Loading…
Loading…
Tender Value
₹12.6 L
EMD Value
₹13,000
Closing Date
21 Oct 2026, 6:00 pm
Executive Engineer, Surendranagar Irrigation Division, Surendranagar
M & R work of Canal System at Wadhawan Bhogavo-1 (Nayka) Irrigation Scheme For The Year 2026-27.
352975
09 of 2026-27
Open
Civil Works - Others
Lump-sum
Surendranagar
9 documents required · 8 mandatory · 1 optional
₹900
Executive Engineer, Surendranagar Irrigation Division, Surendranagar
₹13,000
7 Oct 2026
7 Oct 2026
7 Oct 2026
21 Oct 2026
7 Oct 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
SURENDRANAGAR IRRIGATION DIVISION - SURENDRANAGAR
WADHWAN BHOGAVO-1(NAYKA) IRRIGATION SCHEME
Name of Work : M & R work of Canal System at Wadhawan Bhogavo-1 (Nayka) Irrigation Scheme For The Year 2026-27.
Memorandum showing Items of Woks to be carried out
Item No Quantities Item of work ESTIMATED RATES Unit Total amount
Item No Quantities Item of work ESTIMATED RATES Unit Total amount
estimated but In Figures In words according to
may be more or estimated
less quantities
1 1155.42 Earth work in embankment from borrow pits in all sort of soil and soft murrum or 78.00 Rupees SeventyEight Cum
other suitable strata as directed incl breaking clods and dressing to the design Only
section with lead as under and all lift incl.site clearance etc comp. For all canal
capacity & Without rolling and watering 200 to 1000 mt lead.
2 Clearing the shrubs like ankada weeds and other vegetation including depositing
the same outside and burning etc. complete from canal bed and both side Slopes
and upto outer toe of bank.(For Canal and drain).
11.676 (A) Upto 0.56 cumecs 5917.00 Rupees Five Thousand Km
Nine Hundred Seventeen
10.189 (B) 0.56 to 7.00 Cumecs 8875.00 Rupees Eight Thousand Km
SeventyFive Only
3 3813.27 Cutting & removing green water grass (pine) with silt under slushy condition 19.70 Rupees Nineteen Paise Sqmt
from canal bed or bucket including dispose off and cleaning the surface including Seventy Only
removal of sily,debris etc for all lead & lift etc complete as directed.
4 3452.27 Clearing the silt from canal /drain bed by digging the same to the required bed 166.00 Rupees One Hundred Cum
level and gradient including depositing the excavated earth regularly on spoil SixtySix Only
bank for utilizing the same for preparing the bund after bracking the clods as and
where directed for lead upto 30 mt and lift as under.( Excluding weed cutting )
(A) Depth 0 to 3.0 Mt.
5 45.35 Desilting of various structure of canal and distribution system including 296.00 Rs. One Hundred Sixty Cum
depositing the same as directed with all lift and lead for canal syphone, air vent, Six Only
Turn out Kundies etc complete.
6 25.27 Dismantling of RCC work viz. slab, beam, lintel, barrel,staircase, etc. including 1362.00 Rupees One Thousand Cum
removing the steel from the dismantled portion without damage to reinforcement Three Hundred
sorting and stacking of useful and unuseful material from the dismantled material SixtyTwo Only
as directed etc comp.
7 46.27 Prov. & laying in position "NOMINAL MIX" cement concrete using 4452.00 Rs. Four Thousand Four Cum
cement,sand and crushed aggregate by mass and machine mix for C.C work Hundred Fifty Two Only
incl. necessary formworks centering, scaffolding compaction by mechanical
vibrator,curing as directed with all lead & lift etc. complete
FOR GENERAL PURPOSE (E) Concrete grade 1:1.5:3 and MSA-20 mm
(Reg. SOR-2024-25, Ch.6, Page no.24, Item no.12(E)
8 9.00 Exacavation in all sort of strata and formations incl.depositing the unuseful 83.00 Rupees EightyThree Cum
excavated stuff as and where directed incl.sorting and stacking useful materials Only
as directed upto 30 mt lead etc.complete incl.dewatering (Depth 0.0 To
mt) (for all type canal & foundation trenches of C.D Works) (A) In
Overburden incl. hard murrum
9 0.186 Providing,cutting,bending,binding and fixing in position as per drawing .TMT 76574.00 Rupees SeventySix M.T.
BAR , reinforcement for R.C.C. works and anchor bars incl cost of black Thousand Five Hundred
SeventyFour Only
annealed 16 to 18 BWG M.S. Wire etc.complete with all lead and lift.
10 736.0000 Repairing deep cracks in masonry structures by raking out joints, with C.M 1:5 120.45 Rs. Seventy Six Rmt
to fill internal voids up to 50cm depth, including deep cleaning, water flushing, Thousand Five Hundred
Seventy Four Only
manual steel rod compaction, curing and finishing the surface complete as per
technical specifications and direction of the Engineer-in-Charge."
11 9.00 Dewatering for earthen dam and allied works,foundation areas,pits,trenches etc 27.00 Rupees TwentySeven Hp-hrs
incl cost of pumping machineries,pipe lines,labours diesel/electricity/DG set, Only
In Words Rs. Rupees Twelve Lakh FiftyFive Thousand Five Hundred FiftyFour Paise SixtyOne Only
I/We am/are willing to carry out the work at % above/ below present (should be written in figures and words)
of the estimated rates mentioned above. An amount of my/our tender works out as under:
* Estimated Amount * Estimated Amount
Put to tender Rs_____________________________ Put to tender Rs_________________
In Words (Rs. ) In Words Rs.( )
(Pease strike out whichever is not applicable)
Note-1: The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge for which no extra payment shall bemade.
Note-2: Thel abour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note-3: GST and Incometax TDS will be deducted at a source while making payments of bills
Note-4: In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is
a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Note-5: Concrete and bitumin Mix Design Should be carried out by Contractor of his own cost.
Executive Engineer
Signature of Contractor. Surendranagar Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 TITLE PAGE.pdf
02- E Tender Notice.pdf
03- Invitation For Bid P 1 to 6.pdf
04 SECTION-1 Instruction to Bidders P 7 to 27.pdf
05 SECTION-2 Qualification Information P 28 to 34.pdf
06 SECTION-3 Conditions of Contract P 35 to 64.pdf
07 SECTION-4 Contract Data P 65 to 74.pdf
08 SECTION-5 Tech. Specification P 75 to 146.pdf
09 SECTION-6 Form of Bids P 147 to 149.pdf
10 SECTION-7 Bill of Quantities P 150 to 152.pdf
11 BOQ P 153 TO P 154.pdf
12 SECTION-8 TO 10 FORMS DRAWING DOCUMENTS.pdf
13 ANNEXURE-A P 170.pdf
14 ANNEXURE-B P 171.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .