completed. 2L 2L Under M& R
IL-5.5m width IL
NH-367 Hubli (0.00 to 104) Estimate submitted under Annual plan 2021-22 2L+PS-Work under progress. (Job No.19-20-905) Work under progress. Estimate submitted under Annual plan 2021-22 PR work under progress
* Construction of 4-lane ROB @ Km.0.517 -Revised cost estimate/Financial bid submitted to Ministry.
0.00 to 71.00 is ylb and remaining ch. Comes under Naragund Sub-divn.
NH-367 Vijaypur (104 to 157.80) PR work proposed for the year 2019-20.
Widening to 4-laning work completed by KRDCL.
NH-766C Hubli Widening work estimate submitted to Central office. PR works from 170.2 to 177, from Km.179 to 189.7 & Km. 195.00 to 196.00 approved.The reach from Km. 177 to 179 & 189.7 to 195.00 are under DLP.
Work physically completed.J.No.16-17-800 4L
Work physically completed. J.No.16-17-800 2L
IL IL PR work estimate submitted to Ministry.
PR work costing 12.90 crores technical bid submitted to Central office on 27.12.2019.
NH-150A Kalaburagi (50 to 89.30)& Vijaypur (89.30 to 142.00)
* NH-150A from Km.0.00 to 50.00 handed over to NHAI.
* Construction of minor bridge @ Km 127.537 is under progress.( Est cost: 4.73 Crores)
* Widening of major bridge proposed @ Ch.171.60/Estimate costing 21.21 Crores submitted under Annual plan 19-20.
* FDR work- to Tungabhadra major bridge @ Km.198.24 costing Rs.1.25 Crores- Tender called.
Work under progress. 60% work completed. (J.No.KNT-16-17-823) Work under progress. 30% work completed. (J.No.KNT-16-17-816)
NH-50 Kalaburagi NH Division
*Construction of 4-lane ROB @ Km.66.90-agreement executed. Due to land acquisition appointed date is not issued.
*Humnabad town limit from Km.96.64 to 100.00 PR work estimate submitted.
* FDR work from Km.62.87 to 63.27 costing 45.00 Lakhs sanctioned- Tender to be called.
PR work costing 10.33 crores technical bid submitted to Central office on 27.12.2019. 2L+PS
NH-150E Kalaburagi NH Division
Work under progress. 70% work completed. (J.No.KNT-16-17-828) Yadgir town limit PR work submitted Work under progress. 80% work completed. (J.No.KNT-16-17-817)
NH-150 Kalaburagi NH Division
Widening to 2L+PS work-estimate submitted to Ministry under Annual plan.
NH-548B Vijaypur NH Division
IL Providing bitumen wearing course under M&R - Work completed in Dec-2019.
NH-161A Kalaburagi NH Division
SL-Single Lane-3.75m width
IL-Intermediate Lane-5.5m width
NH-752K Kalaburagi NH Division 2L-Two lane-7.0m width
2L+PS-Two lane along with Paved shoulder-10.00m width
0.00 48.20 6L- Six lane
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
43479 bid doc kw3.doc
Tender Document • 1.79 MB
PC and RB.xlsx
Others - PC and RB • 0.14 MB
PADABUDRI-CHIKKALAGUDDA - Copy.xlsx
Others - PADABUDRI-CHIKKALAGUD • 0.08 MB
RAICHUR BACHI.xlsx
Others - RAICHUR BACHI • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .