Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
18 Feb 2025, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening to the road Usilampatty to Sampatty road via Anamapatty 0/0 - 6/8 (Proposed length 0/0 - 3/300) Manapparai Block of Tiruchirappalli District.pkg12
2025_RDTN_522563_12
E1/0009/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2.0 L
DRDA Tiruchirappalli
28 May 2025
10 Feb 2025
18 Feb 2025
10 Feb 2025
18 Feb 2025
10 Feb 2025
10 Feb 2025
Amount
Strengthening the Usilampatty to Sampatty road via Anampatty 0/0-6/8 (Proposal Length-0/0 - 3/300) R - 500 Package No 12….Clearing the light jungle including al labour charges for cutting, burring, buried etc. complete.
BT Picking including all labour charges
Earthwork excavation from borrow pits for filling in all classes of soils such as gravelly soil hard stiffcaly, stiff black cotton soil, hard red earth shales, murrams. Gravel stoney earth and earth mixed with 50% fair sized boulders and hard gravelly soil except sand and hard rock requiring blasting as per SS 20 A .
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction KM 0/0 - 1/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 4/0 -6/570.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying 50mm consolidated thick bituminous macadam using 0.20cum fo 26.50-13.20mm,0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRCmetal with 37Kgs of bitumen for pre mixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant20-30 ton capacity , conveying the mix by tipper trucks top a versite, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by8-10tonne Vibratory/ Pneumatic Roller to the required density etc.,including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 to CMP with bitumen boiler, tipper trucks, Paver Finisher/ 9m paver finisher,Vibratory/Pneumatic roller and all other tools and plant required ,including fuel and all other incidental charges etc., complete as per specification
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5.
Construction of 1.50m RCC Span Culvert Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B CH-950MT
Filling in foundation & basement with good river sand including cost and conveyanceof all labour char sand slacking ramming etc., complete.
Cement concretein C M 1:4:8 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied bydept shoringshutteringbalingout water etc., complete For foundation & basement
Cement concretein C M 1:3:6 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied bydept shoringshutteringbalingout water etc., complete For Abutment &wing
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all includingcharges etc., completefor Bed Block
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all includingcharges etc., completefor Bed Block
Supplying & fabrication of steel for RCC works including cost and conveyance of steel to site including labour charges for cutting bending and tying rods and placing the grills in position for premeasurement asper steel schedule.
Centering charges for the deck slab bottom to site including labour charges etc complete
Centering charges for the wall sides and deck slab sides to site including labour charges etc complete
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for arrangement all includingcharges etc., completefor Deck Slab
Providing Bitumenpad arrangements etc Complete
Providing and Fixing Tar Paper for bearing between Bed Block and Deck Slab
Providing weepholes arrangements etc Complete
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for HM Stone
Provision for KM Stone
Provision for Citizen Information Board
Provision for 60 Cm Circle Mandatory Sign
Road Marking with Hot Applied ThermoplasticComponand With Reflectorising Glass Beads On Bituminous Surface
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
PANDIYAN K (BID ID -1253059)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .