| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.9 CrAccepted-AOC 32 9 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹38.9 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹39.2 Cr+₹31.5 L (0.81%)Rejected-Finance | ₹39.2 Cr+₹31.5 L (0.81%) | L2 | Rejected-Finance Highest Rate Quoted by bidder |
| 3 | L3₹39.2 Cr+₹32.8 L (0.84%)Rejected-Finance 31 JANKI NAGAR KOTDWAR PAURI GARHWAL | KOTDWAR | PAURI GARHWAL | UTTARAKHAND | ₹39.2 Cr+₹32.8 L (0.84%) | L3 | Rejected-Finance Highest Rate Quoted by bidder |
| Sl No | Description | Qty | Unit | SHREEJIKRUPA BUILDCON LTD L2 | VKJ Projects Pvt. Ltd. L1 | rajesh goel thekedar L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. :All kinds of soil. | 7,226.86 | Cum | 146 ₹10,55,121.56 | 146 ₹10,55,121.56 | 140 ₹10,11,760.4 Lowest |
| 2.00 | Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil | 5,674.63 | Cum | 103 ₹5,84,486.89 | 104 ₹5,90,161.52 | 100 ₹5,67,463 Lowest |
| 3.00 | Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered): Depth exceeding 3 m but not exceeding 4.5 m. | 723.45 | sqm | 81 ₹58,599.45 | 80 ₹57,876 Lowest | 80 ₹57,876 Lowest |
| 4.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1,691.37 | Cum | 162 ₹2,74,001.94 | 161 ₹2,72,310.57 | 150 ₹2,53,705.5 Lowest |
| 5.00 | Disposal of Excavated earth/rock unserviceable, upto dumping zone near national highway distance upto 10 km from site. | 4,756.94 | Cum | 380 ₹18,07,637.2 | 363 ₹17,26,769.22 | 50 ₹2,37,847 Lowest |
| 6.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 400 | Cum | 5,600 ₹22,40,000 Lowest | 5,600 ₹22,40,000 Lowest | 5,600 ₹22,40,000 Lowest |
| 7.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 47.88 | Cum | 6,500 ₹3,11,220 | 6,490 ₹3,10,741.2 Lowest | 6,490 ₹3,10,741.2 Lowest |
| 8.00 | Basement Waterproofing - Providing and Fixing 1.2mm thick Sika Proof 312 HDPE SG Pre-applied fully bonded self-adhesive membrane with protective sand layer over PCC for waterproofing.
(HDPE based self adhesive fully bonded sheet membrane comprising of a virgin HDPE layer, coated with a high bond strength adhesive, covered by a weatherproof pro- tective sand sprinkled layer, for below ground water- proofing of reinforced concrete structures. It is loose laid onto prepared substrates or formwork before fixing reinforcement and casting concrete. The adhesive layer is activated when the concrete is poured on the surface and forms a permanent bond with the fresh concrete which will prevent the ingress of water around the structure. Reinforcement can be directly laid on top of the membrane and it does not require screed protection). | 800 | Sqm | 1,000 ₹8,00,000 Lowest | 1,000 ₹8,00,000 Lowest | 1,000 ₹8,00,000 Lowest |
| 9.00 | RCC Wall Waterproofing - Providing and applying water proofing treatment to exterior vertical surface of RCC Wall consisting with following operations.
1- Applying appropriate Sika primer @ 0.5 kg/sqm.
2- Fixing 1.5 mm thick SikaShield E50 HDPE SA bituminous, self-adhesive, fully bonded, post- applied, waterproofing sheet membrane with a thickness of 1.5 mm. consisting with cross-laminated HDPE film that is pre-coated with an SBS modified bitumen compound. | 300 | Sqm | 1,000 ₹3,00,000 | 940 ₹2,82,000 | 930 ₹2,79,000 Lowest |
| 10.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: All works upto plinth level, Concrete of M30 grade. | 1,863.65 | Cum | 8,000 ₹1,49,09,200 | 7,950 ₹1,48,16,017.5 Lowest | 8,250 ₹1,53,75,112.5 |
Tender Value
₹39.0 Cr
EMD Value
₹53.0 L
Closing Date
3 Jan 2026, 5:00 pmClosed
General Manager
Office of Chief General Manager, Construction Wing, Uttarakhand Peyjal Nigam, Kamla Nagar(Opp. ONGC Hospital), Dehradun
CONSTRUCTION OF TYPE-II HOUSING (BLOCK-B) FOR POLICE LINE RACECOURSE, DEHRADUN
2025_MDPEY_89992_1
5086/Nivida(Garh)D.Dun/91 Dt 15/12/2025
Open Tender
Civil Works
Item Rate
450 days
RACECOURSE
Please refer tender document
3 documents required · 3 mandatory
₹11,800
PM, Const.Unit, UKPJN, Dehradun
₹53.0 L
Dehradun
19 Jun 2026
17 Dec 2025
5 Jan 2026
17 Dec 2025
3 Jan 2026
26 Dec 2025
18 Dec 2025 - 23 Dec 2025
24 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. :All kinds of soil. | 7,226.86 | Cum | - | - |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil | 5,674.63 | Cum | - | - |
| 3 | Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered): Depth exceeding 3 m but not exceeding 4.5 m. | 723.45 | sqm | - | - |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1,691.37 | Cum | - | - |
| 5 | Disposal of Excavated earth/rock unserviceable, upto dumping zone near national highway distance upto 10 km from site. | 4,756.94 | Cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 400 | Cum | - | - |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 47.88 | Cum | - | - |
| 8 | Basement Waterproofing - Providing and Fixing 1.2mm thick Sika Proof 312 HDPE SG Pre-applied fully bonded self-adhesive membrane with protective sand layer over PCC for waterproofing.
(HDPE based self adhesive fully bonded sheet membrane comprising of a virgin HDPE layer, coated with a high bond strength adhesive, covered by a weatherproof pro- tective sand sprinkled layer, for below ground water- proofing of reinforced concrete structures. It is loose laid onto prepared substrates or formwork before fixing reinforcement and casting concrete. The adhesive layer is activated when the concrete is poured on the surface and forms a permanent bond with the fresh concrete which will prevent the ingress of water around the structure. Reinforcement can be directly laid on top of the membrane and it does not require screed protection). | 800 | Sqm | - | - |
| 9 | RCC Wall Waterproofing - Providing and applying water proofing treatment to exterior vertical surface of RCC Wall consisting with following operations.
1- Applying appropriate Sika primer @ 0.5 kg/sqm.
2- Fixing 1.5 mm thick SikaShield E50 HDPE SA bituminous, self-adhesive, fully bonded, post- applied, waterproofing sheet membrane with a thickness of 1.5 mm. consisting with cross-laminated HDPE film that is pre-coated with an SBS modified bitumen compound. | 300 | Sqm | - | - |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: All works upto plinth level, Concrete of M30 grade. | 1,863.65 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_106653.xls
BOQ • 0.59 MB
Tendoc_B.pdf
Tender Documents • 3.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .