Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | ₹9.3 L | L1 | Accepted-AOC Accepted due to lowest bidder |
| 2 | L2₹10.7 L+₹1.5 L (16.0%)Rejected-AOC | ₹10.7 L+₹1.5 L (16.0%) | L2 | Rejected-AOC Rejected as the highest rate quoted. |
| Sl No | Description | Qty | Unit | Thankachan K P L1 | Benny O.M. L2 |
|---|---|---|---|---|---|
| 1.00Aqueduct | |||||
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 20.34 | cum | 1,228 ₹24,972.61 Lowest | 1,400 ₹28,470.4 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 12.97 | cum | 2,900 ₹37,610.1 | 2,500 ₹32,422.5 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 104.46 | sqm | 602 ₹62,884.92 Lowest | 850 ₹88,791 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 38.24 | sqm | 796 ₹30,439.04 Lowest | 890 ₹34,033.6 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,839.79 | kilogram | 88 ₹1,61,901.17 Lowest | 91 ₹1,67,420.53 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 61.45 | cum | 8,286 ₹5,09,158.13 Lowest | 9,500 ₹5,83,756 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.21 | cum | 7,296 ₹37,975.68 Lowest | 9,100 ₹47,365.5 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 142.96 | sqm | 250 ₹35,740 Lowest | 425 ₹60,758 |
| 1.01 | OD30107/2025-2026:Engaging man mazdoor for various works as per the direction of Deptl. officers | 11 | each | 855 ₹9,405 Lowest | 1,000 ₹11,000 |
Tender Value
₹11.7 L
EMD Value
₹29,363
Closing Date
15 Oct 2025, 5:00 pmClosed
Cinimole.P.A (AEE)
MVIP Sub division No. 9, Ramamangalam at Muvattupuzha
GENERAL-Periyambra Aqueduct Rectification-MVIP -LBMC Rectification on top surface of Periyambra Aqueduct-General Civil Work
2025_Irrig_806527_1
02/AEE/MVIP 9/2025-26
Open Tender
Civil Works - Canal
Item Rate
Periyambra
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹29,363
Yes
7 Nov 2025
7 Oct 2025
18 Oct 2025
7 Oct 2025
15 Oct 2025
7 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1343621.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .