Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC HARYANA HR | ₹7.0 L Quoted ₹7.3 L | L1 | Accepted-AOC Rate after Negotiation |
| 2 | L2₹7.4 LRejected-AOC 521 SECTOR 11 134109 | PANCHKULA | HARYANA | 134109 | ₹7.4 L | L2 | Rejected-AOC 2nd Lowest. |
Tender Value
₹7.4 L
EMD Value
₹14,880
Closing Date
16 Jan 2026, 3:00 pmClosed
Nidhi bhardwaj
Horticulture Panchkula
Rough Cost Estimate for Development of roadside plantation and parks at EWS site in Sector 24 U/E(Grassing , digging of pits , supply and planting of trees , shrubs, supply of FYM, Maintenance of grassy ground trees, shrubs etc and all other works co
2026_HBC_496289_1
2025A4F453DC 1321 4853 823A 6590EA078C63263HSV
Open Tender
Civil Works
500 days
Jagadhari
2 documents required · 2 mandatory
₹500
Yes
₹14,880
Yes
17 Mar 2026
10 Jan 2026
24 Jan 2026
10 Jan 2026
16 Jan 2026
10 Jan 2026
[26.1]Supplying and stacking at site of work well-decayed farm-yard manure from any available source, approved by the Engineer-in-charge including screening through sieve of I.S.designation 16 mm with 5 km lead. [Through Rate]
[26.10]Maintenance of fine grass lawn for one year including fertilizer application, DAP @ 20gm/sqm, urea 40gm/sqm, watering, weeding, top dressing with good earth and manure mixture 2:1 @ 0.01cum per sqm, maintaining fine level, regular mowing and removal of rubbish with all lifts and leads. [Labour Rate]
[26.13.3]Digging holes in all kinds of soil, and refilling the same, with the excavated earth, mixed with well decayed farmyard manure (cost of well decayed farm yard manure to be paid separately) 3. Hole 0.75 metre dia and 0.75 metre deep [Through Rate]
[26.13.4]Digging holes in all kinds of soil, and refilling the same, with the excavated earth, mixed with well decayed farmyard manure (cost of well decayed farm yard manure to be paid separately) 4. Hole 0.60 metre dia and 0.60 metre deep [Through Rate]
[26.14]`Supplying and planting in prepared pits and watering, healthy , vigorous growing , permanent trees including ,application of 10 ml chlorpyriphos 20% EC, planting desired disease free, 200 cm to 220 cm height ,5 cm to 6 cm calliper size stem , full of foliage ornamental tree sapling each to be supplied in 30cm x 30cm poly bags, ` [Through Rate]
[26.15.1]Maintenance of tree including fertilization, application of insecticide, watering, weeding, training, pruning, 1. Maintenance of tree for one year for the 1st three years of age including weeding, hoeing , plant protection , watering from Deptt. source , application of 10 ml chlorpyriphos four times, 0.0289 cum FYM each,50 gm urea and 50 g DAP twice ,replacement of casualty ,disposal of debris and other activities.etc. [Through Rate]
[26.18]Supply and planting of disease free healthy , vigorous growing more than 75 cm height permanent shrubs in already prepared pits, supplied in 25 cm x 20 cm poly bags , application of 10 ml chlorpyriphos 20% E.C. termiticide each and watering supplied through the tractor tanker. [Through Rate]
[26.19.1]Maintenance of shrub for one year including weeding, hoeing, plant protection, watering from Deptt. source, application of 10 ml chlorpyriphos four times in a year , 0.0289cum FYM each, 20 gm urea and 20 gm DAP twice, replacement of casualty etc. with same species and same age of plant 1. Individual shrubs [Through Rate]
[26.4.2]SITE CLEARANCE 2. Surface dressing of ground including removing rank vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m in all kind of soils . [Through Rate]
[26.62]PCC tree-guard with appropriate reinforcement with MS bars of 8mm, 6mm and 4mm, having four panels of equal size and specification, consisting of overall height of 1800 mm and overall width of 620 mm including all carriage. All materials required to be as per BIS specifications. [Through Rate]
supplying and filling of good earth including excavation in all kind of soil including of compensation of eath including loading unloading breaking of clods complete in all respect and includng all lead and left and to entire satisfaction of Engineer in Charge source of earth shall be got approved from the Engineer in Charge before the start of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_574800.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid