Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC | ₹7.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.1 LRejected-Finance BILASPUR | ₹8.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹8.4 LRejected-Finance VILL TALSARI P O KALLAR TEHSIL SADAR DISTT BILASPUR H P | ₹8.4 L | L3 | Rejected-Finance L3 |
| 4 | L4₹8.4 LRejected-Finance | ₹8.4 L | L4 | Rejected-Finance L4 |
| 5 | L5₹8.5 LRejected-Finance 149 GHAGUS BHRATHU BILASPUR H P | ₹8.5 L | L5 | Rejected-Finance L5 |
Tender Value
₹10.0 L
EMD Value
₹10,012
Closing Date
9 Mar 2026, 11:00 amClosed
Sr. Executive Engineer
Sr. Executive Engineer, Electrical Division , HPSEBL, Bilaspur.
Tender for Shifting of existing 200KVA S/stn along with HT Line and LT Line from infront of the shopping Complex (under construction) main Bus-Stand to near at HPPWD Sub- Division Office Temple Trust Shri Naina Devi Ji under ESD Kot.
2026_HPSEB_130134_1
14(PRESS)/2025-26
Open Tender
Electrical Works
90 days
Bilaspur
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,180
₹10,012
13 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
Material Part of HT (TS No. 72/2025-26) (WBS No. D-25-1510)
Prov. RCC Muff with concerete filling
Prov. Dead End Clamps, Straight stapples, Bend Stapples & Eye socket ball cleaves etc.
Prov. CI X arm (100x50x6mm) length 1270mm
Prov. CI X arm (75x40x4.8mm) length 460mm
Prov. CI X arm (100x50x6mm) length 2340mm
Prov. CI X arm (100x50x6mm) length 2600mm
Prov. CI X arm (75x40x4.8mm) length 2800mm
Prov. AI X arm [ Angle iron (50x50x6mm), Length:2700 mm
Prov. AI X arm [ Angle iron (50x50x6mm), Length:1800 mm
Prov. MS AI (50x50x6mm) length 2800mm
Prov. AI X-Bracing Set - MS Angle Iron: 50x50x6,(2125*2)
Prov. AI X-Bracing Set - MS Angle Iron: 50x50x6,(1800*2)
Prov. AI knee bracing set 2(50x50x6mm) length 750mm
Prov. AI knee bracing set (50x50x6mm) length 450mm for supproting the GO switch handle
Prov. Stay set H.T. comp.
Prov. Earthing set complete
Prov.Full Clamps
Prov. Half Clamps
Prov.Top Clamps
Half clamp for holding the top clamp
Earth hook bolt
Prov. Danger plate
Prov. Nut & Bolts of various sizes (Galvanised / Coated ) [Preferable 16 mm Ø or more (With flat and spring washers )]
Prov. Barbed wire
Red oxide
Prov. Aluminium paint
GO AB Switch Unit (11 KV. 400A. 25 KV )
Material Part of LT (TS No. 72/2025-26) (WBS No. D-25-1510)
Prov. RCC Muff with concerete filling
MS angle iron knee bracing (65x65x6mm) length 600
MS angle iron knee bracing (75x75x6mm) length 600
Prov. CI X arm (100x50x6mm) length 600mm
Prov. Stay Set Complete (i/c stay clamp)
Full Clamp
Half clamp
LT Earthing set (preferbly coil earthing)
Prov. Nut & Bolts of various sizes (Galvanised / Coated ) [Preferable 16 mm Ø or more (With flat and spring washers )]
Prov. Red oxide
Prov. Aluminium Paint
Prov. AB cable (4X70+1X70+1X16mm² ) Cables)
AB cable suspension Assembly
Anchoring Assembly
Façade Hook
Material Part of 250KVA S/stn (TS No. 72/2025-26)(WBS No. D-25-1510)
Muff with concerete filling
X-arm [ Chhanel iron (100x50x6mm), Length:2800 mm X 2 Nos]
M S Angle Iron.(50x50x6mm) Length 2800 mmx(1 No) For LA
X-arm [ Chhanel iron (75x40x6mm), Length:2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
X-arm [ Chhanel iron (100x50x6mm), Length:460 mm X 2 Nos for supporting Main Channel of Transformer]
M S Angle Iron (50x50x6mm) Length 2800 mm x 2 Nos
M S Angle Iron (35x35x6mm)Length 460mm x 2 Nos
M S Angle Iron (50x50x6mm) Length 950 mm x 2 Nos
Prov. M S A.I (50X50x 6 mm), Length: 2800 mm X 2 Nos.
Prov. M S A.I (50X50x 6 mm), Length: 450 mm X 1 Nos.
Prov. M S A.I (75X40x 6 mm), Length: 460mm X 1 Nos. for GO Switch
GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
D.O Fuse Unit
Prov. Pipe Earthing set (With G.I. Strips 50x5mm,40x5mmx 25x5mm)
Surge Arrester, 9 kV Station Class (Porcelain Type)
Prov. Full Clamp
Prov. Half Clamp with Nuts & Bolts (M.S. Flat Iron 50X6 mm)
Prov. Nuts and Bolts of Various Sizes Galvanised / Coated) (Prefeably 16 mm ɸ or more with flat and Spring Washers)
Prov. Alluminium Thimble
Prov. Copper Thimble
Prov. Red Oxccide Primer
Prov. Aluminium Paint.
Prov. Danger Plate
Transformer Bed (Civil work)
Chain Link Fancing, Angle Iron, Gate etc for Transformer fancing
Erection Part of HT (TS No. 72/2025-26) (WBS No. D-25-1510)
Erection of ST pole 11/9 mtrs , muff i/c CC muffing with 1:2:4 ratio, CI-X-arm 1500*100*50mm for Single pole structure , drilling of holes in pole , pin insulator with pin, knee bracing set, barbed wire, danger plate, MS full clamps,top clamp, nuts and bolts off sizes, digging of pit, filling ramming and painting to all metal parts etc complete in all respect.
Erection of ST pole 11/9 mtrs , muff i/c CC muffing with 1:2:4 ratio, CI-X-arm 1500*100*50mm for double pole structure , drilling of holes in pole, pin insulator with pin, knee bracing set, barbed wire, danger plate, MS full clamps,top clamp, nuts and bolts off sizes, digging of pit, filling ramming and painting to all metal parts etc complete in all respect.
Erection of HT earthing (pipe earthing) set complete in all respect, digging of earth pit, filling of pit with required material and ramming complete in all respect.
Erection of HT stay set, stay wire, stay clamp, egg insulator, digging of pit, filling and ramming, fixing of stay rod, nozzeling and tightening etc. complete in all respect.
Erection AAAC 7/3.81 (80mm2) i/c laying, stringing, sagging, binding with insulators and jumpering etc. complete in all respect.
Laying of G.I. Wire 6/8SWG i/c stringing, sagging and binding with earth hook bolt for continous earth wire complete in all respect.
Erection of GO Switch complete in all respect.
Fixing of jumpers
Manual carriage for above material (Av. Lead 0.050Km.)
Erection Part of LT (TS No. 72/2025-26) (WBS No. D-25-1510)
Erection of LT steel poles 8/9 Mtrs long, shackle insulator with D-iron eye hook, digging of pole pit size 1.20x0.80x1.35 filling and ramming and painting etc complete in all respect
Erection of LT stay set, stay clamp, egg insulator, stay wire, stay thimble, nozzeling and tightening, digging of stay pit size 1.20*.80*.1.50 mtr, filling and ramming of pit complete in all respect
Laying of AB Cable LT (4X70+1X70+1X16mm² ) x 2 Cables)i/c stringing, sagging, binding with insulators and jumpering etc. complete in all respect.
Manual carriage for above material (Av. Lead 0.050Km.) (For 3-Ph Line)
Erection Part of 250KVA S/stn (TS No. 72/2025-26)(WBS No. D-25-1510)
Erection of 250 KV 11/0.4 KV Transformer , LT Penal Box, Energy meter ,LT Cable including loading and unloading Transformer and carriage of dismentelled 100 KVA transformer from site of work to section Store complete in all respect
Manual carriage for above material (Av. Lead 0.050 Km.)
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_192419.xls
BOQ • 0.32 MB
BIDDocument14press.pdf
Tender Documents • 0.81 MB
Download all tender documents and submit your bid