| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | ₹1.9 L Quoted ₹18.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹19.9 LRejected-Finance | ₹19.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹20.9 LRejected-Finance | ₹20.9 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | WILSON THOMAS L2 | MOHAMMED NAFAISE E K L1 | PYNADATH VARGHESE STEPHEN L3 |
|---|---|---|---|---|---|---|
| 1.00proposed drain | ||||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.62 | cum | 2,681.68 ₹1,676.05 | 900 ₹562.50 | 2,977.95 ₹1,861.22 |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 3.6 | cum | 1,855.97 ₹6,681.49 | 750 ₹2,700 | 1,947.86 ₹7,012.30 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 167.25 | cum | 266.93 ₹44,644.04 | 300 ₹50,175 | 280.14 ₹46,853.42 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 8.7 | cum | 6,125.21 ₹53,289.33 | 6,200 ₹53,940 | 6,428.48 ₹55,927.78 |
| 1.00 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 530.8 | sqm | 644.62 ₹3.4 L | 470 ₹2.5 L | 676.53 ₹3.6 L |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 79.65 | metre | 183.29 ₹14,599.05 | 180 ₹14,337 | 192.37 ₹15,322.27 |
| 1.01 | 5.9.16.2:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsAbove 20 cm wide | 24.65 | sqm | 780.07 ₹19,228.73 | 520 ₹12,818 | 818.69 ₹20,180.71 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 19.12 | cum | 8,165.71 ₹1.6 L | 8,900 ₹1.7 L | 8,570 ₹1.6 L |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 62.31 | cum | 7,719.34 ₹4.8 L | 7,700 ₹4.8 L | 8,101.53 ₹5.0 L |
Tender Value
₹22.1 L
EMD Value
₹50,000
Closing Date
3 Sept 2024, 2:00 pmClosed
The Executive Engineer
Office of the Executive Engineer, PWD Buildings Division Ernakulam
This new proposed work balance part of drain for a stretch of 76m and raising of existing drain for 47m
2024_PWD_687682_1
PWD/BLDG/TR/1528/2024_5_1_1/1
Open Tender
Civil Works - Buildings
180 days
Edayar, Kalamassery
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
4 Jun 2026
24 Aug 2024
5 Sept 2024
24 Aug 2024
3 Sept 2024
24 Aug 2024
24 Aug 2024 - 3 Sept 2024
Amount
proposed drain
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.9.16.2:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsAbove 20 cm wide
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
WILSON THOMAS
PYNADATH VARGHESE STEPHEN
Bidder Name
PYNADATH VARGHESE STEPHEN
WILSON THOMAS
MOHAMMED NAFAISE E K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid