Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.6 Cr
EMD Value
₹11.4 L
Closing Date
5 Dec 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE BUNDELKHAND CIRCLE UPAVP JHANSI
SE BUNDELKHAND CIRCLE UPAVP JHANSI
Construction work related to establishment of Centre of Excellence in Government Polytechnic Talbehat Lalitpur in the third phase for upgradation of Government Polytechnic institutions of the state with the help of TTL
2026_UPHDB_1206456_1
603/AC-3/143 DATE 03.11.2026
Open Tender
Civil Works
Percentage
12 days
Construction work related to establishment of Cent
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,850
EXECUTIVE ENGINEER CD BUNDELKHAND-01 UPAVP JHANSI
₹11.4 L
7 Nov 2026
7 Nov 2026
5 Dec 2026
7 Nov 2026
5 Dec 2026
7 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-incharge. All kinds of soil. Excavation work by mechanical means /manual means upto 1.5 m. | 758.58 | cum | 129.24 | ₹98,038.88 |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil | 29.3 | cum | 92.33 | ₹2,705.27 |
| 3 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete(plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (3) Treatment of top surface of plinth filling 5 liters/sqm With Chlorpriphos EC 20% with 1% concentration | 659.94 | sqm | 230 | ₹1,51,786.2 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 117.49 | cum | 4,960.03 | ₹5,82,753.92 |
| 5 | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum . | 258.14 | cum | 6,920.7 | ₹17,86,509.5 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete | 433.74 | sqm | 285.54 | ₹1,23,850.12 |
| 7 | Steel reinforcement for R.C.C. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete above plinth level Themo-Mechanicdly Treated bars of grade Fe-500D or more. | 42,533.97 | kg | 72.56 | ₹30,86,264.86 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level & above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2.04 | Qtl | 7,852.89 | ₹16,019.9 |
| 9 | Filling availade excavated earth (exduding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20crn in depth, consdidating each deposited layer by ramming and watering, lead up to 50 and for lift. | 452.57 | cum | 142.71 | ₹64,586.26 |
| 10 | Providing and Laying Low Density Polyethylene (LDPE) sheet of 250 micron thickness below concrete laid over well prepared and compacted surface providing minimum 150mm overlap at joints sealing of joints with adhesive tape ,cutting to required size complete in all respects as per direction of E/I. | 911.97 | sqm | 162 | ₹1,47,739.14 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
TECHND.pdf
Tender Documents • 11.61 MB
BOQ_2287058.xls
BOQ • 0.54 MB
FINCHF.pdf
Tender Documents • 1.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .