| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.5 CrRejected-Finance | ₹1.5 Cr | L2 | Rejected-Finance L2 bidder |
| Sl No | Description | Qty | Unit | ABDUL SATHAR B A L2 | C.L MOHAMMED HANEEF L1 |
|---|---|---|---|---|---|
| 1.00Ground Development works - Construction of Mud Football and Badminton Court | |||||
| 1.01 | 2.31Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,926 | sqm | 15 ₹28,890 | 15.6 ₹30,036.80 |
| 1.02 | 2.33.1Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 26 | each | 500 ₹13,000 | 472.44 ₹12,283.43 |
| 1.03 | 2.33.2Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 4 | each | 2,000 ₹8,000 | 2,105.15 ₹8,420.61 |
| 1.04 | 2.33.3Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 3 | each | 9,000 ₹27,000 | 9,770.85 ₹29,312.56 |
| 1.05 | OD37307/2025-2026Filling with contractor's own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering and rolling every 3rd and top most layer with power roller of minimum 8 tonnes, for all leads including all lifts involved as per the direction of site Engineer- in-charge. ( Based on DSR Item No. 50.2.26.1 and 2.2.1) | 1,995 | cum | 470 ₹9.4 L | 386.5 ₹7.7 L |
| 1.06 | OD30073/2025-2026Supplying and stacking sieved red earth at site for measurement including royalty and carriage upto 5 k.m. lead,all labour charges for stacking, loading and unloading etc complete.( Based on CPWD 30.2.2 & 30.2.4.3) | 1,284 | cum | 950 ₹12.2 L | 837.91 ₹10.8 L |
| 1.07 | OD53642/2025-2026Supplying and stacking sieved sand at site for measurement including cost of sand, carriage upto 5 k.m. lead,all labour charges for stacking,loading and unloading etc complete.(Based on CPWD 30.2.2 & 30.2.4.3). | 321 | cum | 2,700 ₹8.7 L | 2,592.18 ₹8.3 L |
| 1.08 | OD53654/2025-2026Mixing Departmentally supplied sieved red earth and sieved sand in the required proportion specified or directed by the officer - in- charge including all cost of labour charges, hire charges of machineries etc. complete.(Based on CPWD 30.2.9) | 1,605 | cum | 46 ₹73,830 | 46.41 ₹74,487.25 |
| 1.09 | OD53657/2025-2026Spreading of mixed departmentally supplied sieved red earth and sieved sand in the required thickness as per direction of officer - in- charge including all cost of labour charges, hire charges of machineries etc. complete. | 1,605 | cum | 67 ₹1.1 L | 66.56 ₹1.1 L |
Tender Value
₹1.6 Cr
EMD Value
₹50,000
Closing Date
11 Nov 2025, 3:00 pmClosed
The Chief Engineer, Sports Kerala Foundation
Jimmy George Indoor Stadium, Vellayambalam, Thiruvananthapuram
Ground Development works - Construction of Mud Football and Badminton Court, Fencing, RCC Drain and Electric pole foundation, Laterite Step Gallery and Interlock block laying, Compound wall and Gate, Toilet Cum Office Building Open Stage, Bore well
2025_SKF_813095_2
251/SKF/CE/2025-26
Open Tender
Civil Works - Others
270 days
Kannur
Please refer tender document
7 documents required · 7 mandatory
₹5,900
₹50,000
27 Feb 2026
3 Nov 2025
13 Nov 2025
3 Nov 2025
11 Nov 2025
3 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1371535.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.40 MB
Tender Documents
Tender Documents • 1.37 MB
BOQ
BOQ • 0.39 MB
Other Document
Other Document • 1.46 MB
Download all tender documents and submit your bid