| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st lowest₹7,844Accepted-AOC MANUBAZAR SABROOM | 1st lowest | Accepted-AOC The bidder final quoted rate is 7844 per unit for some items. | |
| 2 | 1st lowest₹7,978Accepted-AOC HALL CHOWMUHANI BELONIA SOUTH TRIPURA | SOUTH TRIPURA | TRIPURA | 799125 | 1st lowest | Accepted-AOC The bidder final quoted rate is 7978 per unit for some items. |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
29 Jan 2024, 2:00 pmClosed
Executive Engineer,RD Santirbazar Division
O/o the Executive Engineer RD Santirbazar Division, Santirbazar, South Tripura
Empanelment of vendors for supply of Interlocking C.C. Paver Block of M-35 grade (60 mm and 80 mm thick) for different construction works against various schemes under all 05 (Five) RD Blocks under the jurisdiction of RD Santirbazar Division
2024_CERDD_45962_1
eDT-94/PAVER BLOCK/EE/RD/STB/23-24 Dt-11/1/24
Open Tender
Supply of Materials
Item Wise
30 days
As per DNIT
Please refer tender documents
8 documents required · 8 mandatory
₹1,000
₹1 L
O/o the Executive Engineer RD Santirbazar Division
24 Sept 2024
12 Jan 2024
29 Jan 2024
12 Jan 2024
29 Jan 2024
12 Jan 2024
12 Jan 2024 - 25 Jan 2024
24 Jan 2024
Supplying of Interlocking paver Block (60 mm thickness ) of different shade (ISI) for Bokafa RD Block
Supplying of Interlocking paver Block (80 mm thickness ) of different shade (ISI) for Bokafa RD Block
Supplying of Interlocking paver Block (60 mm thickness ) of different shade (ISI) for Jolaibari RD Block
Supplying of Interlocking paver Block (80 mm thickness ) of different shade (ISI) for Jolaibari RD Block
Supplying of Interlocking paver Block (60 mm thickness ) of different shade (ISI) for Rajnagar RD Block
Supplying of Interlocking paver Block (80 mm thickness ) of different shade (ISI) for Rajnagar RD Block
Supplying of Interlocking paver Block (60 mm thickness ) of different shade (ISI) for Hrishyamukh RD Block
Supplying of Interlocking paver Block (80 mm thickness ) of different shade (ISI) for Hrishyamukh RD Block
Supplying of Interlocking paver Block (60 mm thickness ) of different shade (ISI) for B C Nagar RD Block
Supplying of Interlocking paver Block (80 mm thickness ) of different shade (ISI) for B C Nagar RD Block
Fabrication charge including fitting & fixing of the finished product in the worksite charge of any structure. Rates should be incl. cost of base plate, cleat. (Pipe/Angle/ holding down bolt will be issued from department).
Manufacturing & supplying including fitting & fixing of the finished product in the worksite of fabricated steel tubular truss of spacing 3.09m c/c with all accessories such as required purlin, bottom runner, bracing, trusses, cleat, base plate & other fittings of trusses & projection of rafter & purlin to gravel wall etc complete (only cost of Holding down bolt / Nut bolt will be borne by the Department) Span-(up to 9 m)
Manufacturing & supplying including fitting & fixing of the finished product in the worksite of fabricated steel tubular truss of spacing 3.09m c/c with all accessories such as required purlin, bottom runner, bracing, trusses, cleat, base plate & other fittings of trusses & projection of rafter & purlin to gravel wall etc complete (only cost of Holding down bolt / Nut bolt will be borne by the Department) Span-(above 9m)
Manufacturing, supplying including fitting & fixing of the finished product in the worksite of complete M.S. rolling shutter made of 80 x 1.35 mm MS laths interlocked together through their entire length & joined together at the end by end locks mounted on specially designed pipe shaft with brackets side guides & arrangement for inside & outside locking push & pull operation complete but incl. fixing of the top cover, ball bearing & spring etc.
100 x 100x 8 mm - MS angle
65 x 65 x 8 mm - MS angle
50 x 50x 5 mm- MS angle
Manufacturing & supplying of complete Steel door as per jail specification (specification is enclosed).
Manufacturing & supplying of complete Steel window as per jail specification (specification is enclosed)
Fabrication / repairing charge of old grill & other steel item.
Fabrication/repairing charge of old rolling shutter, collapsible gate etc.
Manufacturing & supplying of MS grill incl. arrow for boundary wall as per reqd. design & specification
Manufacturing, supplying incl. fabrication of minor shed for any output unit, stand (base) for water tank, sign board and other minor structure (No materials will be issued from department)
MS hard drawn steel wire fabric (75x25mm mesh weight not less than 7.75 Kg/ sqm).
Manufacturing & supplying of complete M.S. ornamental grill with square bar of size 20mm / 25 mm.
Manufacturing & supplying of complete Steel window made with M.S. ornamental grill with square bar of size 20 / 25 mm including shutter frame but excluding shutter.
Manufacturing and supplying of MS chain link (made of GI wire, 100 mm x 100 mm , 8 G)
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
RINKU NATH
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .