Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹53.7 L+₹2.8 L (5.52%)Accepted-AOC | L2 | Accepted-AOC L2 | |
| 3 | L3₹57.8 L+₹7.0 L (13.7%)Rejected-Finance | L3 | Rejected-Finance L3 Rejected | |
| 4 | L4₹58.5 L+₹7.6 L (14.9%)Rejected-Finance | L4 | Rejected-Finance L4 Rejected |
| Sl No | Description | Qty | Unit | A SHIBU L3 | SURESH S A L1 | V P Sanikumar L4 | TRINITY CONSTRUCTION THYCAUD PVT LTD L2 |
|---|---|---|---|---|---|---|---|
| 1.00Rennovation | |||||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 55 | hour | 349.33 ₹19,213.15 | 355 ₹19,525 | 353.22 ₹19,427.1 | 324.26 ₹17,834.3 Lowest |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 200 | sqm | 9.38 ₹1,876 | 8.58 ₹1,716 Lowest | 9.48 ₹1,896 | 8.7 ₹1,740 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 258 | cum | 363.68 ₹93,829.44 | 370 ₹95,460 | 367.72 ₹94,871.76 | 337.57 ₹87,093.06 Lowest |
| 1.00 | OD247415/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site (old item 60.7.1) | 508.3 | cum | 4,037.31 ₹20,52,164.67 | 3,266 ₹16,60,107.8 Lowest | 4,082.21 ₹20,74,987.34 | 3,747.47 ₹19,04,839 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 107.5 | sqm | 390.4 ₹41,968 | 357.24 ₹38,403.3 Lowest | 394.74 ₹42,434.55 | 362.37 ₹38,954.78 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 29.8 | cum | 10,073.31 ₹3,00,184.64 | 9,217.74 ₹2,74,688.65 Lowest | 10,185.35 ₹3,03,523.43 | 9,350.15 ₹2,78,634.47 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 10.5 | cum | 8,019.98 ₹84,209.79 | 7,338.81 ₹77,057.51 Lowest | 8,109.18 ₹85,146.39 | 7,444.23 ₹78,164.42 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 45.15 | cum | 10,603.92 ₹4,78,766.99 | 9,703.28 ₹4,38,103.09 Lowest | 10,721.86 ₹4,84,091.98 | 9,842.67 ₹4,44,396.55 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 63 | cum | 12,912.39 ₹8,13,480.57 | 11,815.69 ₹7,44,388.47 Lowest | 13,056.01 ₹8,22,528.63 | 11,985.42 ₹7,55,081.46 |
Tender Value
₹58.5 L
EMD Value
₹50,000
Closing Date
15 Sept 2025, 6:00 pmClosed
Sajish R
Superintending Engineer, LSGD SE - Thiruvananthapuram Corporation, Pin 695033
TMC-OF- 3999/23 AMRUT-Amrut project-Rennovation of Nambidikonam Pond Kattayikonam ward(AMRUT 2.0)- General Civil Work
2025_LSGD_794565_1
DB/62983/2025-26(66)
Open Tender
Civil Works - Others
Item Rate
180 days
Thiruvananthapuram Corporation
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
11 Nov 2025
5 Sept 2025
17 Sept 2025
8 Sept 2025
15 Sept 2025
8 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1313115.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .