Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹75.3 LAdmitted-Finance D NO 44 38 12 23 4 AVS PARADISE SRINIVASA NAGAR AKKAYYAPALEM POST VISAKHAPATNAM 530 016 | VISAKHAPATANAM | ANDHRA PRADESH | 530016 | L1 | Admitted-Finance | ||
| 2 | L2₹88.2 L+₹13.0 L (17.2%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹89.3 L+₹14.1 L (18.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical The firm is not having experience in similar nature of works and also not having required value of Annual turnover as per NIT | ||
| 5 | Rejected-Technical | - | Rejected-Technical The firm is having less value of work experience in similar nature of works as per NIT |
Tender Value
₹96.4 L
EMD Value
₹1.9 L
Closing Date
24 Sept 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, VPA
Chief Engineer office, 3rd floor, AOB, VPA, A.P Pin. 530001 Ph. 0891287 3327, 3333, 3318
Providing shaded accommodation for new RFID gate at B Ramp including providing grill gates for all new RFID gates in Port area
2026_VPT_289026_1
IENG/CP/EE (South)/T/190 Dt. 26.08.2026
Open Tender
Civil Works - Others
Percentage
180 days
VPA
As per NIT
2 documents required · 2 mandatory
₹1,180
Yes
₹1.9 L
Yes
14 Oct 2026
26 Aug 2026
25 Sept 2026
26 Aug 2026
24 Sept 2026
26 Aug 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing CC Blocks in pavements carefully without damaging the blocks and reuse the same wherever necessary including removing the mortar joints around block and stacking them within a lead of 50 m etc., as required and as directed by Engineer-in- Charge complete. | 600.45 | 1m2 | 231.97 | ₹1,39,286.39 |
| 2 | Demolishing cement Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)manually/ by mechanical means including disposal of material within 50 metres lead etc., as required and as directed by the Engineer- in -charge, All labour and equipment , complete. | 29.35 | 1m3 | 1,363.77 | ₹40,026.65 |
| 3 | Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift etc., as required and as per the directions of the Engineer-in-Charge, complete. | 35.32 | 1m3 | 160.99 | ₹5,686.17 |
| 4 | Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m etc., as required and as directed by Engineer-in-charge, complete. | 126.02 | 1m3 | 236.09 | ₹29,752.06 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift etc., as required and as directed by the engineer-in-charge, complete. All labour and materials. | 36.69 | 1m3 | 177.77 | ₹6,522.38 |
| 6 | Supplying and filling in plinth with manufactured sand derived from recycled concrete aggregate (RCA) under floors, including watering, ramming, consolidating and dressing etc., as required and as directed by the Engineer-in-Charge, complete. All labour and materials. | 19.06 | 1m3 | 1,457.84 | ₹27,786.43 |
| 7 | Providing and laying in position cement concrete of 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level etc., as required and as directed by the Engineer-in-Charge, complete. All labour and materials. | 24.11 | 1m3 | 6,178.48 | ₹1,48,963.15 |
| 8 | Providing and laying 1:1½:3 PCC M-20 (1 Cement : 1½ coarse sand derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) etc., as required and as directed by the Engineer in charge, complete. All labour and materials. | 51.58 | 1m3 | 7,565.15 | ₹3,90,210.44 |
| 9 | Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately) Cement concrete prepared with batch mixing machine. All labour and materials. | 57.34 | 1m3 | 9,550.12 | ₹5,47,603.88 |
| 10 | Providing and applying tack coat using bitumen emulsion Rapid Setting bitumen Emulsion on bituminous surface @ 0.4 kg/sqm conforming to IS:8887, using Emulsion pressure distemper Including preparing the surface & cleaning with mechanical broom etc., as required and as directed by the Engineer-in-Charge, complete. All labours and materials. | 140.7 | 1m2 | 12.2 | ₹1,716.54 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.10 MB
BOQ_337141.xls
BOQ • 0.44 MB
CG2.pdf
PDF • 0.25 MB
CG1.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .