Loading…
Loading…
Tender Value
₹12.2 L
EMD Value
₹24,460
Closing Date
19 Jun 2026, 4:00 pm4d left
Executive Engineer RandB Division Bandipora
Office of the Xen RandB Division Bandipora
Repair and Renovation of Construction of Ziyarat Sharief Main Imran Sahib at Dardpora .
2026_PWDJK_312122_3
e NIT No 29 of 2026-27 Dated 10-06-2026
Open Tender
Civil Works
91 days
Bandipora
As per NIT
2 documents required · 2 mandatory
₹600
Executive Engineer R and B Division Bandipora
₹24,460
Bandipora near DC Office
11 Jun 2026
11 Jun 2026
20 Jun 2026
11 Jun 2026
19 Jun 2026
11 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in all kinds of soil by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by site Engineer | 27.13 | Cum | 479.3 | ₹13,003.41 |
| 2 | Supply and filling of dry stone soling in foundation trenches/under floors tightly hand packed with hand ramming, dressing ,watering including all carriages by mechanical transport from source to dumping site and Headload by mannual labour avg lead 300M upto the site of work complete. | 2.88 | Cum | 1,300 | ₹3,744 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level 1:4:8 (1 Cement: 4 coarse sand: 8 grade stone aggregate 40mm nominal size) including all carriages by mechanical transport from source to dumping site and Headload by mannual labour avg lead 300M upto the site of work complete. | 2.88 | Cum | 6,333.4 | ₹18,240.19 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level 1:2:4 (1Cement: 2 coarse sand: 4 grade stone aggregate 20mm nominal size) including all carriages by mechanical transport from source to dumping site and Headload by mannual labour avg lead 300M upto the site of work complete. | 37.57 | Cum | 7,721.8 | ₹2,90,108.03 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages by mechanical transport from source to dumping site and Headload by mannual labour avg lead 300M upto the site of work complete. | 3.75 | Cum | 8,868.35 | ₹33,256.31 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages by mechanical transport from source to dumping site and Headload by mannual labour avg lead 300M upto the site of work complete. | 5.71 | Cum | 10,901.8 | ₹62,249.28 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete at all levels, Thermo-Mechanically Treated bars of grade Fe-500D or more, including all carriages by mechanical transport from source to dumping site and Headload by mannual labour avg lead 300M upto the site of work complete. | 1,135 | Kg | 123.2 | ₹1,39,832 |
| 8 | Centering and shuttering including strutting propping etc. and removal of form for foundation, footings basses of columns etc . including all carriages by mechanical transport from source to dumping site and Headload by mannual labour avg lead 300M upto the site of work complete. | 107.46 | Sqm | 286.35 | ₹30,771.17 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for suspended floors, roofs, landings, balconies and access platforms. including all carriages by mechanical transport from source to dumping site and Headload by mannual labour avg lead 300M upto the site of work complete. | 47.58 | Sqm | 718.2 | ₹34,171.96 |
| 10 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in superstructure above plinth level upto floor five level including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand ) including all carriages by mechanical transport from source to dumping site and Headload by mannual labour avg lead 300M upto the site of work complete. | 13.78 | Cum | 10,613 | ₹1,46,247.14 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_1010338.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid