| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | ₹7.9 L | L1 | Accepted-AOC lowest |
| 2 | L2₹9.4 LRejected-AOC | ₹9.4 L | L2 | Rejected-AOC second lowest |
| Sl No | Description | Qty | Unit | M BIJU L1 | K PRADEEP L2 |
|---|---|---|---|---|---|
| 1.00Appendix A | |||||
| 1.00 | OD250079/2025-2026:Hire and labour charge for a period of 7 days for putting up a Pandal up to 6m to12m wide hipped roof about 6.5m above ground level with 3rd class T.W poles 41cm to 52cm girth for central vertical and 1Vth class T.W poles for sides at 3m c/c and areca nut ridges and brussmens, providing rafters at 60cm c/c, runners at 1m c/c using bamboo poles, providing bamboo hips including tying all the materials using coir yarn and thatched with double coconut cad Jan including all labour charges for dismantling and removing the same after for function is over. | 730.5 | per sqm | 362.02 ₹2.6 L | 400 ₹2.9 L |
| 1.00 | OD250074/2025-2026:Cost of hiring and labor charges for 3 days to install mull cloth ceiling using thoroughly washed cloth, including the cost of hiring the cloth, labor charges for installation and removal, as well as loading, unloading, and transportation fees. | 1,161.25 | per sqm | 46.46 ₹53,951.68 | 60 ₹69,675 |
| 1.00 | OD250080/2025-2026:Lorry conveyance of materials (Mini lorry) such as wooden chairs, red blazer, carpet, flag post from PWD store, rest home, Durbar hall, Kanakakunnu Palace and return the same after the function is over. (with in 8km) | 6 | each | 1,393.8 ₹8,362.80 | 1,400 ₹8,400 |
| 1.00 | OD250073/2025-2026:Hire and labour for providing foldable plywood table of size 120*60 | 30 | each | 69.13 ₹2,073.90 | 75 ₹2,250 |
| 1.00 | OD250087/2025-2026:Hire charges for PVC chair for 3 days including arranging the
same as per the direction of Engineer in Charge. | 800 | each | 19.19 ₹15,352 | 25 ₹20,000 |
| 1.01 | OD250071/2025-2026:Hire and labour charges for 3 days for dias platform/vertical partition with 18mm marine
plywood or equivalent for raised platform for a height from 0.45 to 1.8 m and including cost of all labour
charges for fixing, dismantling charges, cost of materials, etc complete as per direction of
Engineer in charge (including frame work). | 77.76 | per sqm | 252.86 ₹19,662.39 | 275 ₹21,384 |
| 1.01 | OD250088/2025-2026:Supplying and stacking earth for filling the pit in ground. | 2.43 | cum | 371.68 ₹903.18 | 400 ₹972 |
| 1.01 | OD250084/2025-2026:Hire and labour for providing green arches of size 5.00x6.00m height or nearest size 60cm Pedestal using 4nos verticals for pedestals and horizontal tiles using 1/3 split Arecanut trees, tying all green chanayola to the frame out-side and mull cloth with red frills to the inside face etc including dismantling and removing the same after function is over. | 7 | each | 6,073.48 ₹42,514.36 | 6,100 ₹42,700 |
| 1.01 | OD250081/2025-2026:Hire and labour for supplying and tying coconut bunches. | 14 | each | 406.53 ₹5,691.42 | 450 ₹6,300 |
Tender Value
₹7.9 L
EMD Value
₹19,662
Closing Date
30 Dec 2025, 3:00 pmClosed
AEE
O/o the AEE, KLC Subdivision No.1, PWD, Tvpm
GENERAL Govt Secretariat Providing traditional marquee green arches flower showering and allied works in connection with the Republic day celebration 2026 at Central Stadium Republic day celebration 2026 at Central Stadium
2025_PWD_823555_1
DB1/PWD/BLDG/TR/23099/2025
Open Tender
Civil Works - Buildings
30 days
KLC, TVPM
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,735
₹19,662
6 Feb 2026
23 Dec 2025
1 Jan 2026
23 Dec 2025
30 Dec 2025
23 Dec 2025
Appendix A
OD250079/2025-2026:Hire and labour charge for a period of 7 days for putting up a Pandal up to 6m to12m wide hipped roof about 6.5m above ground level with 3rd class T.W poles 41cm to 52cm girth for central vertical and 1Vth class T.W poles for sides at 3m c/c and areca nut ridges and brussmens, providing rafters at 60cm c/c, runners at 1m c/c using bamboo poles, providing bamboo hips including tying all the materials using coir yarn and thatched with double coconut cad Jan including all labour charges for dismantling and removing the same after for function is over.
OD250074/2025-2026:Cost of hiring and labor charges for 3 days to install mull cloth ceiling using thoroughly washed cloth, including the cost of hiring the cloth, labor charges for installation and removal, as well as loading, unloading, and transportation fees.
OD250080/2025-2026:Lorry conveyance of materials (Mini lorry) such as wooden chairs, red blazer, carpet, flag post from PWD store, rest home, Durbar hall, Kanakakunnu Palace and return the same after the function is over. (with in 8km)
OD250073/2025-2026:Hire and labour for providing foldable plywood table of size 120*60
OD250087/2025-2026:Hire charges for PVC chair for 3 days including arranging the same as per the direction of Engineer in Charge.
OD250071/2025-2026:Hire and labour charges for 3 days for dias platform/vertical partition with 18mm marine plywood or equivalent for raised platform for a height from 0.45 to 1.8 m and including cost of all labour charges for fixing, dismantling charges, cost of materials, etc complete as per direction of Engineer in charge (including frame work).
OD250088/2025-2026:Supplying and stacking earth for filling the pit in ground.
OD250084/2025-2026:Hire and labour for providing green arches of size 5.00x6.00m height or nearest size 60cm Pedestal using 4nos verticals for pedestals and horizontal tiles using 1/3 split Arecanut trees, tying all green chanayola to the frame out-side and mull cloth with red frills to the inside face etc including dismantling and removing the same after function is over.
OD250081/2025-2026:Hire and labour for supplying and tying coconut bunches.
OD250083/2025-2026:Hire and labour for supplying and tying Plaintain with using fruits.
OD250070/2025-2026:Hire and labour for supplying and tying Green chanayola bundles.
OD250077/2025-2026:Hire and labour for providing fencing using good quality plastic coir in pavilion, around media stand etc and maintaining the same till the function is over.
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
OD250075/2025-2026:Supplying flower petals of different colourd marigold flower and filling gunny bags and conveying the same by vehicle to city-armed reserved camp for conducting anti-sabotage check to shower during unfurling of the national flag .
OD250078/2025-2026:Supply of fresh and good Flower arrangement in flower in floral foam/ flower vase/ in basket etc, cleaning and placing in position as per direction of departmental officers at site
OD250072/2025-2026:Hire and labour charges for providing a temporary sloped roof shed using a standard pattern GI pipe truss, connected to GI posts, positioned correctly, and secured to withstand wind pressure. This includes roofing with GI/PVC sheet, fixing with clamps or screws, and covering conveyance of all materials and labour charges. Including dismantling and removal of the shed after the function.
OD250076/2025-2026:null Hire charges for supplying and errecting painted bamboo poles with different colours on ground in pits and tying with ornamental coloured cloth flags at the tips including all hire charges, fixing and removing charges etc. complete as per the directions of departmental officers.
OD250085/2025-2026:Hire and labour charges for red/green/woolen/design carpet including all fixing/ spreading charges and removing after function for 3 days.
OD250082/2025-2026:Providing and dismantling after function arabian tent 3*3m size as specified by the engineering charge including all cost of materials labour charges etc. complete. For 3 days
OD250086/2025-2026:White washing with lime to give an even shade: Old work (one or more coats)
OD250182/2025-2026:Engaging Labour
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1380403.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1380403.xls
BOQ • 0.31 MB
viewnit.pdf
Tender Documents • 0.02 MB
viewsbd.pdf
Tender Documents • 1.63 MB
Affidavit.pdf
Tender Documents • 0.19 MB
Bidsubmissionletter.pdf
Tender Documents • 0.15 MB
GST.pdf
Tender Documents • 0.14 MB
integritypactcertificate.pdf
Tender Documents • 0.15 MB
license.pdf
Tender Documents • 0.18 MB
preagreement.pdf
Tender Documents • 0.09 MB
Requisitionforepayment.pdf
Tender Documents • 0.15 MB
Download all tender documents and submit your bid