| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.0 L+₹3,480.17 (0.70%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹5.9 L+₹98,911.50 (20.0%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹5.9 L+₹99,059.42 (20.0%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹5.9 L
EMD Value
₹14,829
Closing Date
26 Aug 2023, 5:00 pmClosed
Assistant Executive Engineer, chalakudy
o/o Asst Exe EngineerIrrigationsub divi2,chalakudy
Rectification of canal
2023_Irrig_597010_1
IRR/PII/TR/2814/2023_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
90 days
chalakudy
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,310
Yes
₹14,829
Yes
6 Oct 2023
19 Aug 2023
1 Sept 2023
19 Aug 2023
26 Aug 2023
19 Aug 2023
19 Aug 2023 - 26 Aug 2023
Amount
APPENDIX-A
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
N D JOHNSON
STALIN V V
MOHANAN K.K
Bidder Name
E V POLLY
STALIN V V
N D JOHNSON
MOHANAN K.K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_886055.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .