| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC KD ROAD KHALARI RANCHI 829205 JHARKHAND INDIA | RANCHI | RANCHI | JHARKHAND | 829205 | ₹8.0 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical PATIA BASTI NEAR WATER BOARD PLANT JITPUR DHANBAD JHARKHAND 828309 | DHANBAD | DHANBAD | JHARKHAND | 828309 | - | - | Rejected-Technical Reject |
| 3 | Rejected-Technical VEENA KUNJ KARMIK NAGAR ISM DHANBAD DHANBAD 826004 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 826004 | - | - | Rejected-Technical Reject |
Tender Value
₹9.4 L
EMD Value
₹11,800
Closing Date
1 Jun 2026, 6:00 pmClosed
AREA MANAGER (ENM) KATRAS AREA
OFFICE OF THE GENERAL MANAGER BCCL KATRAS AREA IV ENM DEPT. Post-SIJUA PIN-828121 JHARKHAND
CHANGING OF LEAKAGE 6inch PIPE APPROX 5 NOS. OF SUBMERSIBLE PUMP MOTOR SET AT 6 PIT SHAFT AFTER MAKING PLACE TO OPERATION CRANE BOOM ON SHAFT MOUTH BY PARTIALLY PORTION CUTTING REMOVING HEAD FRAME
2026_BCCL_359817_1
BCCL/KA/ENM/E-TEN/2026-27/02 DATE-18.05.2026
Open Tender
Electrical and Maintenance Works
15 days
ASGKCC KATRAS AREA IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,800
10 Jun 2026
18 May 2026
2 Jun 2026
18 May 2026
1 Jun 2026
18 May 2026
18 May 2026 - 25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ITEM DESCRIPTION / HEADLING | |||||
| 1.01 | (1) CHANGING OF LEAKAGE 6" PIPE APPROX 5 NOS. OF SUBMERSIBLE PUMP MOTOR SET AT 6 PIT SHAFT AFTER MAKING PLACE TO OPERATION CRANE BOOM ON SHAFT MOUTH BY PARTIALLY PORTION CUTTING & REMOVING HEAD FRAME & TRAMER SHED WINCH ETC.AT 6 PIT KCC UNDER,KATRAS AREA.:- DISMANTLING AND LOWERING ONE BIG PULLY WITH SHAFT & BLOCK FROM HEAD FRAME TOP TO SURFACE. (12 HEAD X 03 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 | - | SHIFT | 5,287 | - |
| 1.02 | SHIFTING OF MAIN PULLEY OF HEAD GEAR TOP. (12 HEAD X 03 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 | - | SHIFT | 5,287 | - |
| 1.03 | PARTLY CUTTING AND REMOVING / LOWERING OF HEAD GEAR TOP PLATE FRAME & REST FIXING. (12 HEAD X 07 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 | - | SHIFT | 5,287 | - |
| 1.04 | PARTLY CUTTING AND REMOVING / LOWERING OF BELL BOX PLATFORM & REST FIXING. (12 HEAD X 08 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 | - | SHIFT | 5,287 | - |
| 1.05 | BREASING,CROSS MEMBER GIRTER CHANNEL,ANGLE CUTTING & LOWERING & REST FIXING OF HEAD FRAME ONE SIDE. (12 HEAD X 08 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 | - | SHIFT | 5,287 | - |
| 1.06 | DAMAGED POWER WINCH ROPE DISMANTLING AND REMOVING TO LOADING POINT. (12 HEAD X 05 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 | - | SHIFT | 5,287 | - |
| 1.07 | ONE HAND WINCH WITH ROPE DISMANTLING AND REMOVING TO LOADING POINT. (12 HEAD X 04 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 | - | SHIFT | 5,287 | - |
| 1.08 | DISMANTLING AND REMOVING TRAMER FROM PIT MOUTH. (12 HEAD X 04 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 | - | SHIFT | 5,287 | - |
| 1.09 | ALL DISMATLED PARTS,WINCH GIRDER,ROPE CHANNEL ANGLE PULLEY ETC.LOADING AND UNLOADING TO WORK SHOP KCC. (12 HEAD X 05 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00 | - | SHIFT | 5,287 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.40 MB
BOQ_372687.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid