| 3 | L3₹1.0 Cr+₹14.3 L (15.9%)Rejected-AOC 19 195 A 1 ATC BUILDING MOOLEPADAM NAGAR ROAD HMT JN KALAMASSERY P O KOCHI 683104 | KOCHI | ERNAKULAM | KERALA | 683104 | L3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical 7 608 AQUATECH HOUSE UDAYAMPEROOR SOUTH PARAVOOR KERALA 682307 | UDAYAMPEROOR | SOUTH PARAVOOR | KERALA | 682307 | - | Rejected-Technical Disqualified |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
1 Dec 2020, 5:00 pmClosed
Managing Director, KINFRA
KINFRA House, TC 31/2312, Sasthamangalam, Trivandrum
Balance work of Design, supply, Construction, Erection and Commissioning of Effluent Treatment Plant (Phase I) of 225m3 per day capacity, including Operation and maintenance for 3 years at KINFRA Food Processing Industrial Park, Adoor
2020_KINFR_399602_1
KINFRA/ETP/ADR/17/2020-21
Open Tender
Civil Works - Others
Item Rate
120 days
Adoor
As per NIT
2 documents required · 2 mandatory
₹2,975
₹50,000
KINFRA Park, Adoor
25 Jan 2021
17 Nov 2020
4 Dec 2020
17 Nov 2020
1 Dec 2020
24 Nov 2020
23 Nov 2020
Amount
Balance Civil Works
Equalization tank with platform, RCC staircase with handrails, C.I rungs, CI pipe inserts, Plinth protection etc complete.-Balance work such as providing and fixing handrail of approved size by using M.S. tube 40 mm nominal bore,approximate length of 75 m by welding including necessary fittings for fixing rail, applying priming coat of approved steel primer etc complete.
Aeration tank with platforms for aerators, walkways with handrails, RCC straicase with handrails, CI rungs, CI pipe inserts, Plinth protection etc complete. - Balance work such as providing and fixing handrail of approved size by using M.S. tube 40 mm nominal bore ,approximate length of 45 m by welding including necessary fittings for fixing rail, applying priming coat of approved steel primer etc complete.
Secondary Clarifier with fixing structure for mechanism, access ladder and handrail, CI pipe inserts, M.S plate inserts, plinth protection etc complete- All other balance works complete.
Clarified water sump with access ladder and handrail, CI pipes inserts, M.S plate inserts, plinth protection etc complete. - Balance works such as providing and fixing hand rail of approved size by using M.S. tube 40 mm nominal bore, approximate length of 15 m by welding including necessary fittings for fixing rail,applying priming coat of approved steel primer etc complete.
Sludge sump with access ladder and handrail, CI pipe inserts,M.S plate inserts, plinth protection etc complete. - All other balance works complete.
Sludge drying beds with filter media, feed channel, drain, high and low level chambers etc complete. -All other balance works complete.
Dewatered sludge sump with access ladder and handrail, CI pipe Inserts, MS plate inserts, plinth protection etc complete. All other balance works complete.
MCC Room including trenches for cable, GI pipe sleeves, plinth protection etc complete- Balance works such as 100 mm thick aerated cement block masonry work, 15mm Cement Plastering (1:4), flooring with vitrified floor tiles of size 500 x 500mm conforming to IS:15622 of approved make , distempering with oil bound washable distemper, providing and fixing rolling shutter made of MS lathe adequate strength conforming to IS: 4454 ,providing and fixing windows made by second class Teak Wood ,providing and fixing two track aluminium glazed sliding windows (frame bottom track 61.85mm x 31.75 mm x 1.5 [email protected] kg/m top track @0.784kg/m shutter section top and bottom 40 x 27 x 18 mm @0.417kg/m with necessary accessories), painting etc complete.
Security Room with all necessary structures - Balance works such as, Utility Room, Office Room and Laboratory Room, including Brick work by using Modular brick, 18 mm Cement Plastering (1:6),Reinforced concrete work including centering & shuttering, Steel work for Hand rails & ladder, PVC pipe(110mm dia) work for rainwater, Weathering course for roof slab , flooring with vitrified floor tiles of size 500 x 500mm conforming to IS:15622 of approved make, Distempering with oil bound washable distemper, Providing and fixing windows made with second class Teak Wood,Providing and fixing two track aluminium glazed sliding windows, painting etc complete.
Toilet Room with Water Closet, Urinals, overhead storage tank, plinth protection, etc complete - Balance works such as flooring with Ceramic glazed floor tiles of size 300 x 300mm conforming to IS:15622 of approved make and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer) of approved make upto full height of wall, painting etc complete.
Terminal pumping station with all supporting structure and provisions complete - all other balance work complete.
Foundation pads for pumps, Blowers MCC,etc complete - all other balance work complete.
Internal roads, pathway and landscaping as per the layout
Any other additional items required for satisfactory completion of work.
Balance Mechanical works
Bar Screen arrangement- all other balance works complete
Fixed surface Aerators with all support structures-Balance work such as Overhauling, installing, testing and commissioning of Fixed surface Aerators and Raw effluent transfer pump with all support structures etc complete.
Clarifier mechanism with all necessary support structures- Balance work such as Overhauling, installing, testing and commissioning of Clarifier mechanism with all necessary support structures etc complete.
Sludge pumps-Balance work such as Overhauling , installing, testing and commissioning of Sludge pumps.
Filter feed pumps-Balance work such as Overhauling , installing, testing and commissioning of Filter feed pumps and Filter transfer pumps.
Pressure sand filter with media , frontal piping & backwash lines etc complete.-All other balance work complete.
Activated carbon filter with media, frontal piping & backwash lines etc complete.-All other balance work complete.
Disinfection system including dosing tank, pump, agitator etc complete-All other balance work complete.
Additional instrumentation including Pressure gauges, flow meter etc as required-All other balance work complete
Specified Tools
Any other additional items required for satisfactory completion of work.
Balance Piping works
All interconnecting piping between various process units including valves, fittings, NRVs, pressure gauge, etc complete. - All balance work complete
All plumbing work within battery limits, including water meter, valves, fittings etc complete.- All balance work complete
Any other additional items required for satisfactory completion of work
Balance Electrical works
Design , Supply , Erection , Testing and Commissioning of LT power panel (MCC panel) including DOL starters , metering , indication lamps etc complete. All balance work complete
Supply, erection. Testing & commissioning of copper/ Al Cable for control and power cable the size higher than actual required capacity and rating inclusive of termination of cables laid underground/ wall/ cable trays as required, from Electric Motors to MCC panel. All balance work complete
Design , Supply , Erection , Testing and Commissioning of Capacitor of required KVAR. All balance work complete.
Design , Supply ,Testing, Erection and Commissioning of earthing system with G.I wires, GI strips for LT panels and motors, as required as per specification, including 2 nos earth pits ( G.I plate) for MCC panel, and one earth station will be provided near every pumping station. All balance work complete
Design , Supply ,Testing, Erection and Commissioning of light fixtures, Exhaust fans, ceiling fans and 5A, 15A power points wherever required including wiring with copper wires/ cables and structural steel for supports with MCB's and MCB distribution board. All balance work complete
Design, supply, erection and commissioning of outdoor light wall mounted fixtures around ETP area including wall brackets and necessary hardwires and cabling. All balance work complete
Any other additional items required for satisfactory completion of work
Laboratory Items
Supply, erection, testing & commissioning of laboratory equipment such as pH meter, Turbidity meter, BOD analyzer, COD analyzer, Vacuum pump, Glass ware, Hot air oven, Electric balance(Digital) & Any other item if necessary complete.
Opearation and maintenance Operation and maintenance of the entire treatment plant for a period of three year by deputing required manpower as indicated in the scope of service including flow monitoring, analysis of raw and treated waste water and other operating parameters, maintaining and displaying the records through log books, colour charts including monitoring & laboratory analysis etc complete. Required manpower as Engineers,Operators,Laboratory Analyst and other supporting staff has to be provided by the contractor.Power and water required for the operatyion shall be provided by the client.However contractor has to install necessary meters for recording the consumption.Other Consumable items viz.lubricating oil,Grease,Chemicals, etc has to be procured by the contractor.After completion of O&M period the contractor should handover the ETP as new condition to the owner.
First year after taking over the system by KINFRA
Second year
Third year
ENVIROCHEM LABORATORIES PVT LTD
GREEN METHOD ENGINEERING PVT. LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .