Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC | ₹3.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.6 L+₹8,826.65 (2.53%)Rejected-AOC | ₹3.6 L+₹8,826.65 (2.53%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | G S RAJEEV L2 | SABASTIAN MD L1 |
|---|---|---|---|---|---|
| 1.00Road Maintenance | |||||
| 1.00 | 3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m <br> Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 10.5 | cum | 34.42 ₹361.41 | 33.57 ₹352.49 Lowest |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 10.5 | cum | 7,888.99 ₹82,834.4 | 7,694.19 ₹80,789 Lowest |
| 1.00 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65) | 86.99 | sqm | 341.11 ₹29,673.16 | 332.68 ₹28,939.83 Lowest |
| 1.00 | 5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 990 | sqm | 12.38 ₹12,256.2 | 12.07 ₹11,949.3 Lowest |
| 1.00 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means :- Type A <br> (II) Bitumen (S-65) | 990 | sqm | 234.61 ₹2,32,263.9 | 228.82 ₹2,26,531.8 Lowest |
Tender Value
₹3.7 L
EMD Value
₹9,231
Closing Date
13 Mar 2025, 5:00 pmClosed
AE LSGD panathady gp
AE PANATHADY GP
Pro.No.366/24-25 Cherupanathady Kadamala Road Maintenance In panathady gp General Civil Work
2025_LSGD_745762_5
AE/LSGD/PDY/TEN/04/24-25
Open Tender
Civil Works - Roads
Item Rate
120 days
Panathady gp
Please refer Tender documents.
5 documents required · 5 mandatory
₹815
Yes
₹9,231
Yes
24 Aug 2026
5 Mar 2025
15 Mar 2025
5 Mar 2025
13 Mar 2025
5 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1203878.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .