Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr | L1 | Accepted-AOC accept |
| 2 | L2₹4.2 Cr+₹45.4 L (12.2%)Rejected-AOC SCO 36 SECTOR 7 C MADHYA MARG CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160019 | ₹4.2 Cr+₹45.4 L (12.2%) | L2 | Rejected-AOC reject |
| 3 | L3₹4.8 Cr+₹1.1 Cr (29.0%)Rejected-AOC | ₹4.8 Cr+₹1.1 Cr (29.0%) | L3 | Rejected-AOC reject |
| 4 | L4₹5.0 Cr+₹1.3 Cr (34.6%)Rejected-AOC | ₹5.0 Cr+₹1.3 Cr (34.6%) | L4 | Rejected-AOC reject |
| 5 | Not Admitted-Fee/PreQual/Technical 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.1 Cr
EMD Value
₹4.4 L
Closing Date
10 Apr 2023, 11:00 amClosed
EE
Jal Shakti Division Dehra
Operation and maintenance of scheme for 5 years
2023_HPIPH_71687_1
DHR-KNG02-728
Open Tender
Civil Works
Lump-sum
1825 days
Dehra
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,500
EE Dehra
₹4.4 L
Yes
10 May 2023
28 Mar 2023
10 Apr 2023
28 Mar 2023
10 Apr 2023
28 Mar 2023
Amount
Annual repair, maintenance and operation of water treatment plant i/c storage tanks and pump houses , rising mains/ distribution mains,pumping machinery including repair of Centrifugal/Submersible pumps & motors as per detail given below and its allied accessories and inclusive of replacement of all spare parts required for smooth running of scheme and providing adequate quantity of potable drinking water daily (without any kind of interruption ) to the population to be served under the scheme.
Ist year
2nd year
3rd year
4th year
5th year
Detail of main component of scheme:- Pumping Machinery
Booster stage 1st stage 2nd stage 3rd stage
Location of pump Intake in river Beas Slith Bhoran Chanalty Sidhpur kut Kashmir house
Pump make KSB KSB KSB KSB
Model KRTEE100-315/234UGIS MCPKGB65-315 WL100/04 WL100/06
Head in Mtrs 26.28 86.9 249.62 421.62
Discharge in LPS 24.73 24.73 24.73 24.73
BHP 2x28=56 HP 2x60=120 HP 2x150=300 HP 2x240=480 HP
Note:- In all stages one pump will act as stand bye and the pumping hours will be 16 hours.
Rising main: Operation and maintanance of rising main MSERW/ GI pipe
Booster stage 1st stage 2nd stage 3rd stage
Dia of pipe 200mm 200mm 200mm 200mm
Length in Rmt 75 1260 3690 3870
Distribution system
Dia of pipe 32 mm to 150mm
Length in Rmt 49690
Civil Work Capacity
Water treatment plant 1 No. 1.50 MLD
Intake structure 1 No
Pump house 3 Nos (62.95m2 each
Main storage tank 713000 Ltrs
Storage tanks 22500 to 950000 ltrs ( 22500 ltrs, 38000 Ltrs, 64000 Ltrs,68000 Ltrs, 225000 ltrs 713000 ltrs, 950000 ltrs)
Unipro Techno Infrastructure Pvt Ltd
HARJEET SINGH
M/s JAGDISH PRASAD AGARWAL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .