| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹45.7 LAccepted-AOC METTEL HOUSE VILANGAD POST | ₹45.7 L | 1 | Accepted-AOC lowest quoted value |
| 2 | 2₹47.4 L+₹1.7 L (3.83%)Rejected-AOC KUNIYIL H PULIYAVU | ₹47.4 L+₹1.7 L (3.83%) | 2 | Rejected-AOC Highest quoted value |
Tender Value
₹49.9 L
EMD Value
₹50,000
Closing Date
10 Jun 2026, 2:00 pmClosed
Office of the AEE ESD Nadapuram
Kallachi PO 673506
Shifting of Electrical utilities regarding KRFB in favour of EXECUTIVE ENGINEER Under ES Parappupara
2026_KSEB_852334_1
Tender No. ESD/NDPM/e-Tender/01/2026-27 Dtd.24.05.2026
Open Tender
Electrical Works
Percentage
90 days
PARAPPUPAARA
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
₹50,000
23 Jun 2026
26 May 2026
12 Jun 2026
27 May 2026
10 Jun 2026
27 May 2026
27 May 2026 - 10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. | 38 | No | 938.82 | ₹35,675.16 |
| 2 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. | 21 | No | 149.5 | ₹3,139.5 |
| 3 | Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole. | 539 | No | 341.86 | ₹1,84,262.54 |
| 4 | Insertion of one LT PSC pole in existing single phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. | 18 | No | 2,204.86 | ₹39,687.48 |
| 5 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. | 56 | No | 492.41 | ₹27,574.96 |
| 6 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 210 | No | 3,129.05 | ₹6,57,100.5 |
| 7 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 195 | No | 3,274.36 | ₹6,38,500.2 |
| 8 | Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 21 | No | 3,130.09 | ₹65,731.89 |
| 9 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 36 | No | 1,923.64 | ₹69,251.04 |
| 10 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 21 | No | 1,008.86 | ₹21,186.06 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1440184.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_1440184.xls
BOQ • 0.31 MB
tenderdocuments.pdf
Tender Documents • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .