Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹6,000
Closing Date
12 Oct 2026, 10:30 am5d left
Executive Engineer
Division No.1, HPPWD Bilaspur
P/L CC Pavement
2026_PWD_145064_1
PW-BLP1-E-proc/26-9991-10040 dt 29.9.26
Open Tender
Civil Works - Roads
Percentage
30 days
Bilaspur
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
₹6,000
6 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m (One point five metre) in width or 10 sqm (TenPer Square Metre) on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m,(One point five metre) including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (Fifty metre) including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 30.36 | Per Cubic metre | 194.92 | ₹5,917.77 |
| 2 | Stone soling under floor tightly hand packed as per HP.PWD Specification clause 11.1.4.1.8. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 34.5 | Per Cubic metre | 1,322.05 | ₹45,610.73 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (One cement : One point five coarse sand): Three graded stone aggregate 20 mm (Twenty milimetre) nominal size). including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 41.4 | Per Cubic Metre | 5,767.15 | ₹2,38,760.01 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.58 MB
BOQ_215947.xls
BOQ • 0.29 MB
1SBDBhatoli290289.pdf
Tender Documents • 3.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .