Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAccepted-Finance | L1 | Accepted-Finance L1 Bidder | |
| 2 | L2₹30.9 L+₹1.0 L (3.44%)Accepted-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | L2 | Accepted-Finance L2 Bidder | |
| 3 | L3₹34.1 L+₹4.2 L (14.0%)Accepted-Finance B 383 KANCHIRAM NAGAR MORADABAD | L3 | Accepted-Finance L3 Bidder |
Tender Value
₹37.8 L
EMD Value
₹38,000
Closing Date
1 Jan 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC I, Lucknow
Pareshan Bhawan, Vibhuti Maga, Lucknow
Work
2023_UPTCL_868343_1
e-tender 72/2023-24
Open Tender
Electrical Works
Piece-work
45 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
Yes
A/c No 2408002190005438, IFS PUNB0691100, PNB, Lko
₹38,000
Yes
16 Jan 2024
6 Dec 2023
2 Jan 2024
6 Dec 2023
1 Jan 2024
6 Dec 2023
Amount
Supply Items
1) Supply of Bolted type single tension fitting suitable for Single Moose conductor without Turn buckle ,D-socket, Ball assembly hook ,yoke,plate, d-clip, tension clamp etc with duly made of LM6 aluminium alloy complete with GI nuts and bolt and spring/plain washer. As per technical specification
2) Supply of Bolted type single suspension fitting suitable for single Moose conductor with duly made of LM6 aluminium alloy complete with GI nuts and bolt and spring/plain washer. As per technical specification
3) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Moose/Moose complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.
4) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Moose/Zebra complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.
5) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Moose/Panther complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.
6) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Zebra/Zebra complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.
7) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Zebra/Panther complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample
8) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Panther/Panther complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.
9) Supply of Bus Post Clamp Suitable For Twin Panther duly made of LM6 aluminium alloy complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.
10) Supply of Bus Post Clamp Suitable For Panther duly made of LM6 aluminium alloy complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.
11) Supply of bimettalic 33KV CT clamp made of brass length 4" hollow type with slot of dia as per dimension of CT rod and remaining portion of lenth 10" made of aluminium flat type Twin Moose conductor as per sample
12) Supply of bimettalic 33KV CT clamp made of brass length 4" hollow type with slot of dia as per dimension of CT rod and remaining portion of lenth 10" made of aluminium flat type Twin Panther conductor as per sample
13) Supply of bimettalic 132KV CT clamp made of brass length 4" hollow type with slot of dia as per dimension of CT rod and remaining portion of lenth 10" made of aluminium flat type Panther conductor as per sample
14) Supply of 33KV Jaw made of aluminium alloy LM6 one side connecting Twin panther conductor and another side connecting with the Isolator Thimble/ plate complete with clamp HDG nut - bolts and washer as per sample
15) Supply of 33KV isolator clamp made of aluminium alloy LM6 one side connecting Twin panther conductor and another side connecting with the Isolator Thimble/ plate complete with clamp HDG nut - bolts and washer as per sample.
16) Supply of 33KV isolator clamp made of aluminium alloy LM6 one side connecting Twin Moose conductor and another side connecting with the Isolator Thimble/ plate complete with clamp HDG nut - bolts and washer as per sample
17) Supply of 132KV isolator clamp made of aluminium alloy LM6 one side connecting Zebra conductor and another side connecting with the Isolator Thimble/ plate complete with clamp HDG nut - bolts and washer as per sample
18) Bimettalic terminal connector for 63MVA LV side 33KV Bushing rod 60mm dia duly made of LM6 aluminium alloy suitable for Twin Moose complete with HDG GI nuts and bolt and spring/plain washer as per technical specification & sample.
20) Supply of following Portable fire extinguishers carbon di oxide co2 type complete with hose pipe and all other accessories and fitting as per IS 2878/1986
iii) 4.5 KG
21) Supply of AFFF Portable fire extinguishers mechanical foam type complete with initial charge hose pipe and all other accessories and fitting as per IS 1024 Trolley /wheel mounted 45/50 litre capacity
22) Supply of Dry Chemical Powder type fire Extinguisher of 4.5 KG Capacity Conforming with IS 2171/1988 as per technical specification
23) Supply of Sand Bucket
24) Supply of Sand for Sand Bucket
25) Supply of Pressure gauge and coupling device /drill
26) Supply of NS type HRC fuse set rating-10 Amps
27) Supply and refilling of SF-6 gas with 99.99 % Purity having dielectric strenght, dew point , water content and other properties conforming as per latest IS Required for mantenance of SF-6 C.B. at following sub station of empty cylinderfrom different sub station under ETD.
Supply for 132kv Bus Coupler Bay
28) Supply of Bolted type single tension fitting suitable for Single Moose conductor without Turn buckle, D-socket, Ball assembly hook ,yoke,plate, d-clip, tension clamp etc with duly made of LM6 aluminium alloy complete with GI nuts and bolt and spring/plain washer. As per technical specification
29) Supply of Bolted type single suspension fitting suitable for single Moose conductor with duly made of LM6 aluminium alloy complete with GI nuts and bolt and spring/plain washer. As per technical specification
30) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Moose/Moose complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.
31) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Moose/Zebra complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.PG Clamps Suitable For
32) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Moose/Panther complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.PG Clamps Suitable For
33) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Zebra/Zebra complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.
34) Supply of Bus Post Clamp Suitable For Moose duly made of LM6 aluminium alloy complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.
35) Supply of 132KV CB clamp made of LM6 one side connecting single Moose conductor and another side connecting with theCB plate complete with clamp HDG nut - bolts and washer as per sample as per sample
36) Supply of 132KV isolator clamp made of aluminium alloy LM6 one side connecting Moose conductor and another side connecting with the Isolator Thimble/ plate complete with clamp HDG nut - bolts and washer as per sample
Supply of 33 KV Side New 63 MVA T/F Bay with Twin 36KV,1Cx630sqmm Copper Power Cable
37) 36KV Termination Kit at both ends for 1CoreX630SQMM XLPE COPPER CABLE suitable for above cable with all accessories.
38) Alluminium Alloy Single Clamps FOR SUPPORT as per sample
39) 33kv Bus Post Terminal Connectors SuitableTermination kit on either side.
40) HDPE Pipe suitable for above cable
41) Warning Tape
42) Route Marker
43) 36KV Bus Post Insulators for Terminal Support
44) Cleat type clamp Bus post (75xmm GS flat) suitable for Twin Moose Conductor on one side and and Termination kit of above cable on either side
Work of Installation of New 63 MVA T/F
45) Shifting/Dragging of Main tank of 63 MVA Transformer up to 20 mtr distance including turning of the tank ,as required alongwith associated accessories from existing place to near open space/safe loading place at 220 Kv Substation Hardoi Road with all due care of safety & precautions.
46) Additional shifting of Transformer tank upto 30 mtr distance at 220 Kv Substation Hardoi Road (1 Job for every 5 mtr.)
47) Erection of 63 MVA Transformer RTCC Panel including shifting from storage place to control Room.
48) Safe Carriage of 50 KL Transformer oil tank for centrifuging of Transformer oil from 220 KV Substation Sarojninagar any other UPPTCL S/S within( approx distance 60Km.) and after completion of work return the oil storage tank including loading from 220kv hardoi road and unloading at other substation as per T/F supplier guidelines.
49) Performing following precommisioning CT test on all Turret CT before erection of 63 MVA T/F. A) Ratio Tests b) IR Test c) continuity Test d)Winding Resistance e)Polarity Test d) IR of CFT
50) Performing Pressure test using Dry Air on All Radiators @0.3 kg/cm2 with hold time 30mins for checking leakage before erection of 63MVA T/F. (b) Performing Leakage test on Air Cell using Dry Air with pressure 0.07 kg/cm2 & prssure test on conservator tank using dry air with pressure 0.5 kg/cm2 ( Air cell should not being pressurised condition ) for checking leakage before erection of 63MVA T/F . If Pressure drops leakage point to be identified and rectified. Note- Dry Air plant to be arranged by contractor.Note-Any other tests required by T/F manufacturer will be in contractors scope.
51) Performing precommisioning Tan Delta tests on HV & LV Bushings of transformer before erection of 63 MVA T/F using standard testing kit with valid calibration certificate. Note-Any other tests required by T/F manufacturer will be in contractors scope.
52) Complete erection of 63 MVA Transformer including Radiators, Conservator Tank, Bushing, Connecting pipe lines, Cooling fans and pumps, Marshaling box, OTI, WTI, Capillary pipes etc.
53) Filling of fresh Transformer oil from Transformer oil drums in suitable capacity oil stortage tank and then centrifuging of transformer oil by ultra high vaccum oil Filtration plant after connecting the centrifuging pipes with oil tanker to oil filtration plant including taking the BDV value of oil periodically till the required value is achieved with all cost of centrifuging machine CFM operator, lubricant etc. Note- Before Filling Oil in storage tank for centrifusing the BDV ,PPM test to be performed.
54) Centrifuging/Dehydration of the complete Transformer oil of 63 MVA Transformer by ultra high vacuum oil filtration plant after connecting the centrifuging pipes with Transformer tank to oil filtration plant. Including taking the BDV values of oil and megger values of the Transformer periodically till the required value is achieved. Including filling and topping up of the Transformer oil under vacuum in Main tank , Radiator , Conservator tank etc. and attending the oil leakages if any, will all cost of centrifuging machine , CFM operator , Lubricant etc.
55) Performing complete testing of Transformer with standard testing equipment with valid calibration certificate . Following tests are to be completed Tan-delta and capacitance measurement at standard as well as variable frequencies of 3 no. HV,03 no. IV and 03no. LV bushing (using omicron/megger kit) after erection (b) LV testing of ttransformer including magnetising current test , magnetic balance test , measurement of winding resistance test, vector group, insulation resistance, core insulation, voltage ratio test, short circuit test, open circuit test, .Test report to be compiledand submitted in required formatas per satisfaction of competent authority.Note-Any other tests required by T/F manufacturer will be in contractors scope.
56) Sampling & testing of transformer oil at CPRI or any other NABL testing lab including cost of transportation of sample in standard sampling bottle (adequate no. of bottle arranged by contractor) . samples to be taken at following intervals . 1 Before filling in transformer main tank & OLTC -02 samples 2. Before charging -05 samples at top & bottom of main tank & OLTC -3 samples. Following test to be Performed - 1-BDV 2)PPM 3)Tan delta 4) Resistivity 5) Interfacial tension 6) Particle count 7 ) DGA (one job for each sample Note-Any other tests required by T/F manufacturer will be in contractors scope.
57) Erection of main and auxiliary structure consisting of columns, beams, peaks, masts etc. and auxiliary structures required for installation of Bays ALP/ABL/BBL/BCT’s etc. including shifting of all material i.e. structure parts nuts, bolts washer etc. from store to site of erection, erection of structure as per drawings and practices using flat and spring washer with each bolt. Matching of holes, cutting, matching of member if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by the UPPTCL free of cost but all men, material and T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost.
58) Erection of Equipments :- Erection of following equipments as per instruction manual of various equipment and technical specification including shifting of material/equipment from store to erection site including all other associated work to complete the job satisfactorily :-
i) 145 KV C.T. with JB
ii) 120 KV LAs.
iii) 132 KV C.B.
iii) 132 KV BI
iii) 145 KV Tandem Isolator.
iv) 132 KV PI
v) 132 KV Control &Relay Panel
vi) 33 KV C.B.
vii) 33 KV C.T.
viii) 33 KV BI
ix) 33 KV LA
x) 33 KV PI
59) Laying of following sizes of unarmoured copper control cables in the cable trenches from Transformer C&R Panel to Marshling Box,132/33kv CT to CRP, equipments junction boxes, RTCC panel to DM box, Transformer to marshling box, CB to Transformer marshling box,interpanel wiring, WTI,OTI,RTD sensors, Fan &pump wiring etc as per requirement & cable schedule, it's saddling with 25x3 mm Al saddle at every 750mm distance including carriage of cable drum from store to site and shifting back to store and all other associated works to complete the job satisfactory as per technical specification.
i) 10 x 2.5sqmm unarmoured copper control cable
ii) 6 x 2.5sqmm unarmoured copper control cable
iii) 4 x 2.5sqmm unarmoured copper control cable
iv) 2 x 2.5sqmm unarmoured copper control cable
60) Earthing of main tank of the Transformer, RTCC Panel, Marshalling box, drive mechanism of the cooling fans etc.of 63 MVA Transformer with the help of 50 x 6 mm / 75 x 10 mm size M S flat (to be provided by Department), its jointing with already laid earthmat and necessary modification in existing support for earthing of Neutral bushing and then painting of earthing strips as per technical specification/ standard practices .
61) Earthing of Transformer HV & LV neutral with 50 x 6 mm / 75 x 10 mm size M S flats , connecting with delta including making additional delta at two places and other associated work as per technical specifications.the Neutral Earthing of Transformer is to be connected with 2 MS flat of size-75x10mm strips and these strips shall be connected with the earth electrode system at X & Y-axis of Main Earth mat of s/s for appropriate protection of 63MVA T/F
62) Carriage of sub-station structure through private truck from EFU Naini (Allahabad) to above sub-stations alongwith sorting, shifting and loading at Naini and unloading and stacking at 220 KV Substation Hardoi Road, Lucknow
i) Sorting out and stacking of main & auxilary structure as per BOM at EFU Naini (Allahabad)
ii) Loading of structure on Pvt. Truck / trailer at EFU Naini.
iii) Transportation of structure from EFU Naini, Allahabad to sub-stations
iv) Unloading and proper stacking of structure parts at Sub-stations
63) Laying MS flat for Earthing of Structures/equipments by cutting,. bending , laying 700mm below ground level as per Corporation norms in the following way: Double earthing of all structure and equipments. One earthing will be from top and another from bottom by 50x6mm/75x10mm MS Flat to be provided by dept. free of cost.Work includes excavation and backfilling of soil
i) 25x6mm. MS Flat
ii) 50x6mm. MS Flat
iii) 75x10mm. MS Flat
64) Laying of M.S. round 40mm dia. including cutting, straightening and laying in trenches at the depth 800mm below ground level including dap/cross jointing by M.S. welding electrodes and 50x50x6mm 10mm M.S. angle. Painting joints with bituminus including excavation and back filling etc as per specification of laying earth mat given by Engineer of work (M.S. round shall be provided by deptt. free of cost.)
65) Painting of newly erected MS Flat following with 01 coat red oxide and 02 coat with bus green ISI mark paint complete with its MS Flat & vertical support.
i) MS Flat 50x6 mm
ii) MS Flat 75x10mm
iii) MS Flat 25x6mm
66) Jumpering interconnection of equipments through various ACSR conductor of various 132kv equipments (CT/PI/CB/LA/ISO/Bushing/CT-Term. kit/Kit-kit) with Main/Transfer/jack bus of ACSR Twin Moose conductor.The work includes cutting of conductor ,bending in proper shape ,clamping with help of clamps and other associated work to complete job satisfactorily.(1 job includes 3 phases jumper)
i) 63MVA T/F Bay of 132kv/HV side through Panther conductor
ii) 63MVA T/F Bay of 33kv/LV side through Twin Moose conductor
67) Opening of old & existing jumpers of ACSR Panther conductor from Line/Transformer Isolator to Transfer Bus on 63MVA T/F HV side bay
68) Raising of Height of Jumper between Transformer LV Side Bushing and LAs by installation of 33 KV Post Insulator Increasing the height can be increased by adding upper angle joints duly fabricated using scrap angles to the ALP Structure available of substation Store As per required height by direction of JE/SDO
69) Stringing of 33KV Jack Bus Passing overhead 63MVA T/F for End termination to 33KV Gantry for LV of 63MVA T/F BAY of ACSR Twin Moose conductor including fitting of tension clamp, hoisting of Disc Insulator, cutting of conductor and also shifting of all materials from store site.(1 Section includes 1 phase= 24 Mtr.)
70)Stringing of 132KV Jack Bus FOR 63MVA T/F HV from CB to BI of ACSR Moose conductor including fitting of tension clamp, hoisting of Disc Insulator, cutting of conductor and also shifting of all materials from store site.(1 Section includes 1 phase= 21 Mtr.)
71) Carriage of 1.5Ton of 40sqmm MS ROD from 132kv Rahimabad/ Any s/s within this Range to 220kv s/s Hardoi road or any other s/s in lucknow in range of 60km (Approx) through private truck including loading at 132kv Rahimabad s/s/or any s/s and unloading at 220kv Hardoi road s/s by using Hydra with required Manpower ,T&p in scope of contractor to complete job satisfactorily.
72) Fabrication of 3meter long electrodes with following MS rod having 150mm long conical shape and then its placing vertically inside ground with 700mm below ground level including cutting,bending,machining of electrode (electrode provided by dept.)
73) Making proper allignment of operating mechanism of 33kv Main/T/F bus isolator of Existing 33kv feeders bay and reparing connecting Pipe &operating pipe.(Bay-Uptron, Noorbari, Basant kunj, Radhagram)
74) Providing and fixing of Protective MS Iron Mesh/ Jali of size (3.5x3.5mtr approx) on both side of 63MVA T/f (HV &LV) to protect Radiators from any damage.Work includes proper grouting of MS angle support stand/structure adjustable to radiator height.
75) Supply and fixing of new generation energy saving environment friendly long life versatile pressure die casting aluminium outdoor high beam flood light with high power of LED street light luminaries 120 watt of havells/CGL /any standard make. Transportation upto site, insurance etc. and any other job requested to properly execute the complete work.
76) Supply and fixing of junction box on gantry structure of size 200mmx200x150mm made of MS sheet of 16 gauge duly powder coated in side fixing 1no. 6amp MCB ,1no. TB of 1no. terminal, and 1no. 16amp fuse fixed on MICA sheet and back side MS clampalong with PVC pipe fixing on junction box.half round GI PIPE OD 50mm for mounting the 120watt LED light upon gantry mounting of 02no. Bracket upon gantry and fixing GI pipe complete with Nut & bolts and washer.
77) Supply and fixing of half round GI PIPE OD 50mm for mounting the 120watt LED light upon gantry mounting of 02no. Bracket upon gantry and fixing GI pipe complete with Nut & bolts and washer.
78) Safe Carriage of following items from Various s/s to 220kv s/s Hardoi road ,distance- 120km (Approx) using private truck including loading at 220kv Mohan road s/s and unloading at 220kv Hardoi road s/s using Hydra with required Manpower ,T&p in scope of contractor. Item list as folows- 70kn discs
79) Material shifting after dismantling lying in approach road for 63MVA T/F .Work includes Loading, , unloading and proper stacking of following structure and Scrap/ Miscellaneous 220 KV,132KV and 33 KV equipments and materials from different locations of switchyard to store and open yard store at 220 KV Substation Hardoi Road,Lucknow using Hydra/ Manpowerto create space for Bank and clear road for 63MVA T/F .
i) 33 KV circuit breaker
ii) 220 KV CT's
iii) Various size of Structure
iv) Oil drum
v) Conductors old used in pices.
vi) Conductors Drum
vii) Temprorary Guard Shed
80) Installation, Testing and commisioning work for Time synchronisation of 63MVA T/F RELAYS includes following
i) Supply ,Testing IRIG -B combo Hub output-IRIG-BAM -5no. And IRIG -B PWM-5no.
ii) Installation and commisioning work of GPS in all relays connections including Providing,fixing cables/converter as required.
Work of Shifting of 132 KV Bus coupler bay
81) Termination/Connection using copper lugs (ring/pin type 25mm) of the control cable as per new cable schedule of 63 MVA Transformer and its OLTC/ RTCC panels at both end and control and Relay panel , cooling fans ,OTI,WTI , Marshaling box,CB,Bus bar panel, TBC panel interpanel wiring etc.using existing cable including laying, dressing and binding of additional control cables if required as per site requirement and termination along with making necessary holes using glands plate or box where ever required. Fixing of cable glands of appropriate size , providing of ferrules and cable termination as per standard practice and all other associated works as per technical specification .
82) Opening, and de-termination of cables of Existing132KV Bus coupler Bay control and relay panel and yard side equipments alongwith shifting and re termination cables upto New 132KV B/C panel bay as per requirement to complete the job satisfactorily. Work inludes Rerolling of extra cables in empty drums and shifting to store.
83) Interpanel wiring Termination/Connection of the control cable as per new cable schedule of New 132 KV Bus coupler bay and completing interpanel wiring of 132 KV control panel of all 132 Kv feeder Bays ( 10 Bays) with 132kv TBC panel etc. along with making necessary holes using glands plate or box where ever required. Fixing of cable glands of appropriate size , providing of ferrules and as per standard practice and all other associated works as per technical specification .
84) Erection of main and auxiliary structure consisting of columns, beams, peaks, masts etc. and auxiliary structures required for installation of Bays ALP/ABL/BBL/BCT’s etc. including shifting of all material i.e. structure parts nuts, bolts washer etc. from store to site of erection, erection of structure as per drawings and practices using flat and spring washer with each bolt. Matching of holes, cutting, matching of member if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by the UPPTCL free of cost but all men, material and T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost.
85) Erection of Equipments :- Erection of following equipments as per instruction manual of various equipment and technical specification including shifting of material/equipment from store to erection site including all other associated work to complete the job satisfactorily :-
i) 132 KV PI
ii) 132 KV Bus coupler Panel
iii) 132 KV C.B.
iv) 132 KV BI
86) Stringing of 132KV Jack Bus Passing overhead 132KV main/Transfer buses for existing Bus Coupler bay of ACSR Moose conductor including fitting of tension clamp, hoisting of Disc Insulator, cutting of conductor and also shifting of all materials from store site.(1 Section includes 1 phase= 44 Mtr.)
87) Jumpering interconnection of equipments through various ACSR conductor of various 132kv equipments(CB/BI) with Main/Transfer/jack bus of ACSR Twin Moose conductor.The work includes cutting of conductor ,bending in proper shape ,clamping with help of clamps and other associated work to complete job satisfactorily.(1 job includes 3 phases jumper)
i) 132kv Bus coupler Bay New
88) Laying of following sizes of unarmoured copper control cables in the cable trenches of the control cable as per new cable schedule of New 132 KV Bus coupler bay and completing interpanel wiring of 132 KV control panel of all 132 Kv feeder Bays ( 10 Bays) with 132kv TBC panel etc as per requirement & cable schedule, it's saddling with 25x3 mm Al saddle at every 750mm distance including carriage of cable drum from store to site and shifting back to store and all other associated works to complete the job satisfactory as per technical specification.
i) 10 x 2.5sqmm unarmoured copper control cable
ii) 6 x 2.5sqmm unarmoured copper control cable
iii) 4 x 2.5sqmm unarmoured copper control cable
iv) 2 x 2.5sqmm unarmoured copper control cable
89) Laying MS flat for Earthing of Structures/equipments by cutting,. bending , laying 700mm below ground level as per Corporation norms in the following way: Double earthing of all structure and equipments. One earthing will be from top and another from bottom by 50x6mm/75x10mm MS Flat to be provided by dept. free of cost.Work includes excavation and backfilling of soil
i) 25x6mm. MS Flat
ii) 50x6mm. MS Flat
iii) 75x10mm. MS Flat
Installation,Testing&Commissioning of 33 KV Side New 63 MVA T/F Bay with Twin 36KV,1Cx630sqmm Copper Power Cable
90) Route survey and preparation of route map including digging of trial pits
91) Excavation of trenches for 1C x 630sqmm Copper Cable (6+1)
92) Sand bedding & laying of all (6+1) cables in excavated trenches along with aproach Cable in excavated trench (including jointing & installation of Approach cable) and earthing as per drawing.
93) Back filling of trench with sand,excavated earth and providing RCC cover, warning tape and route marker.
94) Installation of Outdoor End Terminations kit including jointing, heating, crimping with all required accessories.( 1set includes both ends) and checking healthiness IR/ hgh Pressure.
95) Formation of Trenchless road crossing with HDPE pipe (6+1) xlpe cable
96) Laying of 1C x 630sqmm Copper Cable(6+1) in HDPE pipe in road crossing
97) Excavation of trenches for 1C x 630sqmm Copper Cable (6+1)
98)Safe Carriage of following items from various s/s to 220kv s/s Hardoi road ,distance- 40km (Approx) using private truck including loading at 400kv jehta s/s and unloading at 220kv Hardoi road s/s using Hydra with required Manpower ,T&p in scope of contractor .b) Aluminium single clamps. Item list from 400kv jehta as folows-. c) 630 sq. mm.,Copper CABLE ,PVC Insulated Cable-269mtr.
Hi-tech power transmission
r s enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .