Loading…
Loading…
Tender Value
Refer Docs
Closing Date
28 Jul 2022, 3:00 pmClosed
AMAN MANJRE
Nagpur LPG Plant, Bharat Petroleum Corporation Limited
Tender information as per NIT. Tender information As per NIT
4141
1000389573
Limited Tender
Nagpur LPG Plant
1 Aug 2022
13 Jul 2022
28 Jul 2022
13 Jul 2022
28 Jul 2022
13 Jul 2022
21 Jul 2022 - 21 Jul 2022
TECHNICAL QUALIFICATION
PROVIDING SERVICES FOR OPERATION & MAINTENANCE OF ELECTRICAL
AND FIRE FIGHTING SYSTEM AT NAGPUR LPG BOTTLING PLANT.
Details of BQC documents:
1. Technical Criteria –
Central Electricity Authority Eligible Criteria –
In pursuance of regulation-29, of the Central Electricity Authority (Measures relating to
Safety and Electric Supply) Regulations, 2010, the vendor participating in the tender must
have a valid Contractor license in his/her name which is issued by the State Government or
Other competent agency as per CEA.
i. Bidders shall submit proof of an Electrical contractor licensed in his/her name and in this
behalf by the State Government or Other Competent agency as per CEA during bidding.
ii. Bidders shall submit proof of a Wiremen permit for all the electricians in their name and
in this behalf by the State Government or Other Competent agency as per CEA before
start of the contract.
iii. Experience certificate/ Work Order/ Job completion certificate for all the electricians
who has worked on wiring and electrical installation for a total period of one or more
years to be submitted before start of the contract.
BHARAT PETROLEUM CORPORATION LIMITED
(A GOVERNMENT OF INDIA UNDERTAKING)
TENDER NO: LPG.WR.NGP.19. TENDERS.02/2022-23
NOTICE INVITING E-TENDER FOR PROVIDING SERVICES FOR OPERATION & MAINTENANCE OF
FIRE FIGHTING AND ELECTRICAL SYSTEM AT NAGPUR LPG BOTTLING PLANT.
Electronic Bids (E-Tenders) are invited under Two Part Bid System- Technical Bid & Price Bid
NAME OF THE WORK – PROVIDING SERVICES FOR OPERATION & MAINTENANCE
OF FIRE FIGHTING AND ELECTRICAL SYSTEM AT NAGPUR LPG BOTTLING PLANT.
TENDER Number – 1000389573 dated 12.07.2022
TENDERER‟s SIGNATURE WITH RUBBER STAMP
CONTACT PERSON:
Name – Aman Manjre, Asst. Manager (HSSE), Nagpur LPG
Email: [email protected]
Name – Manoj Verma, Plant Manager, Nagpur LPG Plant.
Email: [email protected]
Tender documents (non-transferable) can be downloaded from the following
Websites – https://bpcltenders.eproc.in/Product/publicDash
https://bpcltenders.eproc.in/Product/publicDash
NOTE – All bidders must have Digital Signature Certificate and shall have to
register themselves at https://bpcltenders.eproc.in/Product/publicDash website in
order to submission of the bid online. Online Bids submitted on the
https://bpcltenders.eproc.in/Product/publicDash website shall only be accepted.
Extensions, corrigendum to the tender will be hosted on the above websites only.
Bidders should regularly visit the website
https://bpcltenders.eproc.in/Product/publicDash to keep themselves updated.
Download of Tender Document is from following websites -
https://bpcltenders.eproc.in/Product/publicDash
1. Bids must be submitted online at https://bpcltenders.eproc.in/Product/publicDash
2. All bidders must have Digital Signature Certificate and have to register themselves at
https://bpcltenders.eproc.in/Product/publicDash website in order to submit the bids.
3. Tender documents are available for download free of cost.
4. For further details on this tender, please visit our websites as mentioned above
5. Tender document will not be available for purchase from any of our offices
6. Price Bid is to be submitted online only.
TENDERER‟s SIGNATURE WITH RUBBER STAMP
General Instructions to Bidders for E-Tendering
TENDERER‟s SIGNATURE WITH RUBBER STAMP
• How to submit online Bid / Offers against E-Tendering: Bidders are advised to
download the tender from BPCL website
(https://bpcltenders.eproc.in/Product/publicDash) or the CPP portal
(https://bpcltenders.eproc.in/Product/publicDash) or from the e-tendering website
(https://bpcleproc.in) and participate in the tender as per the instructions given
therein, on or before the due date of the tender. The tender available on the BPCL
website and the CPP portal can be downloaded for reading purpose only. For
participation in the tender, please fill up the tender online on the e-tender system
available on https://bpcltenders.eproc.in/Product/publicDash
1. Registration of Bidders: For registration on the e-tender site
https://bpcltenders.eproc.in/Product/publicDash, you can be guided by the
“Instructions to Vendors” available under the download section of the homepage of
the website. As the first step, bidder shall have to click the “Register” link and fill in
the requisite information in the “Bidder Registration Form”. Kindly remember your
e-mail id (which will also act as the login ID) and the password entered therein. Once
you complete this process correctly, you shall get a system generated mail. Login in
to the portal using your credentials. When you log in for the first time, system will
ask you to add your Digital Signature. Once you have added the Digital Signature,
please inform us by mail to the vendor administrator [email protected]
with a copy [email protected] for approval. Once approved, bidders can login
in to the system as and when required.
2. Digital Signature : As a pre-requisite for participation in the tender, vendors are
required to obtain a valid Digital Certificate of Class IIB and above (having both
signing and encryption certificates) as per Indian IT Act from the licensed Certifying
Authorities operating under the Root Certifying Authority of India (RCIA), Controller
of Certifying Authorities (CCA). The cost of obtaining the digital certificate shall
be borne by the vendor.
4. Corrigendum / Amendment (if any) shall be notified on the site
https://bpcleproc.in. In case any corrigendum/amendment is issued after the
submission of the bid, then such vendors, who have submitted their bids, shall be
intimated about the corrigendum/amendment by a system-generated email. It shall
be assumed that the information contained therein has been taken into account by
the vendor. They have the choice of making changes in their bid before the due date
TENDERER‟s SIGNATURE WITH RUBBER STAMP
5. Price bid of only those vendors shall be opened whose Techno-Commercial bid is found
to be acceptable to us. The schedule for opening the price bid shall be advised
separately. Directions for submitting online offers, electronically, against e-procurement
tenders directly through internet. Vendors are advised to log on to the website
(https://bpcleproc.in) and arrange to register themselves at the earliest, if not done
earlier. The system time (IST) that will be displayed on e-Procurement web page shall be
the time considered for determining the expiry of due date and time of the tender and no
other time shall be taken into cognizance.
6. Submission of Documents: The Unpriced Credential Bid (documents as prescribed in
Annexure – A of general terms and conditions of tender document) and Price Bid have
to be submitted online only. However, documents which necessarily have to be
submitted in like DD/Pay order as EMD in original ,Tender Fee, Self attested photocopies
of documents mentioned in the general terms and conditions of the tender to be
submitted in the tender box . Corporations shall not be responsible in any way for failure
on the part of the bidder to follow the instructions.
7. It is advised that the bidder uploads small sized documents (preferably maximum up to
5 MB) at a time to facilitate in easy uploading into e-tendering site. Corporation does not
take any responsibility in case of failure of the bidder to upload the documents within
specified time of tender submission. Hence it is advisable to upload all the requisite
documents well in advance to avoid the last minute rush.
8. Submission of Bids: Bid along with all the requisite copies of documents as mentioned
in Annexure-A should be uploaded in the e-tendering platform. Balance documents as
mentioned in check list (Proforma II) to be submitted in hard copies along with EMD
(DD / Pay Order) at the office as per the addresses mentioned in Clause No. 9 of
General Terms and Condition of Tender.
9. Vendors are advised in their own interest to ensure that their bids are submitted in e-
Procurement system well before the closing date and time of bid. If the vendor
intends to change/revise the bid already submitted, they shall have to withdraw their
bid already submitted, change / revise the bid and submit once again. In case vendor is
not able to complete the submission of the changed/revised bid within due date &
time, the system would consider it as no bid has been received from the vendor
against the tender and consequently the vendor will be out of contention. The
process of change / revise may do so any number of times till the due date and time of
submission deadline. However, no bid can be modified after the deadline for submission
TENDERER‟s SIGNATURE WITH RUBBER STAMP
TENDERER‟s SIGNATURE WITH RUBBER STAMP
10. Once the entire process of submission of online bid is complete, they will get an auto
mail from the system stating you have successfully submitted your bid in the
following tender with tender details.
11. Bids / Offers shall not be permitted in e-procurement system after the due date /
time of tender. Hence, no bid can be submitted after the due date and time of
submission has elapsed as per our e-procurement system.
12. No manual bids/offers along with electronic bids/offers shall be permitted.
13. No responsibility will be taken by BPCL and/or the e-procurement service provider
for any delay due to connectivity and availability of website. They shall not have any
liability to vendors for any interruption or delay in access to the site irrespective of
the cause. It is advisable that vendors who are not well conversant with e-tendering
procedures, start filling up the tenders much before the due date /time so that there
is sufficient time available with him/her to acquaint with all the steps and seek help
if they so require. Even for those who are conversant with this type of e-tendering, it
is suggested to complete all the activities ahead of time. It should be noted that the
individual bid becomes viewable only after the opening of the bid on/after the due
date and time. Please be reassured that your bid will be viewable only to you and
nobody else till the due date/ time of the tender opening. The non availability of
viewing before due date and time is true for e-tendering service provider as well as
BPCL officials.
14. BPCL and/or the e-procurement service provider shall not be responsible for any
direct or indirect loss or damages and or consequential damages, arising out of the
bidding process including but not limited to systems problems, inability to use the
system, loss of electronic information etc.
15. For any clarification on E-Tendering / training / uploading of document on E-
Procurement Website, please contact our service provider M/s. C1 India Pvt Ltd
on below numbers.
BPCL e-Procurement Helpdesk
M/s. C1 India Pvt Ltd (+91 7020200564, [email protected] )
M/s. E-procurement Technologies Ltd
Mr. Darshan Sapkale (+91 7020200564, [email protected] )
TENDERER's SIGNATURE WITH RUBBER STAMP
TENDERER‟s SIGNATURE WITH RUBBER STAMP
GENERAL CONDITIONS OF TENDER
Tender No.: LPG.WR.NGP.19. TENDERS: 02/2022-23
Time for Completion: One year from the date of LOI /PO.
FILLING AND SUBMITTING TENDERS:
1. Quotations should be submitted only in the prescribed tender schedule forms
supplied by the Company, together with Drawings and General Conditions of
Tender duly signed by the tenderer along with the vendor registration letter on
or before the due date/time of closing of the tender. Quotations received after
the due date/time will not be considered.
2. The tenderer should study all the tender documents carefully and understand the
conditions, drawings, and specifications etc. before quoting. If there are any
doubts, he should obtain clarifications, but this shall not be justification for late
submission or extension of opening date/time of the tenders.
3. The tenderer should visit the site and acquaint himself with site conditions,
availability of water, electricity, approach road, construction materials as per
specifications, shelter for his staff etc. since these are to be provided/arranged by
the tenderer (unless otherwise specified) at his cost.
4. The tenderer should quote for all items in the tender schedule. The rates should
be expressed both in figures and in words: where discrepancy exists between the
two, t h e ra t e s e xp re sse d i n words will prevail. Similarly, if there is any
discrepancy exists between the unit rate and the amount, the unit rate will
5. The rates be quoted in the same units as mentioned in the tender schedule.
6. All entries in the Tender Documents should be in Ink/Typed. Corrections, if any,
should be attested by full signature of the Tenderer.
7. Every page of the tender documents shall be signed by the tenderer his
Authorized representative.
8. The tenderer should indicate the time required to complete the entire work from
the date of receiving the order. The time indicated in tender may have a bearing
on awarding the contract.
TENDERER's SIGNATURE WITH RUBBER STAMP
9. The rate quoted should be inclusive of all material, labour, water, electricity,
power equipment tools/tackles, centering, shoring, lifts, leads, scaffolding,
excise/customs/octroi duties, sales tax, works contact tax etc. Levied by
State/Central authorities. All materials are to be supplied by the tenderer unless
otherwise stated.
a) Its is made clear to the parties that no excise claims on storage tanks/LPG Horton
spheres/ bullets/structural would be entertained by the Corporation.
10. The rates quoted shall be valid for a period of six months. Once the quotation is
accepted, the rates quoted shall be firm till the entire work is completed in all
ACCEPTANCE OF TENDER:
11. In c o m p l e t e / Conditional t e n d e r q u o t a t i o n s o r t h o s e r e c e i v e d
l a t e a n d /not confirming to the terms and conditions, the tender documents will
12. The Company reserves the right to reject any or every tender without assigning
any reason whatsoever and/or to negotiate with the tenderer (s) in the Company
considers suitable. The company further reserves its rights to allow to the
Public enterprises ‘Price Preference’ (facilities as admissible under the existing
policy) as may be decided by the company.
*EARNEST MONEY DEPOSIT: Not Applicable for Registered Vendor
Security Deposit: (Applicable only for works costing’50,000/- and above in value)
13 a). The successful tenderer, before commencement of the work, shall have to
provided to the company, by way of security, a money deposit or a Bank Guarantee
in the standard format provided by the Company for an amount equivalent to 3% of
the total tendered value of the works, subject to a minimum of `5000/- and a
maximum of `100000/- The tenderer shall have the option to adjust the earnest
money towards security deposit if he so desires.
The security deposit will be retained till the successful completion of the work. In the
case of security deposit in the form of a Bank Guarantee, the same shall be kept
valid by the tenderer at his cost till the completion of the work under contract and
shall be extended from time to time. No interest will be payable on security deposit.
EXECUTION OF AGREEMENT:
14. The successful tenderer shall within 15 days of the Company’s communication to
him of the acceptance of his tender, execute a formal Agreement with the Company,
TENDERER's SIGNATURE WITH RUBBER STAMP
on the Company’s format.
EXECUTION OF WORKS:
15. The successful tenderer should submit details construction programme adhering
to the completion time quoted in the Agreement. The programme will form part of
the contract. However, the company reserves the right to alter the programme, if
necessary, from time to time and no claim of successful tenderer on account of such
alternation will be entertained.
16. All materials required for the execution of work should conform to the standard
specification and approved by the Engineer in Charge before actually put to use.
Commencement of work without prior approval shall be entirely at the risk and cost
of the contractor. No delay due to non-availability of materials, tools, equipment etc.
will be entertained by the Company. In the case of certain machinery/equipment, the
Company’s site Engineer may inspect the items for approval before they are brought
17. The responsibility for the safety, security and accounting of the materials and
equipment brought or installed by the successful tenderer or handed over to him by
the Company for completion of the work will remain with him till the acceptance of
the work by the Company. Any damage caused to the material/equipment during the
execution of work will be made good by the successful tenderer at his cost. The
Company may require the successful tenderer to have guarantee/indemnity bond
executed for the value of the materials supplied to him free of cost, as per terms of
18. Quantities shown in the Tender Schedule are approximate and payment shall be
made as per actual measurements. The successful tenderer is not entitled for any
sort of compensation towards materials procured/stored in excess of the measured
19. The Company reserves the right to increase or to decrease the tendered quantity
or revise specifications, drawing, and designs of any or every item or delete them at
any stage of work. The successful tender’s claim for compensation or
damages on account of these shall not be entertained. Such deviations will be
adjusted at the rates contained in the Agreement or at prevailing market rates, if
the rates are not available in the agreement y issuing variation order(s). In
c a s e it becomes necessary for the Company to temporarily suspend or postpone the
TENDERER's SIGNATURE WITH RUBBER STAMP
work, partly, or fully due to unforeseen circumstances, the company shall not be
liable for any compensation on account of resultant delays.
20. The entire work will be carried out under the supervision of the authorized
representative of the Company, but this will not detract successful tenderer(s) full
responsibility for quality/period of execution of work.
21.Detailed measurements of works carried out shall be taken jointly by the
successful tenderer and out site Engineer at every stage of work, before preceding
the next stage. All work shall be measured as per the procedure laid down. Payment
will be made as per measured quantities and not as per Tender Schedule quantities.
22. The successful tenderer shall submit to the office which has awarded the
contract, periodic progress reports of his work as stipulated by our Site Engineer.
23. The successful tenderer shall not undertake on his own any change in
specifications mentioned in the tender documents. In case of doubts he will refer the
matter in writing to the Company and act as per clarifications given by the Company.
Any changes in the work involving changes in original specifications
quantities/additional items of work, should be covered by obtaining suitable
variation order (s) from the company immediately.
24. If the performance of the successful tenderer if found to be unsatisfactory, the
Company reserves the right to cancel in part or the whole of the contract and get the
work executed through alternative means at the entire risk and cost of the
successful tenderer.
25. If the successful tenderer does not complete the work in the stipulated time, the
Company reserves the right to recover liquidated damages at 0.5% of the total
contract value for every week of delay a part these of subject to a maximum of 5% of
the total contract value until the work is satisfactorily completed and handed over.
However delay in completion of a specific urgent job the maximum compensation will
be increased to 15% if the total contract value. Such damages may be deducted by
the Company from any money due to the tenderer and any further amount due from
the tenderer shall be paid by the tenderer to the company forthwith.
TENDERER's SIGNATURE WITH RUBBER STAMP
This is a specific urgent job: NO
26. The successful tenderer should ensure the safety of adjoining property and shall
make good and loss to product/property resulting from his negligence.
27. The work in the Company’s premises should be carried out during the Company’s
normal working hours and without obstructing day to day working the establishment.
If any work is required to be carried out beyond normal working hours, prior
permission should be obtained before undertaking such work.
29. In the event of the successful tenderer failing to complete the work within the
stipulated time, the Company shall have the right to employ any other agency to
complete the remaining work at the risk & cost of the successful tenderer.
30. It will be the successful tenderer’s responsibility to get the works approved and
obtain all certificates from local, municipal, Governmental or other required
32. During execution of work if it is found necessary to dismantle a portion of existing
bund wall, enclosure wall, compound wall, fencing etc. to facilitate the movement of
materials and equipment, the same shall be carried out after obtaining permission in
writing from Company’s authorized representative and also made good by the
contractor at his own cost.
33. The successful tenderer is expected to co-operate/ co-ordinate with other
contractor’s carrying out the work allocated to them so as to avoid breading up of
work already done by them or causing any hindrance in the progress of their work. In
case there is any difficulty/dispute, the same should be immediately brought to be
notice of the Site Engineer.
34. If the work is required to be carried out in a working Depot, Installation, retail
outlet etc. The progress of work is likely to be interrupted on account of operations in
such un i t s . Stoppage of work under such circumstances shall not entitle the
successful tenderer to claims any compensation for idling, machinery etc. during
such interruptions.
TENDERER's SIGNATURE WITH RUBBER STAMP
35. The successful tenderer and his man/men shall abide by all security/safety rules
regulations in force at location and the low, bye –laws and statutes of Government,
semi-Government and other local authorities such as requirements/liability under
enactments like the Workmen’s Compensation Act., Contractor labour Act etc. and
the Company shall stand indemnified against any claims on these scores. The
Successful tenderer and his men shall strictly abide by “no smoking ‘a n d other
petroleum regulations on the premises.
36. The successful tenderer shall arrange for at least one competent supervisor to
be present at the all time during the progress of the work, who shall be duly
authorized to take instructions and execute them on his behalf.
INTRIM PAYMENTS
37. At the sole discretion of the Company, the contractor can receive up to 90% of the
payment for the cost of work done. Interim bills should be duly supported by the
measurements of work actually done. (Payments shall be subjected to deduction of
Income Tax as may be applicable from time to time).
FINAL BILLS / RETENTION MONEY:
38. On completion of the work to the satisfaction of the Company’s authorized
representative and after clearing the debris, tools, tackles, shoring, centering
materials etc, from the site and obtaining necessary certificates as required from the
local authorities, the successful tenderer shall submit his final bill based on the jointly
recorded measurements of actual work done.
The final bill of the job done should be raised, unless otherwise agreed by the
Corporation in writing, within one month from the date of completion of the total
job as per contract. Whether the job has been completed or not will be decided at
the sole discretion of the corporation. Payment of the final bill will be made after
adjusting interim payments and retention amount deducted and retained.
38. (a) The Corporation will be entitled to deduct 10% value of all interim/running
bills and in final bills as Retention Money for all jobs exceeding 100000/- and no
interest will be paid on money retained by the company.
TENDERER's SIGNATURE WITH RUBBER STAMP
The said retention money will be retained for a period of one year and paid to the
Contractor after adjusting any dues of the Corporation against the Contractor under the
workmanship/materials provided to the Contractor and /or against any other claims
for any reason whatsoever under the Agreement which may arise within the said
period of the one year. The retention period of one year will commence from the date of
the final bill or the date of completion of the job (as reckoned by BPCL) whichever is
39. The successful tenderer shall not subject or assign any part of the work to another
party, without the prior written consent of the Company. In any event the successful
tenderer will be solely responsible for the work so subject or assigned.
40. The contractor undertakes to ensure due and complete compliance with all laws
regulations, rules etc., whether of the Central Government or the state Government or
any other competent authority applicable to the workmen employed or whose services
are otherwise availed of by the contractor whether in connection with the
construction work at the site or otherwise. The employer shall have the right to
inspect the records maintained by the Contractor concerning such workman from
time to time and the Contractor to produce of the Employer’s inspection in order to
ascertain whether or not the requirements of all such laws regulations, rules etc., have
been complied with by the Contractor. In the event of the any contravention of such
laws, regulations rules etc., coming to light whether as a result of such inspection or
otherwise, the Employer shall have the right to require the Contractor to effect such
compliance within such time as the Employer may prescribe in that behalf and in the
event of the Contractor failing to effect such compliance within the time prescribed by
the Employer then the Employer shall without prejudice to this rights to entitled to
withhold form the amount payable to the Contractor any amount payable to the
workmen under any such laws, regulations or rules and to make payment thereof the
workmen. The Employer shall also have in that event the right to terminate the
contract with immediate effect and to exercise powers reserved to the Employer under
the contract as result of termination.
41. Special conditions, if any pertaining to the tender are shown in Tender Schedule.
TENDERER's SIGNATURE WITH RUBBER STAMP
(a) Any dispute or differences of any nature whatsoever, any claim, cross-claim,
counter-claim or set off of the Corporation against the Contractor or regarding
any right, liability, act, omission or on account of any of the parties hereto arising
out of or in relation to this Agreement shall be referred to the Sole Arbitration of
the Director (HR) of the Corporation or of some officer of the Corporation who
may be nominated by the Director (HR). The Contractor will not be entitled to
raise any objection to any such Arbitrator on the ground that the Arbitrator is an
officer of the Corporation or that he has dealt with the matters to which the
contract relates or that in the course of this duties as an Officer of the
Corporation he had expressed views on all or any other matters in dispute or
difference. In the event of the Arbitrator to whom the matter is originally
referred being transferred or vacating his office or being unable to act for any
reason, the Director (HR) as aforesaid at the time of such transfer, vacation of
office or inability to act may in the discretion of the Director (HR) as designate
another person to act as Arbitrator in accordance with the terms of the
Agreement to the end and intent that the original Arbitrator shall be
entitled to continue the Arbitration proceedings notwithstanding his transfer or
vacation of office as an Office of the Corporation if the Director (HR) does not
designate another person to act as Arbitrator on such transfer, vacation of
office or inability of original Arbitrator. Such persons shall be entitled to
proceed with the reference from the point at which it was left by his predecessor.
It is also a term of this contract that no person other than the Director (HR) or a
person nominated by such Director (HR) of the Corporation as aforesaid shall
act as Arbitrator hereunder. The award of the Arbitrator so appointed shall be
final conclusive and binding on all parties to the agreement subject to the
provisions of the Arbitrator Act 1940 or any statutory modification or r-
enactment thereof and the rules made there under for the time being in force
shall apply to the Arbitration proceedings under this clause.
(b) The award shall be made in writing and published by the Arbitrator within
two years after entering upon the reference or within such extended time
not exceeding further twelve months as the Sole Arbitrator shall be writing under
his own hands appoint. The parties hereto shall be deemed to have irrevocably
given their consent to the Arbitrator to make and publish the award within the
period referred to herein above and shall not be entitled to raise any objection
TENDERER's SIGNATURE WITH RUBBER STAMP
or protest thereto under any circumstances whatsoever.
(c) The Arbitrator shall have power to order either of the parties to abide by observe
and perform all such directions as the Arbitrator may think fit having regard to
the matters in difference i.e. dispute before him. The Arbitrator shall have
all summary powers and may take such evidence oral and / or documentary, as
the Arbitrator in his absolute discretion thinks fit and shall be entitled to
exercise all powers under the Arbitrator Act
claim or set off before the Arbitrator in respect of any matter an issue arising out
of or in relation to the Agreement without seeking a formal reference of
Arbitration to the Director (Marketing) for such counter-claim, Cross-claim or set
off and the Arbitrator shall be entitled to consider and deal with the same as if the
matters arising there from has been referred to him originally and deemed to
Form part of the reference made by the Director (Marketing).
d) The parties against whom the Arbitration proceedings have been initiated, that is
to say, the Respondents in the proceeding, shall be entitled to prefer a cross-
(e) The Arbitrator shall be at liberty to appoint, if necessary any Accountant or
Engineer or other technical person to assist him and to act by the opinion so
(f) The Arbitrator shall have to make one or more awards whether interim or
otherwise in respect of the dispute and difference and in particular will be entitled
to make separate awards in respect of claims or cross-claims of the parties.
(g) The Arbitrator shall be entitled to direct any one of the parties to pay the costs of
the other party in such manner and to such extent as the Arbitrator may in his
discretion determine and shall also be entitled to require one or both the parties
to deposit funds in such proportion to meet the Arbitrator’s expenses whenever
called upon to do so.
(h) The parties hereby agree that the courts in the city of Mumbai alone shall have
jurisdiction to entertain any application or other proceedings in respect of
TENDERER's SIGNATURE WITH RUBBER STAMP
anything arising under this Agreement and any award or awards made by Sole
Arbitrator here under shall be failed in the concerned courts in the city of Mumbai
Tenderer should mention estimate of time for Weeks / Months: One year from
Completing the work shown in the tender.
This is a specific urgent job : No
I / We have read carefully the above terms
and conditions of Tender and agree to abide by
Signature of the Contractor..(Or his authorized
representative)
Name / Seal of the Contractor:
TENDERER's SIGNATURE WITH RUBBER STAMP
SPECIAL TERMS & CONDITIONS
1) Jobs mentioned in "Schedule of Quantities & Rates" must be carried out as and
when required. Corporation does not assure the quantity of the job as mentioned
in "Schedule of Quantities & Rates". Payment will be made on actual job
undertaken i.e., on service basis only.
2) Manpower involved in the job will stay inside the plant during the period of job
execution only. No unwanted gathering of contract persons will be allowed inside
the plant premises. At any time, the job is completed and the contract persons are
not involved in any job, it is contractor's responsibility to keep them outside the
licensed premises of the plant for the purpose of maintaining safety & security of
3) The persons engaged should observe all the safety precautions while on duty and
the contractor is liable to supervise the working throughout the day. The
contractor shall be held responsible for any deviation from the safety rules &
regulations. He shall be held responsible for any damage caused to the property of
plant during the execution of the job.
4) Normal Plant Operating time is 08.30 hrs. to 17.00 hrs. Extending the plant
operation or operating it in weekly off / holidays depends upon market demand or
work exigencies since this is a job contract, hence no extra/Over Time payment
shall be entertained for job done on weekly offs/Holidays/extended hours etc.
5) The quality of job shall be maintained as per BPCL’s satisfaction. Decision of
BPCL’s authorized representative shall be final in all respects.
6) Payment will be made on monthly basis on the actual quantity of work done by the
contractor with satisfactory performance. Payment will be made through cheque
/NEFT as decided by the corporation.
7) The successful tenderer shall provide all necessary safety equipment like Safety
shoes, Hand Gloves, Helmets & Uniforms boiler suits etc.
8) All tools & tackles will be supplied by BPCL.
9) Materials for stenciling of cylinders like Paint & Painting material have to be
arranged by the successful tenderer.
10) Record of jobs carried out have to be maintained in separate sheets/ books
/ registers by the contractor’s supervisor and it has to be verified by Officer in
charge on daily basis.
11) All statutory, Safety and Company requirement/instructions have to be
adhered to and fulfilled during executing the job.
TENDERER's SIGNATURE WITH RUBBER STAMP
12) TDS / Other taxes, if applicable, will be deducted at source only.
13) No Counter Terms and conditions shall be accepted, and rate has to be
quoted as per enclosed format (Schedule of Quantities & Rates) only.
14) The contract will be in force for a period of one year from the date of
commencement of contract. The contract may be extended for a one more year at
the same rates and terms and conditions on mutual consent of both the parties.
Hence the contractor shall quote the rates considering the same.
15) Any deviation from the terms and conditions will lead to the rejection of the
quotation of the contractor.
16) Contractor has to provide sufficient manpower to carry out all the jobs as
mentioned in the schedule of quantities and rates. As per BPCL, minimum
manpower required for the subjected Job is 4 Nos in 3 shifts ( 1 General shift &
other shifts for round the clock service in a day) for electrical operations and
maintenance and firefighting operations and maintenance. If tenderer identifies
manpower requirement is less than 4 nos., then 4 no. of manpower is to be
deployed for the subjected job by the tenderer and if manpower requirement as
per contractor comes out to be more than 4 no. then tenderer should quote
accordingly in the tender and manpower to be accordingly positioned.
17) The job should no way affect the normal operations of the Plant/ Office.
18) The contractor at its own cost, if required, shall take necessary insurance
cover in respect of the previously mentioned services rendered to BPCL and shall
comply with statutory provisions of Employees State Insurance Act, Workman's
compensation Act - 1923, Payment of Wages Act - 1936, The Employees Provident
Fund (and Misc. Provisions) Act - 1952, The payment of Bonus Act - 1965, The
Minimum Wages Act - 1948, Employer's Liability Act - 1938, Employment of
Children Act - 1938 and / or any other Rules / regulations and amendments to
these acts/ or statutes that may be applicable and shall further keep BPCL
indemnified from all acts or omission, fault, breaches and / or any claim, demand,
loss, injury and expense arising out from the non-compliance of the aforesaid
statutory provisions. Contractor's failure to fulfill any of the obligations hereunder
and / or under the said Acts, rules/regulations and/or any bye-laws or rules
framed under/or any of these, BPCL shall be entitled to recover any of such losses
or expenses which it may have to suffer or incur on account of such claims,
demands, loss or injury from the contractor's monthly payments.
19) The successful bidder shall submit details such as names, parentage,
residential address, age etc. of persons deployed in the plant premises for the
purpose of proper identification of its employees deployed at various points. All
the persons deployed shall follow all control and access systems and all safe
practices inside the plant during execution of the job. The contractor should
submit report of Police verification of persons deployed.
TENDERER's SIGNATURE WITH RUBBER STAMP
20) The contractor shall issue NEW uniforms and Personal Protective
Equipment viz. Safety Helmet with chin strap and Anti-static Safety shoes as
approved to its employees for proper identification uniform/boiler suits on the
day of starting the contract.
21) Contractor has to accept full and exclusive liability for the Wages, PF, ESIC,
Medical, Bonus, Gratuity, leave etc. for the personnel deployed by you and any
other obligations referred under the law now and thereafter imposed by the Govt.
22) EMD in the form of DD has to be submitted in favor of BHARAT
PETROLEUM CORPORATION LTD., payable at Nagpur as per clause no 13 of
General conditions of tender.
23) Once the order is placed, rates mentioned therein will not be changed
during complete tenure of the job and it will be firm.
24) Tender received after closing date & Time will not be considered for
25) Contractor to study all standard BPCL guidelines & Standard Operating
Procedures (SOP) before uploading the tender response.
26) Any additional work/job arising due to Non-familiarization with actual site
conditions shall be contractor’s scope of work. Hence it is advised that contractor
shall get familiarized with site conditions before uploading the tender response.
27) Vendor to get all the tender related doubts and questions clarified during
the pre-Bid meeting itself. Any additional work/job arising due to Non-familiarity
of tender terms & conditions shall be contractor’s scope of work.
28) All the On-line jobs stated in the Schedule of rate (SOR) items shall be
executed without hampering the production. Any line getting jammed due to
delayed response/ deviation from standard operating procedures / any intended
action hampering the production line shall be penalized. Any position on the
filling/production line remaining vacant due to absenteeism shall be penalized as
29) Contractor shall deploy a full time Supervisor to distribute/Engage/Assign
the works as well as monitor the work/performance of each worker. The
supervisor shall appraise the Shed officer/Engg-in-charge regarding work
allocation and maintain all necessary documentation/log books etc. at no
additional cost.
TENDERER's SIGNATURE WITH RUBBER STAMP
30) Penalty for absenteeism shall be deducted at the rate “DOUBLE THE
MINIMUM WAGES/RATES QUOTATED” whichever is higher/applicable as on date
per absenteeism per day from next monthly bill submitted.
31) No bill shall be processed without furnishing the mandatory/statutory
documents along with the bill which includes: NEFT transfer of monthly payment
to workers, Monthly ESI & PF statements, attendance sheets, Muster Roll, daily
basis measurement/calculation of utilized line items of the work order, Taxable
Invoice as GST guidelines, other documents stated in the General Terms &
condition, Special Terms & conditions, etc.
32) The tender response by contractor is liable for rejection in case the rates
quoted are found to be abnormally low than the Sum total of Minimum wages
(including ESIC, PF, PT, Bonus and other statutory payments) to be paid to the
contract workers in total.
33) Each and every manpower deployed for providing assistance of the
subjected job must keep the place of job neat and clean every time before starting
of operations and after closing of operations.
34) All the Jobs mentioned in the line items must be completed on end to end
basis. The job assigned on a day basis must be completed fully by the personnel
and no other additional charges claims of any kind will be considered. This service
also includes maintenance in off-shift hours and no additional charges/claims of
any kind will be considered.
35) The major responsibility in this service is to ensure NIL breakdown/ NIL
production loss due to equipment poor maintenance/Breakdown. Plant will be
running on staggered basis as per Market demand. The same must be followed by
Tenderer for ensuring everything as per requirements and mentioned in above
conditions and scope of work.
36) Preventive maintenance schedule to be strictly followed for each and every
equipment in LPG bottling plant. All the record keeping to be done as per BPCL
requirement. Proper records to be maintained strictly for every equipment as per
preventive maintenance schedule, OISD-144, OEM recommendation, Maintenance
In charge and as per other statutory requirements applicable in LPG Bottling plant.
37) Planning of maintenance and preparation of spares in advance to be
ensured with available spares in plant in order to avoid time loss during
maintenance. Proper accounting system to be maintained for the available spares,
spares required and spares that can be repaired/reused.
TENDERER's SIGNATURE WITH RUBBER STAMP
38) All the tools provided by the plant for regular maintenance is property of
plant and that needs to be kept in proper condition till the end of contract. The
accounting of mechanical tools is to be followed strictly and any damage or loss of
tool will be responsibility of the responsible vendor and the loss or damage of tool
needs to be repaired by the vendor without any delay.
39) Person employed/technician should have appropriate knowledge of Kosan
carousel & downstream facilities, mechanical maintenance, pneumatic circuits etc.
Cylinder filling accuracy should be attained every time as per BPCL requirement.
40) All the equipment which the plant issues to responsible vendor/contractor
for day to day operations will be the responsibility of vendor/contractor till the
time it is in use for operations or maintenance. All the equipment and tool which
will be issued for the maintenance service to be used only for BPCL work.
41) Every safety system implemented in BPCL LPG Plant is to be followed strictly while
the execution of all operations and maintenance as per scope of work of the
tender. Any deviation of the SOP by the deployed manpower of vendor/contractor
will be considered as safety violation.
42) This service also includes job of assisting in any type of AMC visits by OEMs
of all equipment.
43) Gathering/Discussion/Other non-relevant jobs are not allowed in any
location and only responsible personnel will be allowed to access the MCC Room.
44) This job includes end to end responsibility for all type of maintenance and
operations. Maintaining all records related to operations and maintenance. The Job
also includes responsibility for nil breakdown, best quality and efficient
45) There are multiple fields in this job such as: repair, maintenance, testing and
calibration. This job is having responsibility for using the SOP and instruction of
engineering in charge and other relevant guidelines of BPCL in order to solve
problems and come up with solution in development, construction, inspection,
and maintenance of systems and products.
TENDERER's SIGNATURE WITH RUBBER STAMP
TENDER NO: LPG.WR.NGP.19. TENDERS.02/2022-23
TENDER NAME: PROVIDING SERVICES FOR OPERATION & MAINTENANCE OF FIRE FIGHTING AND
ELECTRICAL SYSTEM AT NAGPUR LPG BOTTLING PLANT
SCOPE OF WORK: -
FIRE FIGHTING SYSTEM MAINTENANCE
1. Job includes assistance to maintain following Fire Fighting Equipment and to
ensure that the Fire Fighting System is working in Auto Mode for round the clock
and it actuates effectively during emergency period.
2. Upkeep of Fire water Pump House & other Facilities and always maintaining
approach road & surrounding area of Fire Fighting facilities free of grass &
weeds throughout the year
3. Maintaining and updating the record of all Fire Fighting facilities as per the
instruction of officer In charge.
4. Maintenance of following Fire Fighting Facilities in Plant
• Fire Water Engines & Pumps (3 No)
• Jockey Pump (2 No)
• Air Compressor for Fire Fighting (2 No)
• Strainer at Suction to the Fire Water pumps (3 No)
• Emergency Trolley with PPE (1 No)
• All Fire Fighting Equipment
• All Safety Equipment
5. Monthly/Quarterly/Half Yearly Checking and corresponding record keeping of
65 nos of 10 kg DCP Fire Extinguisher & also to ensure above extinguishers are
functioning. More Fire Extinguishers can be added as per requirement.
6. Monthly/Quarterly/Half Yearly Checking and corresponding record keeping of
nos of 10 kg foam type DCP Fire Extinguisher & also to ensure above
extinguishers are functioning. More Fire Extinguishers can be added as per
7. Monthly/Quarterly/Half Yearly Checking and corresponding record keeping of
nos of 75 kg DCP Fire Extinguisher & also to ensure above extinguishers are
functioning. More Fire Extinguishers can be added as per requirement.
8. Hydrotesting of All Fire Extinguishers and record maintenance for the same.
9. Monthly/Quarterly/Half Yearly Checking and corresponding record keeping of
nos of CO2 Fire Extinguisher & also to ensure above extinguishers are
10. To ensure all Sprinkler Nozzles are in working condition including record
TENDER NO: LPG.WR.NGP.19. TENDERS.02/2022-23
11. Monthly/Quarterly/Half Yearly Checking / Carrying out maintenance of 18 nos
of Double Hydrant and corresponding record keeping as per instruction of
Officer In charge.
12. Monthly Checking / Carrying out maintenance of 13 nos of Double Hydrant and
corresponding record keeping as per instruction of Officer In charge.
13. Hydrotesting and record keeping of fire hydrant hoses once in every quarter.
14. Strainer cleaning of Fire Engines and Deluge valves. Updating the record and
maintaining the same.
15. Monthly/Quarterly/Half Yearly checking / carrying out maintenance of 27 nos of
Water Monitor and corresponding record keeping as per instruction of Officer In
16. Monthly/Quarterly/Half Yearly checking / carrying out maintenance of 12 nos of
Deluge Valve and corresponding record keeping as per instruction of Officer In
17. Monthly/Quarterly/Half Yearly checking / carrying out maintenance of 25 nos of
Fire Water line Gate Valve and corresponding record keeping as per instruction
of Officer In charge.
18. To ensure that the Fire Water Tanks are always full 365 days a year. To regulate
the supply of MIDC water by operation of valves judiciously, so that the tank
does not overflow also. Optimum usage of water to be ensured.
19. To ensure filling of diesel tank of fire engines from underground HSD tank/ HSD
barrel, as applicable, as and when required, with all the safety precautions and to
ensure that all the diesel tanks of fire engines are 80% full all the time.
20. To do any other job as per the instructions of BPCL plant officials as and when
21. It also includes carrying out preventive/breakdown maintenance of fire fighting
systems on holidays or Sundays or closed working days as per instructions of
officer in charge.
22. To Ensure Monthly Checking & Maintenance of MCP
23. To Ensure Monthly checking of PPE in Emergency Trolley such as Breather
apparatus Fire Proximity Suit, Explosivemter, and Sand Buckets Etc.
24. To Ensure Monthly checking of First aid Boxes
25. To Ensure painting of test dates & due dates on Equipment after
testing/maintenance.
TENDER NO: LPG.WR.NGP.19. TENDERS.02/2022-23
26. To Ensure Monthly maintenance of all hose boxes nozzles
27. To Ensure Monthly /Quarterly/ Semi-annually/Annual Maintenance &
Hydrotesting of all fire Hoses.
28. To Ensure Smooth operation & checking of fire panel & report to Engineering in
charge as and when problem is reported.
29. Following of monthly, quarterly, half yearly and yearly maintenance schedules as
per OEM, maintaining min. 8kg/cm2 pressure at farthest point in fire hydrant
system, minimum running of jockey pump on account of gland, valve & flange
joint leaks at pumps, hydrants, monitors, Deluge valves etc., updating of records
and other allied works as per instructions from officer in charge (material &
tools will be provided by BPCL).
30. Maintenance & up-keep of all records related to firefighting system and as per
instruction from officer in-charge.
31. Minimum one workman required for this job.
32. Vendor to ensure that jobs include all related to FWPH, FW tanks, safety systems,
FW tripping etc. as advised by officer in-charge.
33. Checking of MCP and ESD system as per the schedule provided by officer in
34. Checking and monitoring of IRIS System for Fire Fighting and associated jobs.
35. The Scope of work also includes keeping, recording, and reporting of all ISA,
OISD and Other statutory audit points in a record form. The compliance of all the
Audit and statutory points to be done as per instruction of officer in charge and
record keeping being done.
36. All the work related to Audit and statutory points for Fire fighting system to be
executed as per scope of work and records to be maintained for the same. The
reporting to be done on day-to-day basis to Officer In charge.
ELECTRICAL SYSTEM MAINTENANCE
1. The successful Contractor shall carry out Preventive Maintenance for all the
electrical Equipment in the plant as per the OEM & Office In-charge
recommendations and OISD – 110, 137, 144, 147, 148, 173 & BPCL Electrical
manual recommendations and instructions.
TENDER NO: LPG.WR.NGP.19. TENDERS.02/2022-23
2. The successful Contractor shall carry out Daily, weekly monthly, half yearly,
yearly Maintenance for all the electrical related equipment (viz. MCC Panel,
Changeover Panels, APFC Panels, UPS, Breakers, Transformers, DG sets, Fire
Engines, Air Compressors, ROVs, Lighting, Motors and Records are to be updated
as per the instruction of officer in charge.
3. Maintenance and Upkeep of Suitable Records, Logbooks & Reports for Hourly,
Daily, Weekly, Monthly, Quarterly, Half Yearly and Yearly Maintenance as per
BPCL formats and requirements. (as per officer in-charge. Record book/Logbooks
will be provided by BPCL)
4. The successful Contractor, Helpers should maintain Drinking & service Water
distributions works. Drinking & service water levels are to be monitored &
shortage of water is to be informed in advance to the concerned officer.
5. The successful Contractor Helpers should assist to the Process operator
whenever require.
6. Successful contractor should be thorough with all network cables systems and
telephone systems in admin building, any breakdowns of these systems should be
attended and rectified.
7. Vendor to ensure deployment of manpower with proper license and certification
required to work in LT system of industry as per central electricity board/ state
electricity rules.
8. The Vendor and contract labor have to ensure and comply with all rules,
regulations, laws and statutory norms of State Government and Central Electricity
board, certificate license as applicable.
Maintenance & record keeping for All Electrical equipment
• Line Item-2: Providing Assistance in Electrical System Operation & Maintenance
at Nagpur LPG Plant Electrician (Skilled) - Availing Services for Operation &
Maintenance of Electrical System in Plant as per Scope of Work - Total 3 Skilled
Electrician required per day for 3 shifts.
Manpower Details as below –
1 no. Skilled Electrician for electrical operations and maintenance during general
shift, 1 no. Electrician will be for manning of MCC Room and Firefighting room as
per OISD recommendations during second shift (after plant operations) and 1 no.
Electrician will be for manning of MCC Room and Firefighting room as per OISD
recommendations during night shift i.e. total 3 skilled electricians per day.
TENDER NO: LPG.WR.NGP.19. TENDERS.02/2022-23
• Line Item-3: Providing Helper in Electrical System Operation, Maintenance at
Nagpur LPG Plant - Electrician helper (Semi - Skilled) - Availing Services for
Operations & Maintenance of Electrical System in Plant as per Scope of Work -
Semi Skilled electrician will be as a helper in general shift for assisting in
operations and maintenance i.e. for 12 months.
Note: Plant is operational 365 days and Vendor has to ensure 2 manpower in general
shift & 1 manpower each in 2 remaining shifts i.e., 4 Manpower in a day.
1. MCC Panels = Preventive Maintenance quarterly, Half-yearly, Yearly as per the
schedule. All the PMS sheets after signing of the officer should be submitted with
the bill. Cleaning of Panel to be done on quarterly basis, all nuts and bolts of
Conductor to be tighten after taking prior shut down.
2. Earth Pit testing = Preventive maintenance Monthly, quarterly, Half-yearly &
yearly as per the schedule to be done. All the PMS sheets after signing of the
officer should be submitted with the bill. Testing of earth pit on half-yearly basis
to be done religiously and report to be submitted.
3. Transformer and allied equipment = Preventive maintenance Monthly, quarterly,
Half yearly & yearly as per the schedule to be done. All the PMS sheets after
signing of the officer should be submitted with the bill. Oil testing to be
coordinated on yearly basis.
4. Circuit Breaker = Preventive Maintenance yearly as per the schedule. All the PMS
sheets after signing of the officer should be submitted with the bill.
5. Generator Engine (125KVA, 250 KVA) = Preventive maintenance monthly,
quarterly, half yearly, yearly as per the schedule. PMS sheets after signing of the
officer should be submitted with the bill. Party has to do the regular routine
maintenance & major maintenance will be done by the OEM as arranged by the
6. DG Alternator & Control Panel = Preventive maintenance monthly, quarterly,
Half Yearly & Yearly as per the schedule. Checking of DG tripping report to be
submitted on quarterly basis.
7. All Electrical motors and their local controls panels, Push Buttons & Cables, JBs=
Preventive maintenance monthly, quarterly, half yearly, yearly as per the
schedule. PMS sheets after signing of the officer should be submitted with the
bill. Motor Current to be note down on monthly basis, Motor Winding Insulation,
and cable insulation to be checked on half yearly basis and report for same to be
TENDER NO: LPG.WR.NGP.19. TENDERS.02/2022-23
8. Cathodic Protection = Preventive Maintenance monthly, quarterly, half yearly &
yearly as per the schedule. PMS sheets after signing of the officer should be
submitted with the bill. Minor maintenance will be done by the party & major
maintenance will be arranged by the company from OEM.
9. All Critical equipment and their control panels.
10. Instrumentation panel and its field equipment.
11. Solar Panel maintenance work and record up keeping.
12. Lighting system of high mast tower, Building and Shed lightings and Lighting in
Admin building. Lux meter reading to be noted down on quarterly basis and
report for the same to be submitted along with the bill.
13. Testing and calibration of relays and making proper setting.
14. Checking and resetting of relays in starter of motors of each motor starter in
MCC panel as well as panels of critical machines.
15. Ensuring proper rating fuses are put in panels.
16. Maintenance of the ETP System on monthly basis.
17. Ensure all indicator lamps are in working condition and are in place.
18. Monitoring the electricity consumption on daily basis and efforts should be made
that the electricity consumption does not rise unexpectedly and measures to be
19. Carrying out the LAN/ telephone repairs/Pager phone jobs as & when required.
20. Liaising with MPECB for completion of the various recommendations / norms.
21. Ensure timely compliance of all Electrical Audit/ISA/ESA recommendations in
consultation with the Engineering In charge.
22. Any electrical maintenance of equipment not given above but instructed by
TENDER NO: LPG.WR.NGP.19. TENDERS.02/2022-23
23. Checking of capacitor Bank to be done on monthly basis and format of
performance of capacitor to be submitted along with Bill.
24. Checking of FLP glands to be done on monthly basis and report to be submitted
along with the bill, if any loose gland found then it should be attended
immediately. Any oversize gland to be replaced with NEW FLP gland provided by
25. Updating of Single line diagram, Cable route diagram, Earth Pit diagram, Lighting
diagram on regular basis or as and when changes occur in the system to be done
by contractor personally and same should be discussed with Plant Officer. No
extra cost will be given for the changes done in diagrams.
26. Updating Earth pit diagram on yearly basis/ as per instructed by officer in charge
to be done by contractor personally and same should be discussed with Plant
27. All critical panels, lighting panels to be always operational. Bulbs including street
lights within the plant area. Rectification of fault in motors or in the panels of air
compressor, air dryer, LPG compressor, fire water engines, Jockey Pump panel
and DG panel, MCC room, HT Transformer yard including MPEB, all sheds, LPGG
pump house etc.
FOLLOWING ELECTRONICS THING NEEDS TO BE CHECKED
28. Ensure proper working and power supply to CCTV Cameras. frequency- Weekly
29. Checking of All connection of Kosan Connector and cleaning the same with CRC/
aerosol on Sunday/Holiday or as directed by BPCL Officer. frequency- Monthly
30. Checking of UPS for back-up to be done on Sunday and proper records to be
maintain on monthly basis. frequency- Monthly
31. Checking of Hand Held Metal detector and Door Frame Metal Detector on
monthly basis - frequency- Monthly
TENDER NO: LPG.WR.NGP.19. TENDERS.02/2022-23
32. Checking of FLP Battery for its proper Function - frequency- Daily
33. Checking of Emergency Light for its proper Function- frequency- Daily
34. Checking of ALL telephone Connection as well as Instrument. Hand receiver coil
if found damaged same needs to be replaced immediately- frequency- Monthly
35. Checking of High mast towers for its proper functioning replacement/repair of
the same if found non-functional - frequency- Monthly
36. Checking of shed lighting for proper functioning and replacement/repair of the
same if found non-functional - frequency- Monthly
37. Checking of Fire Engine Panel for Battery Charging - frequency- Daily
38. Checking of LED light if it is not working. frequency- Monthly.
39. Checking of VHF battery charger - frequency- Daily.
40. Checking of GMS system- frequency- Daily.
41. Checking of All UPS for normal functionality- Frequency- Fortnightly.
42. Any other Equipment instructed by Officer In charge.
43. Filling of all PMS registers, history cards and other reports given by Officer in
charge on time-to-time basis.
44. Checking of IRIS system and monitoring the status (healthy conditions of
equipment in Panel)
Also maintaining the corresponding records for the same
• Maintenance of critical equipment
TENDER NO: LPG.WR.NGP.19. TENDERS.02/2022-23
Providing assistance to ensure all ROVs, critical equipment like Pressure switches,
Temperature Switches, MCPs, Emergency Trip Switches, DV Panel & Fire Alarms, CP
system and GMS system etc. are in operating condition.
• Battery Maintenance
Fortnightly & Monthly Checking & maintaining records for all batteries and ensuring
those are in working condition and it should be fully charged at all the time.
• Maintenance of supply points & lighting facilities
Providing assistance to ensure all power supply points and lighting are working at
Office Building / Time Office / PCVO Room / Security Gate/Sheds/High Mast/Street
Lights/MSV area etc.
• Assistance in Fire Fighting System
➢ Maintaining min. 8kg/cm2 pressure at farthest point in fire hydrant system,
minimum running of jockey pump on account of gland, valve & flange joint
leaks at pumps, hydrants, monitors, Deluge valves etc
➢ Test running of fire engines, topping up of diesel, maintaining always in auto
mode and other allied works as per instructions from officer in charge
(material & tools will be provided by BPCL)
➢ Vendor to ensure that jobs include all related to FWPH, FW tanks, safety
systems, FW tripping etc as advised by officer in-charge.
➢ Vendor to ensure manning during non-availability of Fire Water operator.
• The party has to take all the corrective measures for the equipment during the
preventive maintenance, which will affect the Breakdown of equipment. If the
equipment breakdown within one month after preventive maintenance, then the
break down maintenance charges will be debited from the parties monthly bill.
• The party has to submit the entire preventive maintenance sheet after taking the
sign of the officer in charge along with the bills. Bills will not be passed without
the preventive maintenance sheets. If party fails to do the preventive
maintenance of certain equipment, then the proportionate amount will be
deducted from the monthly bill.
TENDER NO: LPG.WR.NGP.19. TENDERS.02/2022-23
• Shutdown maintenance required for any equipment will be done after closing of
plant in week days or on Sundays/Holydays. For this purpose no extra cost will
be given to the party.
• Maintenance works would be carried out during shift, off-shifts, nights, holidays,
and Sundays as directed by officers in charge to the satisfaction of officer in-
charge. It is to be ensured by the successful contractor that sufficient manpower
is available during maintenance activities as required and directed by BPCL
Officer In-charge.
• Assistance & supervision during Audits/Inspection and OEM engineers visit for
all DG sets, Fire engines, Firefighting panels, MCC room Panels, Air & LPG
compressor, level gauges, Temperature gauges, CP system and other all electrical
• Scope of Work is indicative and Vendor has to ensure records upcoming time to
time as directed by the officer in-charge.
1. Record keeping of all the Preventive maintenance records, Electrical Audit
Compliance and work, Internal Safety Audit Compliance documents and status,
OISD Audit compliance documents and status and for other statutory works
related to electrical systems.
2. The scope of work will also include 100% glanding as per requirement, 100%
dressing of all the cables inside plant, 100% cables laid in proper way in cable
tray/trench/Pipe etc. inside plant, 100% earthing & bonding at every equipment,
structure, pipelines, hoses and wherever it is required as per audit/statutory
requirement. Proper record keeping being done for all the work mentioned
3. Day to day monitoring of power consumption inside plant and report making for
analysis and corrective action.
4. Regular recording of readings from meter room in record, visit to all facilities on
regular basis and recording of observations related to electrical maintenance as
well as corrective actions.
5. Regular monitoring, checking and corrective action for IRIS Systems, IT Systems
– Daily log recording and reporting to engineering in charge.
6. Day to day checking of ultra-critical activity trolley and placement of trolley
wherever UCVA is to be planned. This includes maintenance of trolley and
7. Rigorous maintenance and testing of earth pits inside plant to keep the
resistance within limits and proper record keeping.
TENDER NO: LPG.WR.NGP.19. TENDERS.02/2022-23
8. Maintenance of Earth Pits as per IS3043 rules and to ensure NIL audit points
related to earth pits in audits.
9. Maintenance and upkeeping of MCC Room and panels with all meters to be in
working condition.
10. Regular checking of all the lights inside plant and monitoring of Lux level and
record keeping. Corrective action to be taken for improvement of the lux level
and is to be maintained as per OISD standards.
11. Monitoring of relay testing and insulation resistance testing of equipment to be
12. Improvement to be done for the power consumption inside plant – Corrective
measures to be taken and development plant to be made for efficient use of
power inside plant.
Qualification for Electrical Maintenance:
A. Electrician -
1. The person should have valid “Electrical Wireman License” as per statutory
2. The person should have educational qualification of ITI electrical or higher.
3. He should have work experience of at least 1 year as electrician in any industry.
B. Helper in Electrical maintenance and operation –
1. The person should have educational qualification of ITI electrical.
2. He should have work experience of at least 1 year as electrician in any industry.
SCOPE OF WORK: -
Assistance in Miscellaneous Works as and when required for assistance
in electrical as well as fire fighting maintenance works
1. To handle all tools tackles etc.
2. To ensure all works as guided by engg-incharge.
3. Carry Out mechanical / Major Maintenance? Breakdown Maintenance Jobs as
guided by engg in charge.
4. To Assist Manpower engaged in Fire Fighting Maintenance Jobs/Electrical
Maintenance Jobs as and when required.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
4141.pdf
pdf • 0.67 MB
BUDGETDOC_4141.pdf
pdf • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .