Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance | ₹6.9 L | L1 | Admitted-Finance |
| 2 | L2₹7.0 L+₹6,969 (1.01%)Admitted-Finance | ₹7.0 L+₹6,969 (1.01%) | L2 | Admitted-Finance |
| 3 | L3₹7.2 L+₹34,569 (5.01%)Admitted-Finance | ₹7.2 L+₹34,569 (5.01%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | radhika electronics L1 | Affinity Infracon L3 | M/S NEW STAR TRADERS L2 |
|---|---|---|---|---|---|---|
| 1.00fo|qr~ ijh{k.k [kaM xksyk ds {ks=kUrxZr fo|qr~ ç;ksx'kkyk xksyk]eksgEenh ,oa ify;k esa LFkkfir i‚oj ifjorZdks dh :Vhu VsfLVax ds dk;Z gsrq | ||||||
| 2.00 | (A) Testing of all power transformer including earth resistive test,open circuit test,short circuit test,magnetic balance test,voltage ratio (open circuit test at normal tap),magnetic balance test at normal tap,magger result test.Calibration of WTI & OTI,meffar result test ,oil testing .
(B) The 33/11 KV power transformer marshalling box and breakers by primary injection method.Testing of winding temperarture oil temperature ,oil level indicator,backhauls relay,work includes cleaning and adjustment of relay contacts from remote /local closing tripping & protection trip command generated by primary injection. Note:- Contractor will provide two technicians on emergency fault at any substation at any timw ho shoul have knowledge of VCB wiring, 33 KV breaker wiring,transformer marshalling ,box wiring ,relay setting, energy meter wiring etc. | 69 | No | 9,999 ₹6,89,931 Lowest | 10,500 ₹7,24,500 | 10,100 ₹6,96,900 |
Tender Value
₹6.9 L
EMD Value
₹7,000
Closing Date
30 May 2026, 12:00 pmClosed
S.E. EDC GOLA
HYDEL COLONY,GOLA
08/EDCG/2026-27
2026_MVVNL_1152454_1
08/EDCG/2026-27
Open Tender
Miscellaneous Works
Item Wise
S.E. EDC GOLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
S.E. EDC GOLA
₹7,000
Yes
5 Jun 2026
23 May 2026
30 May 2026
23 May 2026
30 May 2026
23 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | fo|qr~ ijh{k.k [kaM xksyk ds {ks=kUrxZr fo|qr~ ç;ksx'kkyk xksyk]eksgEenh ,oa ify;k esa LFkkfir i‚oj ifjorZdks dh :Vhu VsfLVax ds dk;Z gsrq | - | - | - | - |
| 2 | (A) Testing of all power transformer including earth resistive test,open circuit test,short circuit test,magnetic balance test,voltage ratio (open circuit test at normal tap),magnetic balance test at normal tap,magger result test.Calibration of WTI & OTI,meffar result test ,oil testing .
(B) The 33/11 KV power transformer marshalling box and breakers by primary injection method.Testing of winding temperarture oil temperature ,oil level indicator,backhauls relay,work includes cleaning and adjustment of relay contacts from remote /local closing tripping & protection trip command generated by primary injection. Note:- Contractor will provide two technicians on emergency fault at any substation at any timw ho shoul have knowledge of VCB wiring, 33 KV breaker wiring,transformer marshalling ,box wiring ,relay setting, energy meter wiring etc. | 69 | No | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
BOQ_2158894.xls
BOQ • 0.25 MB
TENDER08.pdf
Tender Documents • 2.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .