Loading…
Loading…
Tender Value
₹22.7 L
EMD Value
₹68,040
Closing Date
27 Aug 2026, 5:00 pmClosed
Executive Ofiicer
Nagar Palika Parishad Karanprayag
Construction of shops in New bus adda Karanprayag
2026_NPKP_98684_5
583/etendering/nirmankarya/ (2026-27) dated06.08.2026
Open Tender
Civil Works
Item Rate
180 days
ward no 06
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
EO Nagar Palika Parishad
₹68,040
2 Sept 2026
11 Aug 2026
31 Aug 2026
11 Aug 2026
27 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Shop's in new bus adda Karanprayag. | |||||
| 1.01 | Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as-10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 106.93 | /Cum | - | - |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 2.59 | /Cum | - | - |
| 1.03 | R.R. stone masonary laid 1:6 cement & sand mortar. | 27.01 | /Cum | - | - |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.99 | /Cum | - | - |
| 1.05 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7.45 | /Cum | - | - |
| 1.06 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | 36.98 | Cum | - | - |
| 1.07 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Cold twisted bars | 4,368.21 | /Kg | - | - |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 49.68 | /Sqm | - | - |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 190.24 | /Sqm | - | - |
stage.html
html • 0.01 MB
finance_116528.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_116528.xls
BOQ • 0.35 MB
tenderdocument.pdf
Tender Documents • 1.64 MB
tendernotice.pdf
Additional Documents • 1.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .