Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | L1 | Accepted-AOC First lowest Bider | |
| 2 | L2₹6.0 L+₹5,790.70 (0.97%)Rejected-AOC | L2 | Rejected-AOC Second Lowest Bider | |
| 3 | L3₹6.2 L+₹21,765.50 (3.64%)Rejected-Finance NEAR GOVT U P SCHOOL PSARA 10 PADAMUGAL KAKKANAD KOCHI PADAMUGAL | KOCHI | ERNAKULAM | KERALA | 682030 | L3 | Rejected-Finance Third lowest Bider | |
| 4 | L4₹6.6 L+₹64,813.70 (10.8%)Rejected-Finance PALERI HOUSE OORAKAM P O YARAMPADI MALAPPURAM 676519 | MALAPPURAM | MALAPPURAM | KERALA | 676519 | L4 | Rejected-Finance Fourth lowest Bider | |
| 5 | L5₹8.0 L+₹2.0 L (33.1%)Rejected-Finance THANIMOLAL HOUSE MEENANGADI WAYANAD DT | MEENANGADI | WAYANAD | KERALA | L5 | Rejected-Finance Fifth Lowest Bider |
| Sl No | Description | Qty | Unit | Babu Mathew T M L2 | Akhil Paul L5 | ABU THAHIR L4 | Suneesh S L1 | AA AND S CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Investigation work | ||||||||
| 1.00 | 56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations). | 0.4 | Hectare | 4,000 ₹1,600 Lowest | 4,000 ₹1,600 Lowest | 4,147 ₹1,658.8 | 4,147 ₹1,658.8 | 6,000 ₹2,400 |
| 1.00 | 56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval. | 0.36 | Hectare | 10,000 ₹3,600 | 9,703 ₹3,493.08 | 11,000 ₹3,960 | 7,500 ₹2,700 Lowest | 14,780 ₹5,320.8 |
| 1.00 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | 1 | set | 62,000 ₹62,000 | 15,798 ₹15,798 Lowest | 2,00,000 ₹2,00,000 | 78,000 ₹78,000 | 86,000 ₹86,000 |
| 1.00 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | 7 | Bore Holes | 5,000 ₹35,000 | 3,000 ₹21,000 Lowest | 3,000 ₹21,000 Lowest | 4,000 ₹28,000 | 7,962 ₹55,734 |
| 1.00 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 40 | metre | 1,500 ₹60,000 | 923 ₹36,920 Lowest | 923 ₹36,920 Lowest | 950 ₹38,000 | 1,000 ₹40,000 |
| 1.01 | 56.3.a.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water. | 30 | metre | 1,500 ₹45,000 | 1,100 ₹33,000 | 1,200 ₹36,000 | 1,100 ₹33,000 | 1,000 ₹30,000 Lowest |
| 1.01 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 40 | metre | 1,000 ₹40,000 | 900 ₹36,000 | 1,100 ₹44,000 | 800 ₹32,000 | 700 ₹28,000 Lowest |
| 1.01 | 56.3.b.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water. | 30 | metre | 1,000 ₹30,000 | 1,200 ₹36,000 | 1,400 ₹42,000 | 700 ₹21,000 Lowest | 830 ₹24,900 |
| 1.01 | 56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 40 | metre | 1,000 ₹40,000 | 900 ₹36,000 | 10 ₹400 Lowest | 400 ₹16,000 | 600 ₹24,000 |
Tender Value
₹8.4 L
EMD Value
₹21,106
Closing Date
3 Jun 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
PWD Bridges Subdivision Kasaragod
GENERAL-Investigation estimate for Bekal Bridge-Investigation estimate for Bekal Bridge-Investigation Work
2026_PWD_853023_1
D1/BR/4/2026-27
Open Tender
Civil Works - Bridges
Item Rate
180 days
Kasaragod
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,865
Yes
₹21,106
Yes
2 Sept 2026
26 May 2026
6 Jun 2026
26 May 2026
3 Jun 2026
26 May 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Investigation work | |||||
| 1.001 | 56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations). | - | Hectare | - | - |
| 1.002 | 56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval. | - | Hectare | - | - |
| 1.003 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | - | set | - | - |
| 1.004 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | - | Bore Holes | - | - |
| 1.005 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | - | metre | - | - |
| 1.006 | 56.3.a.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water. | - | metre | - | - |
| 1.007 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | - | metre | - | - |
| 1.008 | 56.3.b.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water. | - | metre | - | - |
| 1.009 | 56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | - | metre | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1441464.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.63 MB
Preliminary.pdf
Tender Documents • 0.57 MB
affidavit.pdf
Tender Documents • 0.02 MB
BOQ_1441464.xls
BOQ • 0.32 MB
integrity.pdf
Tender Documents • 0.38 MB
Part.pdf
Tender Documents • 0.21 MB
EPAYMENT.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .