Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC | |
| 3 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | Dharam pal L1 |
|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in earth work lift up to 1.5 mtrs. Stacking the excavated soil not more than 3 metres away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick jumper work. complete in all respects within all leads and lifts as per direction of the Engineer-in-charge. | 16.36 | Cum | 550 ₹8,998 Lowest |
| 2.00 | Providing and laying cement concrete 1:6:12( 1cement:6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth.complete in all respects within all leads and lifts as per direction of the Engineer-in-charge. | 5.46 | Cum | 8,500 ₹46,410 Lowest |
| 3.00 | Random rubble masonry / Polygonal rubble masonry (coursed or brought to courses with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 in cement mortar 1:6 (1 cement : 6 sand) in all leads and lifts in foundation and plinth complete in all respects with in all leads and lifts as per direction of Engineer in charge. | 14.87 | Cum | 7,500 ₹1,11,525 Lowest |
| 4.00 | Boulder filling behind retaining wall under floor with in complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts. | 4.36 | Cum | 2,500 ₹10,900 Lowest |
| 5.00 | Dry rubble masonry in breast wall and retaining wall and parapets with in complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts. | 13.78 | Cum | 2,500 ₹34,450 Lowest |
| 6.00Providing and laying cement concrete lining 15 cm or less for irrigation channel using mixture of cement concrete 1:3:6 ( 1 cement 3 sand : 6 hard stone agg. in concrete lining with in complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts. | ||||
| 6.01 | i) Hand Mixed concrete in bed | 8.17 | Cum | 8,500 ₹69,445 Lowest |
| 6.02 | ii) Hand Mixed concrete in bed | 11.52 | Cum | 9,000 ₹1,03,680 Lowest |
| 7.00Extra allowance for form work in C.C lining complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts. | ||||
| 7.01 | i) Hand Mixed concrete in bed | 8.17 | Cum | 350 ₹2,859.5 Lowest |
Tender Value
₹3.3 L
EMD Value
₹6,547
Closing Date
29 Sept 2025, 5:00 pmClosed
Executive Engineer Jal Shakti Division Larji
Executive Engineer Jal Shakti Division Larji
(SH- Repair of C.C Linning with 1 3 6 in Bed Retaining wall and Edge wall at various RDs)
2025_HPIPH_115260_1
NIT No. 7444-7543 dt. 19.09.2025
Open Tender
Civil Works
Item Rate
60 days
Bajaura
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer Jal Shakti Division Larji
₹6,547
15 Oct 2025
19 Sept 2025
30 Sept 2025
19 Sept 2025
29 Sept 2025
19 Sept 2025
Amount
Excavation in foundation trenches etc. in earth work lift up to 1.5 mtrs. Stacking the excavated soil not more than 3 metres away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick jumper work. complete in all respects within all leads and lifts as per direction of the Engineer-in-charge.
Providing and laying cement concrete 1:6:12( 1cement:6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth.complete in all respects within all leads and lifts as per direction of the Engineer-in-charge.
Random rubble masonry / Polygonal rubble masonry (coursed or brought to courses with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 in cement mortar 1:6 (1 cement : 6 sand) in all leads and lifts in foundation and plinth complete in all respects with in all leads and lifts as per direction of Engineer in charge.
Boulder filling behind retaining wall under floor with in complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts.
Dry rubble masonry in breast wall and retaining wall and parapets with in complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts.
Providing and laying cement concrete lining 15 cm or less for irrigation channel using mixture of cement concrete 1:3:6 ( 1 cement 3 sand : 6 hard stone agg. in concrete lining with in complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts.
i) Hand Mixed concrete in bed
ii) Hand Mixed concrete in bed
Extra allowance for form work in C.C lining complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts.
i) Hand Mixed concrete in bed
ii) Hand Mixed concrete in bed
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .