Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.8 CrAccepted-AOC | ₹6.8 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹8.3 CrRejected-AOC KOTTAYIL ARCADE NEAR KSHB COLONY BUS STOP MALAPARAMBA KOZHIKKODE 673009 | KOZHIKODE | KOZHIKODE | KERALA | 673009 | ₹8.3 Cr | 2 | Rejected-AOC L2 |
| 3 | 3₹8.5 CrRejected-AOC PO MELMURI MALAPPURAM DT KERALA 676517 | MELMURI | MALAPPURAM | KERALA | 676517 | ₹8.5 Cr | 3 | Rejected-AOC L3 |
| 4 | 4₹8.9 CrRejected-Finance | ₹8.9 Cr | 4 | Rejected-Finance L4 |
| 5 | 5₹9.0 CrRejected-Finance | ₹9.0 Cr | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | T T CONSTRUCTIONS L1 | LUKMAN.T L6 | T ABDUSSAMAD L3 | BG TECH ENGINEERING L7 | SAPIENT INFRA PVT LTD L4 | KOTTAYIL INFRASTRUCTURE ENGINEERING AND CONSTRUCTIONS LLP L2 | P MOHAMMED ALI L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Working charges for Replacing the old AC pipe with DI pipe and PVC | ||||||||||
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 7,196.32 | cum | 400 ₹28.8 L | 500 ₹36.0 L | 575 ₹41.4 L | 566 ₹40.7 L | 580 ₹41.7 L | - | 580 ₹41.7 L |
| 1.00 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | 2,865.57 | cum | 600 ₹17.2 L | 1,100 ₹31.5 L | 840 ₹24.1 L | 835 ₹23.9 L | 830 ₹23.8 L | 651.44 ₹18.7 L | 860 ₹24.6 L |
| 1.00 | 100.2.7:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited. | 2,865.57 | cum | 1,000 ₹28.7 L | 1,500 ₹43.0 L | 1,397 ₹40.0 L | 1,390 ₹39.8 L | 1,380 ₹39.5 L | 1,083.32 ₹31.0 L | 1,377 ₹39.5 L |
| 1.00 | 100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited. | 1,432.79 | cum | 1,100 ₹15.8 L | 1,200 ₹17.2 L | 1,598 ₹22.9 L | 1,611 ₹23.1 L | 1,600 ₹22.9 L | 1,256.72 ₹18.0 L | 1,600 ₹22.9 L |
| 1.00 | 100.99.7:Dismantling 200 mm ACpipe 8 (Rate 50% of 100.23.1.6.- Laying Charge) | 1,000 | metre | 71 ₹71,000 | 100 ₹1 L | 90.2 ₹90,200 | 91 ₹91,000 | 90 ₹90,000 | 90.16 ₹90,160 | 99.97 ₹99,970 |
| 1.01 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 10,000 | metre | 17 ₹1.7 L | 25 ₹2.5 L | 22.8 ₹2.3 L | 24.9 ₹2.5 L | 23 ₹2.3 L | 24.9 ₹2.5 L | 24.9 ₹2.5 L |
| 1.01 | OD14116/2025-2026:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 6,400 | sqm | 71 ₹4.5 L | 100 ₹6.4 L | 90.5 ₹5.8 L | 99.4 ₹6.4 L | 90 ₹5.8 L | 99.4 ₹6.4 L | 99.4 ₹6.4 L |
| 1.01 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 10,000 | metre | 21 ₹2.1 L | 30 ₹3 L | 27.6 ₹2.8 L | 30.38 ₹3.0 L | 28 ₹2.8 L | 31.62 ₹3.2 L | 30.38 ₹3.0 L |
| 1.01 | 100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals. | 200 | metre | 76 ₹15,200 | 100 ₹20,000 | 94.8 ₹18,960 | 105.08 ₹21,016 | 95 ₹19,000 | 106.69 ₹21,338 | 105.08 ₹21,016 |
Tender Value
₹9.3 Cr
EMD Value
₹2 L
Closing Date
15 Sept 2025, 3:00 pmClosed
SE,PH Circle Malappuram
PH Circle Malappuram
AMRUT-2.0-WSS to Kottakkal Municipality - Providing New Distribution Network, Functional Household Tap Connections and Replacing old aged AC pipe with DI Pipe
2025_KWA_789785_1
SE/PHC/MPM/16/2025-26
Open Tender
Civil Works - Water Works
365 days
Kottakkal
Refer Tender Document
8 documents required · 8 mandatory
₹11,025
₹2 L
PH Circle Malappuram
9 Jan 2026
22 Aug 2025
16 Sept 2025
22 Aug 2025
15 Sept 2025
22 Aug 2025
22 Aug 2025 - 12 Sept 2025
2 Sept 2025
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1301236.xls
BOQ • 0.39 MB
NITmerged.pdf
Tender Documents • 4.03 MB
Download all tender documents and submit your bid