| 1 | L1₹1.3 CrAdmitted-Finance 421 6 NEAR DURGA ASHRAM CHATTARPUR SOUTH WEST DELHI SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | -10.20% | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹1.2 L (0.92%)Admitted-Finance | -9.37% | ₹1.3 Cr+₹1.2 L (0.92%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
14 May 2026, 6:00 pmClosed
commissioner
nagar nigam kota
nagar nigam kota area banjara colony and santpole school near road and box kalwart work 1 nit 3
2026_DLB_555875_1
NNK/XEN/CIVIL/2026/37-48 NIT 4
Open Tender
Civil Works
Percentage
180 days
kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
commissioner
₹2.8 L
Yes
18 Jun 2026
4 May 2026
15 May 2026
4 May 2026
14 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WORK NAME | |||||
| 1.01 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 150 | Cum | 229.5 | ₹34,425 |
| 1.02 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In hard rock (Blasting prohibited) Depth upto 1.5 m | 500 | Cum | 2,493 | ₹12,46,500 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 75 | Cum | 4,575 | ₹3,43,125 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 200 | Cum | 6,340 | ₹12,68,000 |
| 1.05 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kgCement up to 900 gms per cum of Concrete/ mortar. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 170 | Cum | 7,380 | ₹12,54,600 |
| 1.06 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar, M-35 Grade Concrete | 200 | Cum | 7,800 | ₹15,60,000 |
| 1.07 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars | 72,000 | Kg | 83.3 | ₹59,97,600 |
| 1.08 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 48 | Sqm | 236.5 | ₹11,352 |
| 1.09 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts. | 834 | Sqm | 375 | ₹3,12,750 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
3001.pdf
Tender Documents • 3.04 MB
BOQ_989953.xls
BOQ • 0.39 MB
Corrigendum11.pdf
PDF • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .