Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder hence accepted | |
| 2 | L2₹12.7 L+₹2.6 L (25.7%)Rejected-AOC | L2 | Rejected-AOC second lowest bidder, hence rejected | |
| 3 | L3₹12.8 L+₹2.6 L (26.0%)Rejected-AOC | L3 | Rejected-AOC Third lowest bidder hence rejected |
Tender Value
₹11.6 L
EMD Value
₹29,113
Closing Date
31 Oct 2022, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer,Chimoni Dam Project Sub Division, Echippara
GENERAL-CDP-Constructing and maintaining Vasupuram chira for the year 2022-23-General Civil Work
2022_Irrig_519147_1
IRR/IA/TR/688/2022_5_2_1/2
Open Tender
Civil Works - Others
Item Rate
300 days
Vsupuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹29,113
Yes
6 Dec 2022
21 Oct 2022
4 Nov 2022
21 Oct 2022
31 Oct 2022
21 Oct 2022
Amount
Construction of Chira
OD1098/2022-2023:Supplying and laying Earth / Sand-filled cement bags to lines and levels including the cost of cement bag, labour charges for filling, tying, laying in position, all leads and lifts and other incidental charges etc. complete as directed by the departmental officers at the site
60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
OD1099/2022-2023:Removing the earthen bund in or underwater including disposal of debris with all lead and lift etc. complete as directed by the departmental officers at the site
OD1686/2022-2023:Engaging Beldar for various works like removal of debris and cleaning etc. Complete
OD1100/2022-2023:Hire charges of hydraulic excavator for removing rubble boulders and accumulated debris near the chira including operator and fuel etc complete.
Maintenance of Chira
OD1101/2022-2023:Watching and maintaining the Chira in good condition and removal of obstructions at the vent upstream of the Chira etc. till the end of the period or till the chira is breached due to flood in monsoon whichever is earlier etc. complete as directed by the departmental officers.
John M.K
M K Joseph
Bidder Name
M K Joseph
John M.K
JIJO NG
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_745507.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .