Loading…
Loading…
Tender Value
₹4.3 L
EMD Value
₹10,700
Closing Date
28 Apr 2026, 5:00 pmClosed
Executive Officer
MC Nahan Distt. Sirmour HP 173001
Restoration of drain from Residence of Shri Suresh Joshi to Lakhdata Pir.
2026_UDDHP_134902_1
J.E.MCN/2026- 795 Job No 8
Open Tender
Civil Works
90 days
Nahan
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Executive Officer
₹10,700
Yes
22 Apr 2026
22 Apr 2026
30 Apr 2026
22 Apr 2026
28 Apr 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Excavation work by mechanical means (Hydraulic excavator) / manual means in foundationtrenches or drains ( Not exceeding 1.50 meter in width or 10 square metres on plan ), including dressing of sides & ramming of bottoms, all lifts, shifting of interlock tiles to MC Office, including getting out the excavated soil & dispiosal of surplus excavated soil as directed, within all lead of Ordinary rock, including all leads,lifts & carriage of materials and shifting ( As per code No. 2.9.1 page 65 ) . | - | Per cubic meter | - | - | BI01010001010000000000000515BI0100001113 | |
Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 ( One cement : two corase sand : four graded stone aggregate 20 mm nominal size) ( As per code No. 4.1.3 Page 73 ) . | - | Per Cubic Meter | - | - | BI01010001010000000000000515BI0100001114 | |
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) | - | Per Cubic metre | - | - | BI01010001010000000000000515BI0100001115 | |
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position & binding all complete upto all floor level Thermo-Mechanically Treated bars of grade Fe-500 D or more, including all leads,lifts & carriage of materials & to the entire satisfaction of the Engineer-in-Charge ( As per code No. 5.22.6 page 84 ) . | - | Per Kilogram | - | - | BI01010001010000000000000515BI0100001116 | |
Centring & shuttering including strutting, propping etc. & removal of form work for :- | - | - | - | - | BI01010001010000000000000515BI0100001118 | |
Suspended floors, roofs, landings, balconies & access platform, including all leads, lifts & carriage of materials & to the entire satisfaction of the Engineer-in-Charge ( As per code No. 5.9.3 Page 80 ) . | - | squre meters | - | - | BI01010001010000000000000515BI0100001119 | |
Walls (any thickness) including attached pilasters, buttresses, plinth & string courses etc. including all leads, lifts & carraiage of materials & to the entire satisfaction of the Engineer-in-Charge .( As per code No. 5.9.2 Page 80 ) . | - | Per Square metres | - | - | BI01010001010000000000000515BI0100001120 | |
Steel work welded in built up sections,trusses and framed work,including cutting ,hoisting ,fixing in position and applying a priming coat of red lead paint. In gratings framed guard bars,ladders,railling,brackets and similar works. | - | Per Quintal | - | - | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
NIT.pdf
Tender Documents • 1.24 MB
BOQ_199619.xls
BOQ • 0.32 MB
TandC.pdf
Additional Documents • 0.40 MB
Download all tender documents and submit your bid