Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 LRejected-AOC | ₹1.8 L | L2 | Rejected-AOC L2 |
Tender Value
₹1.7 L
EMD Value
₹4,000
Closing Date
1 May 2026, 5:00 pmClosed
Pawan Kumar
DIV Sonepat
Annual maintenance of sewerage Scheme in Sector - 14, U/E, Sonipat
2026_HBC_517640_1
20260B805A9F 27BE 4BAE 953E F472CFE0A7A7243HSV
Open Tender
Civil Works
90 days
Sonepat
2 documents required · 2 mandatory
₹250
₹4,000
Yes
8 Jun 2026
25 Apr 2026
4 May 2026
25 Apr 2026
1 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand) | - | P.Sqm | 139 | - |
| 2 | [11.52]Cement rendering on plaster 1 mm thick | - | P.Sqm | 28 | - |
| 3 | [21.93.3]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 3. Type:- Extra Heavy Duty Set (EHD-10) 560MM Clear Opening | - | Each | 772 | - |
| 4 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | - | P.Cum | 0.8 | - |
| 5 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform | 1 | P.Sqm | 208 | ₹207.79 |
| 6 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | - | P.Kg | 66 | - |
| 7 | [7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | 1 | P.Cum | 0.8 | ₹0.8 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_596510.xls
BOQ • 0.26 MB
AD0108881.pdf
Additional Documents • 0.14 MB
Download all tender documents and submit your bid