| 1.00Civil Works | |||||
| 1.00 | 60.1.2
RING BUND Type II Putting up ring bund with earth fille gunny bags of top width
1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form
ring bund and maintaining the same leak proof till the completion of the work and
clearing the site by dismantling the bund after completion of the work.etc.complete. | 10.4 | Metre | 1,327.69 ₹13,807.98 Lowest | 1,327.69 ₹13,807.98 Lowest |
| 1.00 | 60.2.2
Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set
including conveyance to site and erection,cost of fuel, lubrication oil and other stores,
pay of staff etc complete | 320 | Hour | 419.69 ₹1,34,300.8 Lowest | 419.69 ₹1,34,300.8 Lowest |
| 1.00 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5
m, as directed by Engineer-in-charge.All kinds of soil | 313.2 | Cum | 236.63 ₹74,112.52 Lowest | 336.5 ₹1,05,391.8 |
| 1.00 | 51.2.3
Filling with Quarry Muck <br> Filling up low lying and water logged areas
with local material/ quarry muck, spreading in layers, leveling the top at site and
consolidation by ramming, etc complete for improving the CBR value of subgrade | 32.4 | Cum | 906.44 ₹29,368.66 Lowest | 906.44 ₹29,368.66 Lowest |
| 1.00 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4
coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | 27 | Cum | 7,286.51 ₹1,96,735.77 Lowest | 8,265.3 ₹2,23,163.1 |
| 1.01 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 57.6 | Cum | 9,634.13 ₹5,54,925.89 Lowest | 9,850.3 ₹5,67,377.28 |
| 1.01 | 5.2.2
Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. up tot floor five level excluding cost of centering,
shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded
stone aggregate 20 mm nominal size derived from natural sources) | 135 | Cum | 11,731.49 ₹15,83,751.15 Lowest | 11,731.49 ₹15,83,751.15 Lowest |
| 1.01 | 5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more | 5,904 | Kg | 103.26 ₹6,09,647.04 Lowest | 103.26 ₹6,09,647.04 Lowest |
| 1.01 | 4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work
for:Foundations, footings, bases for columns | 54 | Cum | 354.69 ₹19,153.26 Lowest | 354.69 ₹19,153.26 Lowest |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
24 Dec 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ENGINEER (PROJECTS)
KEL MAMALA KOCHI
Malappuram District Panchayath-Project No. 1340-26- Improvement Works of Moorkkamkundu Thodu in Thiruvali GP, Malappuram District
2025_KEL_822263_1
KRO/BDC/2267/2025
Open Tender
Civil Works - Buildings
Item Rate
KEL MAMALA
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹50,000
Yes
29 Dec 2025
17 Dec 2025
26 Dec 2025
17 Dec 2025
24 Dec 2025
17 Dec 2025
17 Dec 2025 - 24 Dec 2025
Amount
Civil Works
60.1.2 RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
60.2.2 Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
51.2.3 Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
60.6 PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
EXCLUSIVE OF GST
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL
2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items
3.Rate should be Exclusive of GST.
4.Work should be executed as per DSR/PWD specification and direction of Engineer at site.
5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
6.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
7.STEEL REINFORCEMENT: Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference
8.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.)
9.Rigid PVCPipes/Casing & Capping - A-ONE/REPUTED MAKE with ISI , Precession, Balco, GEO
Daybro constructions (BID ID -2446613)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1378088.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .