Loading…
Loading…
Tender Value
₹98,196.18
EMD Value
₹1,000
Closing Date
5 Jun 2026, 12:00 pmDue today
Deputy Executive Engineer R & B Sub Division Visnagar
M & R to Various Building of Kheralu and Satlasana Section Under R & B Sub Div. Visnagar (Pro. Machinery and Man Power Supply for Pre-Monsoon Work-2026)
309263
01/2026-27
Open
Civil Works - Buildings
Mehsana
₹300
Deputy Executive Engineer R and B Sub Division Visnagar
₹1,000
29 May 2026
29 May 2026
29 May 2026
5 Jun 2026
29 May 2026
It. No. Description of item Quantity Unit Rate Total Amount
It. No. Description of item Quantity Unit Rate Total Amount
In Figures In words
1 Labour charges - Mate 136.00 Nos 514.09 Rupees Five Hundred
Fourteen And Paise Nine
2 Providing & engaging Hydraulic Excavator machine (J.C.B.) for 37.00 Hour 718.98 Rupees Seven Hundred
Excavation work, jungle cutting, dismantling road crust, clening water Eighteen And Paise Ninety
way & removing debries and leveling the ground etc. Under R & B Sub Eight Only
Division, Visnagar ((Rate shall be Inclusive of all machinery, Driver, Fuel,
oi;, labour and operation cost)
3 Hire charges of tractor with trolly for works as directed by engineer in 8.00 Hour 209.71 Rupees Two Hundred Nine
charge (Rate shall be Inclusive of all machinery, Driver, Fuel, oil, labour And Paise Seventy One
and operation cost) Under R & B Sub Division Visnagar Only
Total Bid Price (in Figure)
(in words) Rupees Ninety Eight Thousand One Hundred Ninety Six And Paise Eighteen
I/We am/are willing to carry out the work at ___________% above/below the (percentage should bewritten in figure and words only) Estimated
rates as mentioned above,amount of my/our tender works out as under.
Estimated Amount Estimated Amount
Put to Tender: RS. Put to Tender: RS.
Net : RS. Total : RS.
In Words RS. In Words RS.
(Please Strike out whichever is not applicable)
1 All work shall be carried out as per public works Department Handbook and other specification of Division or as directed.
2 All the column is schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor under
3 Rates quoted include clearance od site (Prior Commencement of work and as its close) in all respects and hold good for work under all
conditions,site,Moisture,weather etc.
4 To be continued on additional sheets,if found necessary.
Dy. Executive Engineer Executive Engineer
R&B Sub Division R&B Division
Signature of contractor Visnagar Mehsana
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.SBD Booklet.pdf
2.Schedule B.pdf
3.Index Spe.pdf
4.Detail Spe.pdf
5.GR to be attached with DTP SBD.pdf
6.General Notes for Tender.pdf
7.BUILDING SPECIFICATIONS BOOK.pdf
1.SBD Booklet.pdf
2.Schedule B.pdf
3.Index Spe.pdf
4.Detail Spe.pdf
5.GR to be attached with DTP SBD.pdf
6.General Notes for Tender.pdf
7.BUILDING SPECIFICATIONS BOOK.pdf
Download all tender documents and submit your bid