| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.8 LAccepted-AOC | L1 | Accepted-AOC Being L1 |
| Sl No | Description | Qty | Unit | Divakaran L1 |
|---|---|---|---|---|
| 1.00Maintenance | ||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 660 | sqm | 13.48 ₹8,896.8 Lowest |
| 1.00 | OD87186/2023-2024:Cleaning the mots (inside mot portion) and removing the dirty materials to a safe distance place beyond 10km including all labour charges etc complete | 466.5 | cum | 550.98 ₹2,57,032.17 Lowest |
| 1.00 | OD87227/2023-2024:Removing the waste materials and sludge from the drain and depositing the dirty matters to a safe distance place beyond 10 km and cleaning the drain and manholes along with uprooting the vegetation and all labour charges etc complete, as per the direction of departmental officers at site | 934.33 | cum | 751.77 ₹7,02,397.51 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 3.6 | cum | 6,228.8 ₹22,423.68 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 213.17 | cum | 7,303.64 ₹15,56,916.94 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 112.5 | sqm | 306.47 ₹34,477.88 Lowest |
| 1.01 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 3 | cum | 1,869.26 ₹5,607.78 Lowest |
| 1.01 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 12.32 | cum | 1,581.4 ₹19,482.85 Lowest |
| 1.01 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 6 | cum | 1,887.36 ₹11,324.16 Lowest |
Tender Value
₹43.6 L
EMD Value
₹50,000
Closing Date
1 Apr 2025, 5:00 pmClosed
Executive Engineer
PWD Buildings Division Thiruvananthapuram
Deposit-Museum and Zoo-Maintenance of drainage mots in various enclosure in Zoo and new pipe line works for conveying the sewage from the open pond where sloth bear Himalayan bear etc are kept to the drain at the bottom of tiger cage-Civil work
2025_PWD_744307_2
TR/8174/2023_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
300 days
Thiruvananthapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
22 Aug 2025
22 Mar 2025
4 Apr 2025
22 Mar 2025
1 Apr 2025
22 Mar 2025
Amount
Maintenance
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD87186/2023-2024:Cleaning the mots (inside mot portion) and removing the dirty materials to a safe distance place beyond 10km including all labour charges etc complete
OD87227/2023-2024:Removing the waste materials and sludge from the drain and depositing the dirty matters to a safe distance place beyond 10 km and cleaning the drain and manholes along with uprooting the vegetation and all labour charges etc complete, as per the direction of departmental officers at site
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
13.7.2:12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
OD256848/2024-2025:Random rubble masonry with hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
OD87364/2023-2024:Engaging plumber
6.1.1:Brick work with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand)
50.18.9.10.1:Providing and fixing PVC pipes includings jointing of pipes with one step pvc solvent cement, trenching , refilling & testing of joints complete as per direction of Engineer in Charge. 150 mm dia 6 Kgf/cm2
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
OD87964/2023-2024: Providing and fixing PVC moulded fittings/accessories for Rigid PVC pipes including jointing with PVC solvent cement - 150x150x150 mm dia Tee
OD87965/2023-2024:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 150 mm dia bend
OD217155/2024-2025:Constructing Concrete masonry manhole in C.C. 1:2:4 mix (1 cement : 2 coarse sand : 4graded stone aggregate 20 mm nominal size) with foundation concrete 1:4:8 mix ( 1 cement : 4 coarse sand : 8graded stone aggregate 40 mm nominal size,) inside plastering 12 mm thick with cement mortar 1:3 ( 1 cement :3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 ( 1cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size ) finished with a floating coat of neat cement complete as per standard design: Inside size 80x80 cm and 30 cm (average) deep with low duty cast iron covering slab
OD217156/2024-2025:Extra for additional height of manhole with cement concrete 1:2:4 with wall thickness 15 cm for inside size 80x80cm
OD217148/2024-2025:Constructing Concrete masonry manhole in C.C. 1:2:4 mix (1 cement : 2 coarse sand : 4graded stone aggregate 20 mm nominal size) with foundation concrete 1:4:8 mix ( 1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size,) inside plastering 12 mm thick with cement mortar 1:3 ( 1 cement :3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 ( 1cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size ) finished with a floating coat of neat cement complete as per standard design: Inside size 60x60 cm and 30 cm (average) deep with low duty cast iron covering slab
OD217149/2024-2025:Extra for additional height of manhole with cement concrete 1:2:4 with wall thickness 15 cm for inside size 60x60cm
50.6.1.4:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete
50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
19.6.7:Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete:600 mm dia R.C.C. pipe
15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm
11.20.2:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Medium shade pigment using 50% white cement 50 % Grey cement
15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved
Bidder Name
Divakaran
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1224156.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .