Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance JANTA PRESS GALIAGRAWAL LODGE ROAD MANENDRAGARH CHHATTISGARH 497 442 | MANENDRAGARH | MANENDRAGARH CHIRMIRI BHARATPUR | CHHATTISGARH | 497442 | -19.99% | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹30.6 L (17.6%)Admitted-Finance 10 1 JAMIR LANE BALLYGUNGE KOLKATA 700019 | KOLKATA | KOLKATA | WEST BENGAL | 700019 | -5.89% | ₹2.0 Cr+₹30.6 L (17.6%) | L2 | Admitted-Finance |
Tender Value
₹2.2 Cr
EMD Value
₹4.3 L
Closing Date
15 Jun 2026, 3:00 pmClosed
SE ATTACHED TO CE SOUTH
Office of the Chief Engineer, South, Jalasampad Bhavan, Salt Lake City, Kolkata, PIN-700 091
Resuscitation of Nandarampur-Santoshpur Suti Khal for a length of 4440 M including necessary protection work within Chingripota Gram Panchayet and Uttar Raypur Gram panchayat of Block Budge Budge- I, P.S.-Budge Budge, Dist. South 24 Parganas.
2026_IWD_1024182_3
WBIW/SE/CE(S)/NIT-01e/2026-27
Open Tender
CIVIL WORKS
Percentage
300 days
Block-Budge Budge-I
AS DEPICTED IN THE NIT
7 documents required · 7 mandatory
₹4.3 L
Yes
3 Jul 2026
15 May 2026
16 Jun 2026
15 May 2026
15 Jun 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation or re-excavation of drainage channels / rivers in all kinds of soil including silt, sand, slush etc. mixed with all sorts of Industrial wastes, sewages, municipal garbage, carcasses, tannery effluents, jungles, bushes, semi-solid / solid campact mass, water hyacinth, cowdung deposits, decomposed vegetations, polythenes, brick bats, gravels, stone ballast, crates, remnant of bullah and bamboo pins etc. by means of suitable excavator mounted on pontoon (min. depth of water 0.75 metre) specially made to suit the site condition in tidal or non-tidal channel / river and carrying of the excavated materials to suitable locations of the channel / river bank from the point of excavation by diesel machine operated boats or similar arrangements in a manner suited for the purpose and placing the excavated materials from the boat etc. on the top of the bank in case of disposal at suitable places arranged by the agency at his own cost, on the bank at available locations having distances from the point of re- excavation as shown below, by means of excavators or any other machines or manually as may be required, including all lifts.. Measurement : By Pre-work and Post- work level sections. Pre-work level for the existing bed of the channel / river is to be taken by displacing water hyacinth and all other floating materials including compact masses, carcasses etc. and for which no extra payment will be made. Post-work level section will be taken only when a stretch of at least 300 metre is completed and the said post-work will be taken within 7 days after completion of excavation in that reach. Note- The cost for the above work includes the cost of hire charges of excavator including all accessories, excavators, diesel machine operated boats, pontoons etc. and including the cost for mobilisation, demobilisation, maintenance, cost of fuel and lubricants, wages of operators and labours and all other incidental charges as may be necessary for the above work and the rate also includes the charges of dismantling and re-erection of machine excavator, pontoon etc., if necessary, in the interest of work or for passing of the machines etc.below the bridges.
(a) For distance 0 to 50 metre from the point of re-excavation to the placing point on the bank.
Show Less | 3,336.63 | Cum | 202.61 | ₹6,76,034.6 |
| 2 | Earthwork in re-excavation / silt clearance in drainage channel in all kinds of soil including sludge, slush mixed with all sorts of industrial wastes and municipal garbages, polypacks, carcasses, small khatal effluents, night soil etc. by mathor labour as may be necessary and depositing the same in places as directed by the Engineer-in-charge , in such a manner, without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and rough dressing when dry including making arrangement of bailing out of any seepage water and removal of sand or soil blown from underneath, removal of khatal, temporary latrines, clearing and removing all kinds of semi compact masses formed by water hyacinth, jungles up to 30 cm girth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering as required, nicking out lines etc. (Measurement : By Pre-work and Post-work level section. Pre-work level for the existing bed of the channel/river is to be taken by displacing water hyacinth and all other floating materials including compact masses, carcasses etc. and for which no extra payment will be made. Post work level section will be taken only when a stretch of at least 300mt. is completed and the said post work will be taken within 7 days after completion of excavation in that reach.
For distances beyond 50mt. but within 100 mt. from the point of re-excavation to the placing point on the bank.
Note-The cost for the above work includes the cost of hire charges of excavator including all accessories, excavators, diesel machine operated boats, pontoons etc. and including the cost for mobilisation, demobilisation, maintenance, cost of fuel and lubricants, wages of operators and labours and all other incidental charges as may be necessary for the above work and the rate also includes the charges of dismantling and re-erection of machine excavator, pontoon etc., if necessary, in the interest of work or for passing of the machines etc.below the bridges. | 2,224.42 | Cum | 207.37 | ₹4,61,277.98 |
| 3 | Earthwork in re-excavation / silt clearance in drainage channel in all kinds of soil including sludge, slush mixed with all sorts of industrial wastes and municipal garbages, polypacks, carcasses, small khatal effluents, night soil etc. by mathor labour as may be necessary and depositing the same in places as directed by the Engineer-in-charge , in such a manner, without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and rough dressing when dry including making arrangement of bailing out of any seepage water and removal of sand or soil blown from underneath, removal of khatal, temporary latrines, clearing and removing all kinds of semi compact masses formed by water hyacinth, jungles up to 30 cm girth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering as required, nicking out lines etc. (Measurement : Pre-work and Post-work level section. Pre- work section to be taken after removal of water hyacinth and all other floating materials etc.) By manual means within an initial lead of 30 M and an initial lift of 1.5 M | 28,552.38 | Cum | 174 | ₹49,68,114.12 |
| 4 | Extra rate for additional lead of earthwork in item No. 3 above.
Each additional lead of 15 M or part thereof beyond 30 M up to 90 M | 14,276.19 | Cum | 13.11 | ₹1,87,160.85 |
| 5 | Disposal / carriage of excavated earth / materials outside Government land by truck or by any other conveyance over kancha / pucca road including making access for plying the truck or any other conveyance beyond 300 m and upto a distance of 5.00 Km. from the excavated point including cost of stacking, loading, unloading, transporting, arrangement of land, if required by agency, spreading and levelling as necessary etc. complete. Measurement : By stacks at loading point after deducting voids as per rule. (This item can only be used after obtaining permission from the concerned Superintending Engineer). | 13,645.37 | Cum | 139.44 | ₹19,02,710.39 |
| 6 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
15 cm av. Diameter | 26,400 | Metre | 258.62 | ₹68,27,568 |
| 7 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
15 cm av. Diameter | 21,120 | Metre | 125.14 | ₹26,42,956.8 |
| 8 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
Width of thinner end above 10 cm. and less than 15 cm.
Jhaw / Eucalyptus. | 2,200 | Metre | 123.95 | ₹2,72,690 |
| 9 | Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge
b) Two coats | 12,999.8 | Sqm | 65.55 | ₹8,52,136.89 |
| 10 | Fitting, fixing bitumen drum sheet to bullah piling and wailing pieces including cutting straightening drum sheet fixing with country nails @ 20cm c/c at top & bottom and bolts& nuts at top & bottom at every joint of drum sheet with a laping of 15 cm, including supply of drum sheet, fixture all complete as per direction of the Engineer - in - charge. | 1,100 | Sqm | 520.82 | ₹5,72,902 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tendernotice_2.pdf
PDF • 0.44 MB
Tendernotice_3.pdf
PDF • 0.14 MB
Tendernotice_4.pdf
PDF • 1.14 MB
Tendernotice_5.pdf
PDF • 2.76 MB
BOQ_2517100.xls
BOQ • 0.42 MB
Corrigendum_01.pdf
PDF • 0.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .