Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 Cr+₹95.3 L (59.2%)Admitted-Finance 5TH FLOOR KAILASH BUILDING 26 K G MARG CANAUGHT PLACE CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | ₹2.6 Cr+₹95.3 L (59.2%) | L2 | Admitted-Finance |
| 3 | L3₹2.7 Cr+₹1.1 Cr (67.9%)Admitted-Finance | ₹2.7 Cr+₹1.1 Cr (67.9%) | L3 | Admitted-Finance |
| 4 | L4₹2.7 Cr+₹1.1 Cr (69.9%)Admitted-Finance | ₹2.7 Cr+₹1.1 Cr (69.9%) | L4 | Admitted-Finance |
| 5 | L5₹3.8 Cr+₹2.2 Cr (135.4%)Admitted-Finance | ₹3.8 Cr+₹2.2 Cr (135.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NCPE Infrastructure India Private Limited L5 | The Nisarga Consultancy L4 | WAPCOS Limited L2 | BLG CONSTRUCTION SERVICES PRIVATE LIMITED L3 | ALPS ENGINEERS PMR ASSOCIATES L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Aalo | 1 | Nos | 24,75,000 ₹24,75,000 | 12,00,000 ₹12,00,000 | 13,25,000 ₹13,25,000 | 19,35,000 ₹19,35,000 | 10,00,000 ₹10,00,000 Lowest |
| 2.00 | Anini | 1 | Nos | 10,12,000 ₹10,12,000 | 8,00,000 ₹8,00,000 | 8,00,000 ₹8,00,000 | 5,93,400 ₹5,93,400 | 5,00,000 ₹5,00,000 Lowest |
| 3.00 | Basar | 1 | Nos | 11,74,250 ₹11,74,250 | 8,00,000 ₹8,00,000 | 9,00,000 ₹9,00,000 | 7,86,900 ₹7,86,900 | 5,00,000 ₹5,00,000 Lowest |
| 4.00 | Boleng | 1 | Nos | 10,12,000 ₹10,12,000 | 8,00,000 ₹8,00,000 | 8,00,000 ₹8,00,000 | 5,93,400 ₹5,93,400 | 5,00,000 ₹5,00,000 Lowest |
| 5.00 | Bomdila | 1 | Nos | 18,48,000 ₹18,48,000 | 10,00,000 ₹10,00,000 | 11,00,000 ₹11,00,000 | 12,38,400 ₹12,38,400 | 7,00,000 ₹7,00,000 Lowest |
| 6.00 | Changlang | 1 | Nos | 11,74,250 ₹11,74,250 | 8,00,000 ₹8,00,000 | 9,00,000 ₹9,00,000 | 7,86,900 ₹7,86,900 | 5,00,000 ₹5,00,000 Lowest |
| 7.00 | Daporijo | 1 | Nos | 19,47,000 ₹19,47,000 | 12,00,000 ₹12,00,000 | 12,00,000 ₹12,00,000 | 15,22,200 ₹15,22,200 | 7,00,000 ₹7,00,000 Lowest |
| 8.00 | Deomali | 1 | Nos | 13,66,750 ₹13,66,750 | 10,00,000 ₹10,00,000 | 10,00,000 ₹10,00,000 | 9,15,900 ₹9,15,900 | 5,00,000 ₹5,00,000 Lowest |
| 9.00 | Dirang | 1 | Nos | 11,74,250 ₹11,74,250 | 10,00,000 ₹10,00,000 | 9,00,000 ₹9,00,000 | 7,86,900 ₹7,86,900 | 5,00,000 ₹5,00,000 Lowest |
| 10.00 | Dumporijo | 1 | Nos | 10,12,000 ₹10,12,000 | 8,00,000 ₹8,00,000 | 8,00,000 ₹8,00,000 | 5,93,400 ₹5,93,400 | 5,00,000 ₹5,00,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹6.3 L
Closing Date
8 Feb 2024, 2:00 pmClosed
Director
O/o Director Directorate of Urban Local Bodies,Itanagar
Appointment of consultant for preparation of Detailed Project Report (DPR) and tender document for Used Water Treatment in various towns under Swachh Bharat Mission 2.0
2024_ULBAP_1604_1
NIT No. e-file computer No.160940
Open Tender
Consultancy
Empanelment
60 days
Itanagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
Director Urban Local Bodies Itanagar.
₹6.3 L
Yes
Itanagar
1 Mar 2024
25 Jan 2024
8 Feb 2024
25 Jan 2024
8 Feb 2024
25 Jan 2024
6 Feb 2024
Amount
Anini
Basar
Boleng
Bomdila
Changlang
Daporijo
Deomali
Dirang
Dumporijo
Hawai
Jairampur
Khonsa
Koloriang
Longding
Mariyang
Namsai
Palin
Pasighat
Roing
Sagalee
Seppa
Tawang
Yingkiong
WAPCOS Limited
BLG CONSTRUCTION SERVICES PRIVATE LIMITED
The Nisarga Consultancy
NCPE Infrastructure India Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .