Loading…
Loading…
Tender Value
₹98,000
EMD Value
₹1,960
Closing Date
27 Jul 2026, 6:00 pm2d left
Executive Engineer REW Samba
Office of The Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_315885_23
19 REW Samba of 2026-27, Dated 13.07.2026
Open Tender
Civil Works
Percentage
30 days
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW Samba
₹1,960
14 Jul 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
27 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth . | 10.05 | cum | 479.3 | ₹4,816.97 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.15 | cum | 4,826.5 | ₹10,376.98 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 7.55 | cum | 5,733.6 | ₹43,288.68 |
| 4 | Centring and shuttering including strutting, propping etc. and removal of form work for:-
a) Foundation, footings, bases of columns. | 52.9 | sqm | 286.35 | ₹15,147.92 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.58 | cum | 7,788.4 | ₹4,517.27 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 41 | kg | 123.2 | ₹5,051.2 |
| 7 | P/Applying 12mm thick c.plaster in 1:6 c.mortar. | 35.3 | sqm | 266.2 | ₹9,396.86 |
| 8 | Carriage of Sand and Coarse Agg. Av. Lead of 5 km by M.T | 13 | cum | 200 | ₹2,600 |
| 9 | Provision for writing /CIB | 1 | no's | 3,000 | ₹3,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_1028149.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].