Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC BARDUBHI DHANBAD 828129 | DHANBAD | JHARKHAND | 828129 | ₹3.1 L Quoted ₹2.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.4 LRejected-AOC COAL INDIA LIMITED | ₹2.4 L | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.3 L
EMD Value
₹2,905
Closing Date
27 Feb 2026, 5:00 pmClosed
S.K.Panja
Office of the Project Officer,WJ Area
Dismantling, Transportation and Installation of numbers of Winches JSDB-19 from 4th rise of E9 TG XVI bottom seam to D19 TG 9th rise XVI (T) seam at Moonidih Colliery, W.J Area
2026_BCCL_353377_1
BCCL/WJA/MND/SUR/2025-26/97
Open Tender
Miscellaneous Works
10 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹2,905
23 Mar 2026
17 Feb 2026
28 Feb 2026
17 Feb 2026
27 Feb 2026
17 Feb 2026
Dismantling, Transportation and Installation of numbers of Winches JSDB-19 from 4th rise of E9 TG XVI bottom seam to D19 TG/ 9th rise XVI (T) seam at Moonidih Colliery, W.J Area
Dismantle winch from 4th rise of E9 TG analysis 6 skilled x 2shift is required. Total manshift= 12
loading, transportation manually and haulage, unloading of 1 winch from 4th rise E9 TG to d19 Tg/ 9th rise. Analysis Manshift reqired 6 unskilled x 8 shift=48 manshift
Cleaning & floor cutting in D19 tg/ between 9th rise ,(a) cleaning 4 x3x0.30 = 3.60m³, (b) floor 2 x 1.5 x 0.30= 0.90m³ . Analysis (a) for 4m³ cleaning 3 unskilled manshift is required. cost /m³ (3x1367.6)/4=Rs 1025.70/m³
(b) floor blasting/hand picking for 2m³ , 3 unskilled is required. cost /m³ = (3x1367.6)/2= Rs 2051.40/m³
P.C.C Work 1:2:4 ( 1 Cement: 2 Course Sand Zone III : 4 grade stone aggregate 40mm normal size . 2 X1.5 X 0.4 (avg.)= 1.20 m³
installation of Winch at D19TG, analysis manshift required (skilled) = 8 manshift x 2 shift = 16 manshift skilled
transportation of one Switch,Transportation and laying ( E9 TG) of Starting cable and power cable (150m) from 4th rise E9 TG to 9th rise d19 tg . Analysis Required un skilled manshift = 6 manshift x 5 shift = 30 manshift.
transportion of cable from (1) surface and (2) E9 BG to D19 TG ,Analysis unskilled manshift is require = 6 manshift x 2shift = 12manshift.
laying of (1) signal cable 400m,(2) lighting cable 400m, (3) audio cable 400m . Analysis unskilled manshift required= 6 manshift x3 shift =18 manshift.
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
CMPF, Pension and admin. Charge of Employee Un Skilled
CMPF, Pension and admin. Charge of Employee SemiSkilled
CMPF, Pension and admin. Charge of Employee Skilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_366165.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid