Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | ₹5.5 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | K S Bigili L1 |
|---|---|---|---|---|
| 1.00Annual maintenance | ||||
| 1.00 | 13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. | 111.08 | sqm | 67.27 ₹7,472.55 |
| 1.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 296.15 | kg | 172.35 ₹51,041.45 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 42 | cum | 248.87 ₹10,452.54 |
| 1.00 | OD12764/2025-2026:Removing earthen bund using suitable mechanical means including depositing the soil including cost and conveyance, labour charges etc complete as per the instructions of departmental officers at site | 7.42 | cum | 368.66 ₹2,735.46 |
| 1.00 | OD33091/2025-2026:Fixing in position Anjily wood shutter planks including conveyance using boat or floating mechanism or an other suitable means and all labour charges including cleaning of shutter groove, removal of attached marine animals such as clamshells etc complete. | 742 | cud m | 43.73 ₹32,447.66 |
| 1.01 | OD12766/2025-2026:Filling with hard stiff clay cut and conveying from suitable place including all leads and lifts, consoldating each layer of 20cm by ramming and watering and incliding all labour charges etc. compleate as per the direction of departmental officers at site | 109.67 | cum | 270.07 ₹29,617.23 |
| 1.01 | OD12767/2025-2026:Removing wooden posts from sluice and conveying the same to convenient place etc. Complete. | 8 | each | 3,430.35 ₹27,442.8 |
| 1.01 | OD12768/2025-2026:Removing the automatic shutters from sluice and conveying the same to convenient place etc. complete as per direction of the departmental officers at site | 8 | each | 6,590.86 ₹52,726.88 |
| 1.01 | OD12769/2025-2026:Conveying and fixing the wooden posts for the sluice in correct position including all charges etc complete as per the direction of departmental officers at site. | 8 | each | 3,430.35 ₹27,442.8 |
Tender Value
₹5.7 L
EMD Value
₹14,168
Closing Date
7 May 2026, 11:00 amClosed
Assistant Executive Engineer,
O/o the Assistant Executive Engineer, MI Sub division, 2nd floor, Civil station, Kakkanad
Annual Maintenance of Puthenpadam sluices for the year 2025-26
2025_Irrig_816822_4
10/AEE/MISDN/EKM/2025-26
Open Tender
Civil Works - Others
300 days
Kuzhippilly GP
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,250
Yes
₹14,168
Yes
23 Jun 2026
30 Apr 2026
8 May 2026
30 Apr 2026
7 May 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Annual maintenance | |||||
| 1.001 | 13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. | 0.2 | sqm | - | - |
| 1.002 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1 | kg | - | - |
| 1.003 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.004 | OD12764/2025-2026:Removing earthen bund using suitable mechanical means including depositing the soil including cost and conveyance, labour charges etc complete as per the instructions of departmental officers at site | 1 | cum | - | - |
| 1.005 | OD33091/2025-2026:Fixing in position Anjily wood shutter planks including conveyance using boat or floating mechanism or an other suitable means and all labour charges including cleaning of shutter groove, removal of attached marine animals such as clamshells etc complete. | - | cud m | - | - |
| 1.006 | OD12766/2025-2026:Filling with hard stiff clay cut and conveying from suitable place including all leads and lifts, consoldating each layer of 20cm by ramming and watering and incliding all labour charges etc. compleate as per the direction of departmental officers at site | - | cum | - | - |
| 1.007 | OD12767/2025-2026:Removing wooden posts from sluice and conveying the same to convenient place etc. Complete. | - | each | - | - |
| 1.008 | OD12768/2025-2026:Removing the automatic shutters from sluice and conveying the same to convenient place etc. complete as per direction of the departmental officers at site | - | each | - | - |
| 1.009 | OD12769/2025-2026:Conveying and fixing the wooden posts for the sluice in correct position including all charges etc complete as per the direction of departmental officers at site. | - | each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1434865.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewnit.pdf
Tender Documents • 0.03 MB
BOQ_1434865.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 3.25 MB
epayment.rar
Other Document • 0.04 MB
Download all tender documents and submit your bid