Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
26 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.Minicipal Commissioner - West Zone
Diversion of drainage line into the existing stormwater line from Chandkheda Bus Stand to Visat Circle in Chandkheda Ward (West Zone), including ancillary works and CCTV-assisted cleaning of the said line.(ARC)
367573
3/26-27 (T.N. 102)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹3,600
Municipal Commissioner, Ahmedabad
₹1.2 L
23 Nov 2026
23 Nov 2026
23 Nov 2026
26 Nov 2026
23 Nov 2026
120 days
Volume- I Technical Bid
DATE OF Dt. 26.11.2026 Up to
TENDER DOCUMENT ONLINE. .
Last of Date of Submission of
Tender Fees,EMD & Other
- Dt.27.11.2026 Upto
documents in hard copy at AMC
office by Speed Post or hours.
Registered Post AD or Courier
Date of Tender Opening at 15.00 hours
TENDER DOCUMENTS
SECTION DESCRIPTION PAGE
A MEMORENDOM OF THE WORK
A1 SPECIAL CONDITIONS OF CONTRACT
A2 INSTRUCTIONS TO BIDDERS (ITB)
B GENERAL CONDITIONS OF CONTRACT
B1 CONDITIONS OF PARTICULAR APPLICATION
B2 TERMS & CONDITIONS OF CONTRACT
B3 ADDITIONAL GENERAL CONDITIONS
D TECHNICAL SPECIFICATIONS
Annexure-1:- The division bench of Gujarat HC had on June
2006, come up with comprehensive guidelines for
Manchinhole workers.
Annexure-2:- Supreme Court`s Giudelines (Source : SC's lays
down rules for Manchinhole cleaning India
Environment Portal)
AHMEDABAD MUNICIPAL CORPORATION
MEMORENDOM OF THE WORK
Repairing work :- Diversion of drainage line into the existing stormwater line from Chandkheda
Bus Stand to Visat Circle in Chandkheda Ward (West Zone), including ancillary works and
CCTV-assisted cleaning of the said line.(ARC)
AMC reserves the right to allot the work to the bidder as per his capability considering his
work on hand in AMC, Gujarat state and other states in India, work in Progress , and
spare vehicles for future works.
Bidder shall note that all instructions and conditions given in this memorandum shall be in
conjunction with general condition of contract and all terms and conditions stated in
1 Time Limit 12 Months from start of the work excluding monsoon.
Bidder who wants to apply for more than one tender in
AMC during this period, he shall have to start the work
simultaneously deploying more machinery and shall have
to complete the work within specified time limit.
2 Estimated Amount Rs.1,20,00,000.00
3 Earnest Money Deposit Bidder shall submit separate EMD for proposal.
Rs.1,20,000/- , EMD shall be in form of Demand Draft or
pay order in favour of Municipal Commissioner,
Ahmedabad / Bank Guarantee to be submitted as
prescribed in 5.0 below. Demand Draft or Bank
Guarantee shall be from Nationalized Bank and approved
banks by A.M.C as described in Annexure-I and valid
4 Tender fee Rs.3600.00 DD shall be in form of Demand Draft in
(Non refundable) favour of Municipal Commissioner, Ahmedabad.
Submission of EMD. Tender fee and other Documents
5 Submission of EMD and
during office hours: On date. 27.11.2026 & 12:00 Hrs
Tender Fees West Zone, 2nd Floor, A.M. Office, Stadium Sub Zonal Office,
Nr. Panchshil Water Tank, Naranpura Railway Crossing Ahmedabad
6 Tenders download date Tenders documents can be downloaded from the
www.nprocure.com.
7 Last date of online Online submission shall be on Dt. 27.11.2026 up to
submission of Tenders. 18.00hours only. The tenders received after this date
and time will not be entertained under any circumstances.
8 Last date of submission Physical tender documents with EMD and Tender fee
of Physical documents without price bid can be submitted up to Dt.27.11.2026
for the Tenders. up to 12.00hours.
Dt. 27.11.2026 up to 15.00 hrs at Add.City engineer
9 Date of Opening of
(WEST ZONE), West Zone Stadium Sub Zonal Office,
Nr. Panchshil Water Tank, Naranpura Railway
Crossing Ahmedabad
10 Mode of sending the Document shall be submitted in sealed envelope systems
Tender Documents By RPAD / Speed post / Courier in sealed covers as
described in submission of the tender.
11 Terms, Condition, & All general condition of contract of form B1 condition of
Specification contract shall be applicable.
12 Solvency Certificate Solvency certificate for an amount up to 20% of the
tender amount plus the amount of works on hand still to
be executed by him. A solvency certificate to this effect
shall be submitted by him from any Nationalized bank.
13 Security Deposit: 5% of Tender Amount in form DD or Bank Guarantee of
Approved banks from Ahmedabada Branch.
14 Retention Retention @ 2% of the value of work done will be
deducted from each RA bill. It will be released along with
release of payment of Final Bill.
15 Mode of physical By online RPAD / Speed Post / Courier.
documents submission
16 Tender validity period 120 days from the date of opening of price bid
17 Compensation for delay If the Contractor fails to complete the work under contract
by contractor by the stipulated date, he shall pay liquidated damages of
10% amount of the balance work after date of completion
stipulated in the tender.
18 Water, Electricity Contractor shall have to make his own arrangements for
water and electricity for the purpose of construction work
at site at his own expense.
19 Municipal Commissioner reserves the rights to reduce / increase the scope of work
and contract without assigning any reason thereof.
20 Employer reserves the right to accept the tender of more than one bidder
with lowest approved rate and also reserves the right to give the work order to
more than one bidder with same approved rate of the lowest bidder. Any bidder of
lowest quoted rate cannot claim for his solely qualified tender.
21 No price escalation shall be paid / recovered for the works mentioned in the
22 No advance for machinery or materials will be given.
23 Mobilization advance will not be given.
24 Conditional tenders will not be accepted
25 dwsht< mhfth ©b, ftiNÕg rJftm ylu htusdth rJCtd XhtJ ¢btkf : LED/WRT/e-file/11/2024/0293/M2
mraJtjg, dtk^eldh, <t.15.02.2024btk mbtrJÐ Nh<tulwk cezh©e yu vtjl fhJtlwk hnuNu.
26 GST :-GSTwillbepaidextrabyAMC/Authorityatprevailingrateto
Interested bidders shall download the tender documents from www.nprocure.com
website and submit it online. He shall also submit hard copy of tender documents with
stipulated tender fee and EMD without price bid in the office of Asst. Manager, admin.
Department, West Zone Office Usmanpura, Ahmedabad Municipal Corporation,
Technical bids will be opened in the office of Add.City engineer (WEST ZONE)
office,USMANPURA, Ahmedabad Municipal Corporation, Ahmedabad. in the presence of
bidders or their representatives who choose to attend. In the event of the specified date
of bid submission/opening being declared a holiday for the Employer, the bids shall be
received /opened on the next working day at the same place and the same time.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Section A1 – SPECIAL CONDITIONS OF CONTRACT
1. This tender is invited for contract. Contractor shall have to execute the work in all
zones simultaneously.He shall have to start the work within the day of instructions
given from the engineer.
2. AMC will have to give the instruction to start the work all together for more than
one places in different Area. He should have minimum machinery stated in
eligibility criteria.
3. The Bill of Quantities shall be reading conjunction with the Instruction to Bidders,
Conditions of Contract, Technical Specifications.
4. The bidder must have visited and examined the area of the Works and its
surroundings and obtained all data and it is his own responsibility. All
information that may be necessary for preparing the bid and entering into a
contract for this type of Works. The costs of visiting the site shall be at the
bidder's own expense.
5. Bidder must have knowledge of existing sewage flow quantity or he must have got
data of sewage flow quantity in the sewerage trunk main lines or Branch sewer
lines and he must have aware of required pumping for diversion of the existing
Bidder shall have to maintain flow level in all Manchinhole of upstream line during
diversion of flow by proper pumping system. In this regard bidder shall have to
divert the flow in same line by alternate Manchinhole distance if there is no
extra line and he shall not raise any issue of extra line for diversion of the
6. The bidder and any of its personnel or agents will be granted permission by the
Employer to enter its premises and lands for the purpose of such inspection, but
only upon the express condition that the bidder, its personnel and agents, will
release and indemnify the Employer and its personnel and agents from and
against all liability in respect thereof and will be responsible for death or personal
injury, loss of or damage to property and any other loss, damage, costs and
expenses incurred as a result of the inspection.
7. No claim in future for unknown with the site by the bidder shall be granted in
8. AMC may execute any item of the BOQ too less or too more in any occasion.
Therefore bidder shall not raise any claim for non executing item or too more
executing items or too less executing item.
9. The basis of payment will be the actual quantities of work executed and carried
out, as measured by the Contractor and verified by the Engineer and valued at the
rates and prices bid in the priced Bill of Quantities, where applicable, and
otherwise at such rates and prices as the Engineer may fix within the terms of the
Contract. Contractor shall not raise any claim for too less or too more
quantities executed by him. Quantity may vary with respect to BOQ as well
as place of work also may change cited in the tender.
10. The rates and prices Bid in the priced Bill of Quantities, except in so far as it is
otherwise, provided under the Contract, include all constructional plant, labour,
supervisions, materials, all temporary works and false works, erection,
maintenance, establishment and overhead charges, profit, any taxation and levies,
octroi and other charges together with all general risks, liabilities and obligations
set out or implied in the Contract and including remedy of any defects during the
Defects Liability Period.
11. Bidder is requested to fill rate on total cost of the BOQ considering the
AMC shall evaluate bidders capability to work considering work on hand
and work in progress in all parts of India. AMC shall evaluate bidder`s
capability of doing the work considering working progress and response to
the instructions delivered from AMC engineers and authority to him. Bidding
capacity shall be considered applying general formula.
(Note: If any quarry in this clause bidder shall clarify / may contact before entering
in to the contract.)
12. Contractor shall fill percentage rate on amount of BOQ. Items other than in the
BOQ will be paid for by the Employer on actual measurement (preferably current
SOR of any organization) onsite if executed.
13. Employer reserves the right to accept the tender of more than one bidder
with lowest approved rate and also reserves the right to give the work order to
more than one bidder with same approved rate of the lowest bidder. Any bidder of
lowest quoted rate cannot claim for his solely qualified tender.
14. The contractor should have to attend the breakdown if any as early as possible
and should have to complete the work without unavoidable delay.
15. Contractor shall have to provide experienced operator and workers on hiring of
super sucker on shift bases..
16. Payment shall be given within 15 days on the raise of monthly bill.
17. In case of Accident or death of Employer’s of Contractor or third party, A.M.C. will
not be Responsible in any manner / Manners.
18. In case of damage of machines due to Accident, AMC will not be responsible.
19. In any case, contractor is not allowed to work inside the Manchinhole or sewer
20. The operator and workers shall be Contractor’s employees. Corporation staff(
Technical .Supervisor / Engineers) will show only the site where the work is to be
21. Contractor shall not raise any claim for too less or too more quantities executed by
him. Quantity may vary with respect to BOQ as well as place of work also may
change cited in the tender.AMC will execute this contract subject to availability of
the fund. If, fund is not available then AMC may cancel this tender. Contractor shall
not raise any claim in future for this.
22. Payment will be made after getting satisfactory working report from the user
23. AMC may at its discretion no coplains/no work for a period, single or multiple works
at any given time. once the work is given by SMS, Phonecalls, Whatsapp, Letter;
the contractor has to attend the work within 24 hours. Failure of the same shall
invite penalty of 10,000/- per occurance. Repeated failure of more than 3 times, the
contractor shall be blacklisted. No further claim shall be entertained and the work
shall be carried out of current market rate and supervision charges of 27% at the
risk and cost of contractor after the due date of intimation.
24. Contractor has to provide more than one Number of gangs as per the works alloted
and in case of non providing of gangs and machinery at all sites at any given time
shall be treated as delayed by contractor and penalty shall be leived on per day
delay as mentioned below (the amount shall be as instructed earlier based on the
25. All Bidders follow all terms & conditions as per Gujarat sarkr shram, kaushaly vikas
nd rojgar vibhag reso. LED / WRT/e-file/11/2024/0293/M2 Sachivalay,
Gandhinagar D: 15.02.2024
Seal and Signature of the Bidder Add.City Engineer
Date: Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Section A 2 – INSTRUCTIONS TO BIDDERS (ITB)
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation here in after called "the Employer" invites
bids for the construction of works (as defined in these documents, hereinafter
referred to as "the Works") detailed in the table given in the IFB.
1.2 The Works consist of:
Temporary or permanent plugging in the running sewer/ storm drain to divert
the flow to existing another line passing nearby.
Removing debris / silt from existing storm water drain pipeline by Mechanical
equipment like super sucker with jetting machine
Commissioning the Pipeline of the Size cited in the BOQ with Clean/ Sewage
Construction of new Manchinhole on existing line with brick massionary or RCC
Repairing / Raising existing damaged Manchinholes and any Structures
carrying sewage flow
Maintaining Environmental measures with help of mechanical / any type of
equipment for the public as well as workers.
Providing Safety Measures for the workers as well as public passing around the
1.3 The scope of work shall consist of full comprehensive operation and maintenance of
above equipment including supply of all type of consumable and spares, Diesel and
Engine oil and shall include the following services.
1.4 Provide Services of two supervisor, two mechanic for all machines, one driver cum
operator, one skilled and four unskilled labours per unit including Technical back up
Support of Engineer/Technician as per requirements. The sanitary staff for handling
the suction hose and Jetting hose shall also be provided as actual required onsite for
ease & effective out put of machine at his own cost.
1.5 Routine maintenance and servicing of machine including replacement of filters for
hydraulic oil, engine oil etc as & when required.
1.6 Provide consumables such as lubricants, hydraulic oil, oil for compressor, filters,
jetting hose, suction hoses diesel and engine oil etc as & when required.
1.7 All Minor and major repairs of machine including spares as per requirement.
1.8 Payment of road tax and insurance of the equipment to cover unforeseen events like
theft, accident ,fire, riots, earthquake etc.
1.9 Contractor has to maintain all records regarding weight of disilting material/operation
and no. of trips and time required empting the same.
1.10 Record to be submitted on day to day basis to Asst.C.E. as demanded & as
suggested in the format by AMC.
1.11 De-silting work must be carried out by super sucker machine only (vacuum system).
1.12 The works under this Contract shall be carried out in accordance with the bidding
documents constituting the contract and shall consist of various salient items as
generally described in the tender document:
1.13 Bidder shall note that AMC may cancel the work at any stage of the contract. AMC
can terminate the contract incase of curtailment of the scope of the work. Contractor
will not be entitled to raise any claim regarding curtailment of the scope of the work.
2. Source of Funds
2.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
3. Eligibility criteria for Bidders
This invitation for bids is open to bidders who meet the following
3.1 A bidder shall have similar type experience of the work in any Govt., Semi-Govt. or
ULBs of any such organisation with the latest de-silting equipment and undertaken
as per Supreme Court/ High Court Guidelines / Direction of Govt. G.R.
3.2 Bidder should have registered his class in Ahmedabad Municipal Corporation
within six months after allocation of the work.
3.3 Bidder shall have completed
(i) one similar work costing 80% of the Package cost or more, OR
(ii) two similar work costing 60% of the package cost or more OR
(iii)Three similar work costing 40% of the package cost or more in last Seven
For the purpose of this clause, pipe de-silting/ cleaning with the help of vacuum
technology shall be considered for 'similar works' for this special task.
3.4 Bidder shall have experience of De-silting of sewer diameter 300 to 1800 mm
and RCC Duct of any size or above in India in last 7 years (ending on the date of
opening of this bid) in any Municipal Corporation or in any Government organization
or any such body with satisfactory certification of client.
3.5 Joint venture is not allowed for the work.
3.6 Bidders shall provide such evidence of their continued eligibility that is satisfactory to
the Employer, as the Employer shall reasonably request.
3.7 Bidders must own 3 number high capacity vacuum machine and 4 number silt
carrying pay loader for inch package tender. Bidders name should be there in RTO
registration copy (RC Book) in the case of ownership of the machine.
3.8 Bidder shall submit commitments on stamp paper of 100 Rs. for provision of
machinery required (as stated in clause no. 3.7 and above)
3.9 Bidder must own 1 number minimum four wheeler colour CCTV system (with
sewage flow) with camera having optical zoom with pan and tilt 360 degree in all
three axis, which shall be controlled from outside of the sewer Manchinhole.
3.10 Bidder shall have to submit completion certificate of effective and efficient
workmanship from the organisations cited above.
3.11 At the Employer's request, the bidder having offered the lowest evaluated financial
bid may be required to provide evidence of the origin of materials, equipment and
services to the satisfaction of the Employer at the time of evaluation of the technical
3.12 Bidders must provide certificates of training of their staff, which are on their payroll at
the time of evaluation of the technical bid.
3.13 Bidder must submit Methodology for the work in respect of Honourable Gujarat High
court as well as Supreme Court order of cases related to death of labour working de-
silting of the sewer line.
3.14 Bidder shall have to submit affidavit stating that work shall be carried out by
mechanized vacuum technology ( by super sucker machine) ,all labour shall not
enter in Manchinhole or pipeline and Contractor shall be solely responsible incase of
any accident will occur.
3.15 The contractor shall have posses such type of O & M operation experience with
Govt./Semi Govt. sectors preferably. Bidder must have prior experience of carrying
out Operation & Maintenance of minimum 5-years with any Civic Body.
3.16 Contractor must be registered with labour laws Act. They shall have to Act and obey
as per govt. rules and regulations.
3.17 Biding Capacity shall be assessed applying the formulae-
Available Bid Capacity = (2AN – B),
A = Maximum value of sum of all the contracts executed in any one year
during last three years (updated to the current price level) which will take
into account the completed as well as work in progress:
B = Value of the existing commitments and on-going works to be
completed during the next two years and
N = Number of years prescribed for completion of the works for which the
bids are invited.
Note : The statements showing the value of existing commitments and on
going works as well as the stipulated period of completion remaining for
each of the works listed should be countersigned by the Engineer-in-charge,
of the firm or the relevant division/department of the firm, not below the rank
of Manager / Chief Engineer / Executive Engineer.
4. Qualification of the Bidder
4.1 To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit
the bidder; and
b) Have adequate experience, financial capacity, adequate available bid capacity and
technical capability to undertake the Contract. Confirmation of these matters may
involve the updating, verification and reassessment of information, which may
previously have been considered during pre qualification.
c) The bidder shall submit the following information (Form1 of General Information)
on eligibility and qualification duly updated including any changes since pre
qualification:-
General information
All individual firms must complete the information in this form. Nationality information shall
be provided for all owner(s) or applicant(s) that are partnership or individually owned
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone/ Contact:
5 E-mail address:
6 Place of incorporation/registration:
7. Year of incorporation/registration:
current contract commitments/works in progress
financial data
Additional information regarding litigation, debarment, arbitration, etc.
d) Submit proposed methodology in sufficient detail and programme of
construction backed with equipment planning and deployment duly supported
with broad output calculation and quality assurance procedures proposed to be
adopted justifying the adequacy of the bidder’s proposal to meet the technical
specification and the completion of work within the stipulated period of
4.2 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be
disqualified for any of the following reasons:
a) Misleading or false representation in the forms, statements and attachments
b) Record of poor performance such as abandoning the work, rescinding of
contract for which the reasons are attributable to the non-performance of the
contractor, consistent history of litigation awarded against the applicant or
financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of
ongoing AMC works.
4.3 Debarment / Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the
bidder(s) for their misleading or false representations in the forms statements etc.
for the period to be decided by the Employer.
5. One Bid per Bidder
5.1 Each bidder shall submit only one bid per contract package either by himself. A
bidder who submits or participates in more than one bid for a contract package will
be disqualified.
6. Cost of Bidding
6.1 The bidder shall bear all costs associated with the preparation and submission of his
bid and the Employer will in no case be responsible or liable for those costs.
7.1 The bidder must have visited and examined the area of the Works and its
surroundings and obtained all data and it is his own responsibility. All information
that may be necessary for preparing the bid and entering into a contract for this type
of Works. The costs of visiting the Site shall be at the bidder's own expense.
7.2 Bidder must have knowledge of existing sewage flow quantity or he must have got
data of sewage flow quantity in the sewerage trunk main lines or Branch sewer lines
and he must have aware of required pumping for diversion of the existing flow.
Bidder shall have to maintain flow level in all Manchinhole of upstream line during
diversion of flow by proper pumping system. In this regard bidder shall have to divert
the flow in same line by alternate Manchinhole distance if there is no extra line and
he shall not raise any issue of extra line for diversion of the flow. The bidder shall
carry out de-silting work in such a way that there shall not be any sewage backing /
overflowing into sewer line/ storm water line, divergen of existing sewage flow shall
be planned such that overflowing / backing during divergen of the sewage can be
7.3 The bidder and any of its personnel or agents will be granted permission by the
Employer to enter its premises and lands for the purpose of such inspection, but only
upon the express condition that the bidder, its personnel and agents, will release
and indemnify the Employer and its personnel and agents from and against all
liability in respect thereof and will be responsible for death or personal injury, loss of
or damage to property and any other loss, damage, costs and expenses incurred as
a result of the inspection.
B. Bidding Documents
8. Contents of Bidding Documents
8.1 The set of bidding documents listed below:
Section A Instruction To Bidders (ITB)
Section B General Conditions of Contract
Section C Form of Bid and Appendix to Bid
Section D Technical Specifications
Section E Bill of Quantities (BOQ)
The bidder is expected to examine carefully the contents of all the above bid
documents. Failures to comply with the requirements of bid documents will be at
the bidder's own risk. Bids which are not substantially responsive to the
requirements of the bidding documents will be rejected.
C. Preparation of Bids
9. Language of Bid
9.1 The bid, and all correspondence and documents related to the bid exchanged
between the bidder and the Employer shall be written in the English language.
Supporting documents and printed literature furnished by the bidder may be in
another language provided they are accompanied by an accurate translation of the
relevant passages in the English language, in which case, for purposes of
interpretation of the bid, the English translation shall prevail.
10. Documents comprising the Bid
10.1 The bids shall be submitted in hard copy and two copies, one marked as “original”
and other marked as “Duplicate”, both of which comprise the following documents:-
Tender Document volume be contained following.
i) Bid Security for an amount as specified in the Invitation for Bids (IFB).
ii) Information as specified.
iii) Tender fees as specified in the Invitation for Bids (IFB).
The Tender Document shall be hard bound and all pages machine numbered.
Bid security shall be furnished in “Original” set of Document.
I. Form of Bid (Section.-III) – duly filled in and signed on each page
This is two bid system tender invitation system. Hence bidder should submit online
technical bid and financial bid in separate form uploaded online only and he
should submit technical bid for physical submission to stated address by stipulated
time and date. Financial bid should not be submitted in form of physical
submission. Bid security in form of B.G. of approved bak by AMC or D.D and
tender fees in form of DD only must be submitted with Technical bid.
Authority does not take any responsible for opening of seal or loss of physical
submitted financial bid.
In case of any ambiguity the “Original” set of document shall prevail.
The documents listed under Section III, for Bid Security of Sub Clause shall be
filled in without exception in the given format.
The bidder shall prepare and submit two copies (Original and Duplicate) of the
The following documents are deemed to be part of Tender
Invitation for Bids (IFB)
Instructions to Bidders (ITB)
General Conditions of Contract
Technical Specifications
11.1 The bidder shall fill percentage rate on amount of BOQ (both in figures and
All pages of the Bill of Quantities shall be initialed.
11.2 All duties, taxes and other levies payable by the Contractor under the Contract, or
for any other cause as of the date 28 days prior to the deadline for submission of the
bids, shall be included in the rates and prices and the total bid price submitted by the
bidder and the evaluation and comparison of bids by the Employer shall be made
11.3 The rate and amount quoted by the bidder are subject to adjustment during the
evaluation of the price bid as well as performance of the Contract in accordance
necessity for the work required by AMC
12. Currencies of Bid and Payment
12.1 Rates shall be quoted by the bidder.
12.2 All payments including advances, if any, shall be made in Indian Rupees.
13. Bid Validity
13.1 Bids shall remain valid for a period of 120 days from the date of opening the price
bid. The Employer as non-responsive shall reject a bid valid for a shorter period.
13.2 In exceptional circumstances, prior to expiry of the original bid validity period, the
Employer may request the bidders to extend the period of validity for a specified
additional period. The request and the responses thereto shall be made in writing or
by fax. A bidder may refuse the request without forfeiting his bid security. A bidder
agreeing to the request will not be required or permitted to modify his bid but will be
required to extend the validity of his Bid Security for the period of the extension, and
in compliance with relevant Clause in all respects.
14. Bid Security
14.1 The bidder shall furnish as part of its Bid, a Bid Security in the amount as stipulated
in the Invitation for Bid (IFB) for particular work(s). The Bid Security shall be drawn
in favour of MUNICIPAL COMMISSIONER, Ahmedabad, and may be in one of the
following forms:
a) Bank Guarantee from any Nationalized or RBI approved foreign bank having
net worth of more than Rs.800 crore of Indian operation and approved bank by
AMC as per Annexure-I and Annexure-II.
b) Bank Guarantee from any bank included in the approved list of AMC The
format of Bank Guarantee shall be in accordance with the sample form of Bid
Security included in the bid document.
c) Demand draft or pay order of any Nationalized Bank in favour of Municipal
Commissioner, Ahmedabad.
14.2 Bank guarantees (and other instruments having fixed validity) issued as surety for
the bid shall be valid for 28 days beyond the validity of the bid.
14.3 Any bid not accompanied by an acceptable bid security and not secured as indicated
in relevant Clause shall be rejected by Employer as non-responsive.
14.4 The Bid Security of the unsuccessful bidders, except for L1, L2 and L3 bidders, will
be returned as promptly as possible as but not later than 28 days after the expiration
of the period of bid validity.
14.5 The Bid Security of the successful bidder, along with second and third lowest
tenders, will be returned when the bidder has furnished the required performance
security and signed the agreement.
14.6 The Bid Security may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) if the bidder does not accept the correction of his bid price, pursuant to
relevant Clause;
c) in the case of a successful bidder, if the bidder fails within the specified time
i) furnish the required Performance Security or
ii) sign the Agreement.
15. Alternative Proposals by Bidders - Deleted
16. Format and Signing of Bid
16.1 The bidder shall prepare two copies of the documents comprising the bid as
described in Instructions to Bidders.
16.2 The bid shall be typed or written in indelible ink and shall be signed by a person or
persons duly authorized to sign on behalf of the bidder.
16.3 The bid shall contain no alterations, omissions or additions, except those to comply
with instructions issued by the Employer, or as necessary to correct errors made by
the bidder, in which case the person or persons signing the bid shall initial all such
16.4 All witnesses and sureties shall be persons of status and probity and their full
names, occupations and addresses shall be printed below their signatures.
D. Submission of Bids
17. Sealing and Marking of Bids
17.1 The bidder shall submit tender documents online as specified on website
www.nprocure.com. on prescribed time and date and he shall also submit the
Technical bid in envelop as physical document submission as stated date and time
to following address of the office of Ahmedabad Municipal Corporation.. He shall not
submit financial bid as physical submission. This volume shall be sealed in envelope
along with the separate sealed envelopes of tender fee and bid security. These
envelopes shall be sealed in an outer envelope. The Bid envelopes shall be marked
Outer Envelope as well as Inner Envelope shall be stated with reference
" Diversion of drainage line into the existing stormwater line from Chandkheda Bus Stand to Visat
Circle in Chandkheda Ward (West Zone), including ancillary works and CCTV-assisted cleaning
of the said line.(ARC)”.as per requirement.
17.2 The inner and outer envelopes shall be addressed to the Employer at the following
Asst. Manager (WEST ZONE),
Ahmedabad Municipal Corporation,
WEST ZONAL OFFICE, USHMANPURA,
Ahmedabad , Gujarat.
17.3 If the outer envelope is not sealed and marked as above, the Employer will assume
no responsibility for the misplacement or premature opening of the bid.
18. Deadline for Submission of Bids
18.1 Bids must be received by the Employer at the address specified above not later than
the time and date specified in the IFB.
18.2 The Employer may, at his discretion, extend the deadline for submission of bids by
issuing an amendment in accordance with relevant Clause, in which case all rights
and obligations of the Employer and the bidders previously subject to the original
deadline will thereafter be subject to the deadline as extended.
19.1 Any bid received by the Employer after the deadline for submission of bids
prescribed in the relevant Clause will be returned unopened to the bidder.
20. Modifications and Withdrawal of Bids ----Deleted
E. Bid Opening and Evaluation
21. Opening of Tender (Bid)
21.1 This is online submission system. Hence, Tender volume-I (Technical bid) shall be
opened online. He may be acknowledged online for technical bid opening as per
rules and regulation of website www.nprocure.com. But, for physical tender
document, the Employer will open the outer envelope of all the bids received for the
package (except those received late) containing the sealed Tender volume and
announce the names of (i) bidders, (ii) bidders who have given notice for withdrawal
of their bids in the presence of bidders or their representatives who choose to attend
on the date and time mentioned in the IFB. In the event of specified date of bid
opening being declared as a holiday for the Employer, the Tender will be opened at
the appointed time and location on the next working day.
21.2 Bids for which acceptable notice of withdrawal has been submitted pursuant to
relevant Clause shall not be opened and shall be returned.
21.3 Envelopes marked Tender volume-I (Technical bid) shall then be opened at the
office of city engineer as physical submission. The Employer at the opening will
announce bidder’s names, the presence/or absence of Bid Security, the amount
and validity of Bid Security furnished with each bid and such other details, as the
Employer may consider appropriate.
21.4 The bidders or their representatives who are present shall sign attendance sheet
evidencing their attendance.
21.5 The Employer shall prepare besides the record of bid opening, minutes of the Bid
opening, including the information disclosed to those present in accordance with
relevant Clause hereof.
22. Examination of Tender and Determination of Responsiveness of Tender
22.1 If the Bid Security furnished does not conform to the amount and validity period as
specified in the Invitation for Bid and has not been furnished in the form, the bid shall
be rejected by the Employer as non-responsive and the Tender volume will be
returned to the bidder.
22.2 Subject to confirmation of the Bid Security by the issuing bank, the Tender volume
accompanied with valid Bid Security will be taken up for further evaluation. In case,
the Bank does not confirm the Bid Security, the bid shall be rejected as non-
responsive and no further evaluation carried out.
22.3 The tender volume will further be examined to determine whether the bid has been
properly signed, meets the eligibility and qualification criteria, is accompanied by the
requisite certificates, undertaking and other relevant information specified in the bid
documents and is substantially responsive to the requirement of the bidding
documents and provides any clarification for ascertaining the correctness of the
information/details that the Employer may require pursuant to relevant Clause.
22.4 If the Tender volume is not substantially responsive, it will be rejected by the
Employer and will not subsequently be made responsive by correction or
modification or withdrawal of the non-conforming deviation or reservation.
23. Opening of Tender
23.1 The Technical Bid shall be opened for evaluation and eligibility qualification for
opening of financial bid.
23.2 The Employer will open the financial bid online through www.nprocure.com of those
bidders whose document has been determined to be substantially responsive in
accordance with relevant Clause, and who have the required available bid capacity,
in presence of the bidders or their representatives who choose to attend on the date
intimated to such bidders.
23.3 The names of the bidders whose Tender volume is found to be substantially
responsive, the bid prices, the total amount of each bid, any discount, ‘modifications
responsive, the bid prices, the total amount of each bid, any discount, ‘modifications
of B.O.Q and such other details, as the Employer may consider appropriate will be
announced by the Employer at the opening of the Tender volume. Any bid price,
which is not read out and recorded at the bid opening, will not be taken into account
in Bid Evaluation.
23.4 The bidders or their representatives who are present shall sign attendance sheet
evidencing their attendance.
23.5 The Employer shall prepare besides the record of bid opening, minutes of the
Tender volume opening including the information disclosed to those in accordance
with relevant Clause.
24. Examination of Bids and Determination of Responsiveness of Bid
24.1 The Employer will determine responsiveness of each Tender volume with respect to
filled data online and he shall be declared technically qualified for opening of price
bid. Price bid shall be opened only of qualified bidders online.
24.2 A substantially responsive Tender volume is one which conforms to all the terms,
conditions and specifications of the bidding documents, without material deviation or
reservation. A material deviation or reservation is one (i) which affects in any
substantial way the scope, quality or performance of the Works; (ii) which limits in
any substantial way, inconsistent with the bidding documents, the Employer's rights
or the bidder's obligations under the Contract; or (iii) whose rectification would affect
unfairly the competitive position of other bidders presenting substantially responsive
24.3 If the Tender volume is not substantially responsive, it will be rejected by the
Employer and may not subsequently be made responsive by correction or
withdrawal of the non-conforming deviation or reservation.
25. Correction of Errors
25.1 Tender volume determined to be substantially responsive will be checked by the
Employer for any arithmetic errors. Arithmetic errors will be rectified on the following
i) where there is a discrepancy between the figures and words, for % and
amount, the figure in words will govern and
ii) where there is discrepancy in total amount arrived by addition of percentage
ii) where there is discrepancy in total amount arrived by addition of percentage
(above or below), the amount arrived by addition percentage (above or
below) as written in word shall govern.
25.2 The amount stated in the Form of Bid will be adjusted by the Employer in
accordance with the above procedure for the correction of errors and shall be
considered as binding upon the bidder. If the bidder does not accept the corrected
amount of bid, his bid will be rejected, and his Bid Security may be forfeited in
accordance with relevant Clause.
26. Evaluation and Comparison of Tender volume
26.1 The Employer will evaluate and compare only those Tender volumes which are
determined to be substantially responsive in accordance with Clause 28 and
qualified for award of Contract in accordance with relevant Clause.
26.2 In evaluating the Tender volume, the Employer will determine for each Tender
volume the evaluated Bid Price by adjusting the Bid Price as follows:-
a) making any correction for errors pursuant to relevant Clause
b) making appropriate adjustments to reflect any price modifications offered in
accordance with relevant Clause.
26.3 The estimated effect of the price adjustment provision under method of price
adjustment mentioned in Appendix to Bid Form of Section V applied during the
period of implementation of the Contract, shall not be taken into account in Bid
26.4 If the Bid of the successful Bidder is seriously unbalanced in relation to the
Employer’s estimate of the cost of the items of the Works to be performed under the
Contract, the Employer may require the bidder to produce detailed price analysis for
any or all items of the Bill of Quantities, to demonstrate the internal consistency of
those prices with the construction methods and schedule proposed. After evaluation
of the price analysis, the Employer may require that the amount of the performance
security set forth in Clause 37 be increased up to an additional 5 (five) per cent at
the expense of the successful bidder to protect the Employer against financial loss in
the event of default of the successful bidder under the Contract.
26.5 A bid, which is unrealistically lower then estimate and which the bidder, could not
substantiate satisfactorily, may be rejected as non-responsive.
27. Clarification of Bids
27.1 To assist in the examination, evaluation and comparison of bids, the Employer may,
at his discretion, ask any bidder for authentication the correctness of the
information/details furnished by him in his bid. Such request by the Employer and
the response by bidder shall be in writing or by cable/fax, but no change in the price
or substance of the bid shall be sought, offered or permitted except as required to
confirm the correction of arithmetical errors discovered by the Employer in the
evaluation of the bids in accordance with relevant Clause.
27.2 Subject to relevant Clause, no bidders shall contact the Employer on any matter
relating to his bid from the time of bid opening to the time contract is awarded.
27.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation,
bid comparison or contract award decisions may result in the rejection of his bid.
28.1 Information relating to the examination, clarification, evaluation and comparison of
bids and recommendations for the award of a contract shall not be disclosed to
bidders or any other persons not officially concerned with such process until the
award to the successful bidder has been announced. Any effort by a bidder to
influence the Employer's processing of bids or award decisions may result in the
rejection of his bid.
F. Award of Contract
29. Employer's Right to Accept any Bid and Reject any or all Bids
29.1 Employer reserves the right to accept or reject any bid and to annul the bidding
process and reject all bids, at any time prior to award of Contract, without thereby
incurring any liability to the affected bidder or bidders or any obligation to inform the
affected bidder or bidders of the grounds for the Employer's action.
30. Notification of Award
30.1 Prior to expiration of the period of bid validity prescribed by the Employer, the
Employer will notify the successful bidder by cable/fax and confirmed by registered
letter that his bid has been accepted. This letter (hereinafter and in the Conditions of
Contract called "the Letter of Intent- LOI ") shall name the sum which the Employer
will pay the Contractor in consideration of the execution, completion and
maintenance of the Works by the Contractor as prescribed by the Contract
(hereinafter and in the Conditions of Contract termed "the Contract Price").
30.2 The notification of award will constitute the formation of the Contract.
31. Signing of Agreement
31.1 At the same time that the Employer notifies the successful bidder that his bid has
been accepted, the Employer will direct him to submit the Performance Security and
attend the Employer's office on a date determined by the Employer for signing the
Form of Agreement.
31.2 Within 28 (twenty eight) days of the date of signing the Form of Agreement, the
successful bidder shall, if required, have the same engrossed, have the correct
amount of stamp duty adjudicated by the Inspector General of Registrations, New
Delhi and return the same duly signed and executed on behalf of the successful
bidder to the Employer.
32. Corrupt or Fraudulent Practices
32.1 The Employer will reject a proposal for award if he determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in competing
for the contract in question. The Employer will declare the firm ineligible, either
indefinitely or for a stated period of time, to be awarded a contract by AHMEDABAD
MUNICIPAL CORPORATION if it at any time determines that the firm has engaged
in corrupt or fraudulent practices in competing for the contract, or during execution.
i) “corrupt practice” means behavior on the part of officials in the public or
private sectors by which they improperly and unlawfully enrich themselves
and/or those close to them, or induce others to do so, by misusing the
position in which they are placed, and it includes the offering, giving,
receiving, or soliciting of anything of value to influence the action of any
such official in the procurement process or in contract execution; and
ii) “fraudulent practice” means a misrepresentation of facts in order to
influence a procurement process or the execution of a contract to the
detriment of the Borrower, and includes collusive practice among bidders
(prior to or after bid submission) designed to establish bid prices at artificial
non-competitive levels and to deprive the Borrower of the benefits of free
and open competition.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
SECTION: B:- GENERAL CONDITIONS OF CONTRACT
B1:- CONDITIONS OF PARTICULAR APPLICATION
1. The selection process will lay high emphasis on the ability and competency of contractors to
do high quality work within the given time schedule.
2. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
3. All information has to be typed or hand written legibly. All pages of the Bid have to be initialed
4. ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY.
Projects for which incomplete information has been provided will not be considered for
evaluation. The Bidder may attach separate sheets if so required. However the final bound
document submitted, has to be submitted in vertical A4 size (210mmx 297 mm).
5. The scope of work, project description mentioned in the document is indicative and is likely to
change during detail design. Project brief, along-with the schematic drawings and coloured
photographs, is provided to assist the bidder in understanding the fundamental and specific
requirements of the project.
6. Conditional tenders will not be accepted.
7. AMC’s decision for selection or rejection of the offers shall be final and binding to all.
8. Bidder should provide information as mentioned in the prescribed forms for Road projects.
Information other than that related to Road projects shall not be considered for evaluation.
9. If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be
liable for disqualification / rejection at any stage.
10. Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the
Tender volume is submitted without valid documents and without proof of eligibility criteria
will be rejected.
11. Those who do not meet with the eligibility criteria need not submit the Tender document.
12. Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect
or are conditional tenders, will be rejected.
13. Municipal Commissioner reserves the rights to reduce/ increase the scope of work and
contract without assigning any reason thereof.
14. Contractor shall have to make his own arrangements for water and electricity for the purpose
of construction work at site at his own expense.
15. If the contractor fails to execute the said works within prescribed time limit, the said work will
be carried out at the risk and cost by other contractors with 15 % supervision charges as may
be decided by the City Engineer.
16. Safety and Signage
Contactor has to arrange for the complete safety of the persons working for project, users of
the road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber
cones, traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site.
Necessary florescent marking on traffic signs to be provided so that it should be visible at
During night working hours safety in charge personnels shall be provided with florescent
17. Tax, Duties on Materials
All charge on account of Octroi, excise duties, terminal tax, sales tax. Service tax, VAT etc.
on material procurement or any other component for the works from any source shall be
borne by the contractors.
18. Water Supply:
The contractor shall arrange at his own cost, a suitable supply of piped water for the
construction of the works and provide a satisfactory supply of potable water for drinking.,
washing, sanitation and cleaning down, The contractor will be responsible for all the costs
where applicable of connection, meter installation, water consumed, water required for
testing purposes, disconnection and the laying, maintenance and ultimate removal of any
distribution system around the site. If contractors wishes to get the water supply from
Ahmedabad Municipal Corporation, if available then water connection at one point will be
given. The contractor will arrange Balance distribution. Recovery at the actual charges as per
prevailing norms of the AMC will be deducted for the actual consumption from each RA bill.
In case of non-availability of water supply by AMC, then it is the responsibility of the
contractor to arrange for the water supply at his own.
19. Electricity:
The Corporation will do co-ordination for the supply of the electricity. But the Contractor must
make his own arrangements with the Corporation and Electricity Supply Authorities and with
other contractors to connect to and take a supply from such services. Paying all costs in this
regard will be the responsibility of the contractors.
The Contractor shall be entitled to use such supply. Electricity as may be available on the
site for purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case if there is any delay in supply of power at site or any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use
of diesel operating sets etc. as the case may be and no extra time limit shall be granted. In
case of failure of the non-payment of power consumption charges, AMC reserves the right to
deduct the same from the RA/ Final Bills of the contractor.
20. Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection
or new connection on behalf of AMC. It includes filling the necessary application to power
Supply Company, follow up and getting the supply, filling the necessary test reports to the
power supply company. All official fees including security deposits and other expenses shall
be of initially paid by the contractor. All the official fees shall be reimbursed by AMC on
submission of documentary proof of receipt of the same.
21. Contractor will be required to submit mix design for all concrete mix for prior approval.
22. For non-bituminous, bituminous and concrete works, the black trap aggregates of required
size shall be procured from quarry situated in Sevaliya/Timba region or of equivalent quality .
Prior approval of source/ material by Engineer-in-Charge shall be required.
23. As per St. committee's resolution 0.5% Testing charges shall be deducted from each R.A. Bill
for Civil works and the amount of actual Testing charges shall be adjusted in the final bill.
24. In case of any discrepancy/ or variation in BOQ items and detailed specification, the
description given in BOQ items as well as detailed technical specifications a decision of
concern City Engineer shall govern.
Special Clause: As per construction works welfare cess Act – 1996 one percent of
tender amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
B2:- TERMS & CONDITIONS OF CONTRACT
1. Security Deposit
The person / persons whose tender may be accepted (here-in-after called the
‘Contractor’ which expression shall unless excluded by or repugnant to the context
include his heirs, executors, administrators and assignees) shall (within one day for
a contract of Rs. 1,000 or less or 2 days for a contract of more than Rs. 1,000 but
less than Rs. 2,000 and so on upto a limit of ten days which can be extended upto
15 days by the Concerned Dy. Municipal Commissioner, if he thinks it fit to do so for
a contract of Rs. 10,000 or more of the receipt by him of the notification of the
acceptance of his tender), deposit with the Municipal Commissioner in form of pay
order or Demand Draft of any nationalize bank or Bank Guarantee of approved
bank by AMC. endorsed to the Municipal Commissioner. Securities deposit must be
5 % amount of the approved tender cost. All compensation or other sums of money
payable by the Contractor to Municipal Corporation under the terms of this contract
may be deducted from, or paid by the sale of a sufficient part of his security deposit
or from the interest arising there from, or any sums which may be due or may
become due by Municipal Corporation to the Contractor on any account whatsoever,
and in the event of his security deposit being reduced by reason of any such
deduction or sale as aforesaid, the Contractor shall, within ten days thereafter, make
good in cash or Government securities endorsed as aforesaid any sum or sums
which may have been deducted from or realized by sale of his security deposit or
any part thereof. The security deposit referred to, when paid in cash may, at the
cost of the depositor, be converted into Interest Bearing Securities provided the
depositor has expressly desired this in writing.
If the amount of the security deposit to be paid in a lump within a period specified
above is not paid, the tender / contract already accepted shall be considered as
canceled and legal steps shall be taken against the Contractor for recovery of the
amounts. Security Deposit shall be converted into the Performance Guarantee
Bond Valid for the entire defect liability period to be executed by the contractor after
completion of the work and certificate of completion issued by Engineer that effect
after deducting therefrom the amount of expenses if any due to Municipal
Corporation under this agreement.
2. Liquidated damages for delay
2.1 If the Contractor fails to complete the work under contract by the stipulated date, he
shall pay liquidated damages of 10% amount of the balance work after date of
completion stipulated in the tender..
2.2 Delays for requiring payment of ten percentage liquidated damages of the amount
put to tender for performance shall be sufficient for termination of contract and
forfeiture of security deposit including amount of performance bond in respect of
works estimated to cost more than Rs. 15 lacs of performance and registration of the
contractor shall also be kept in abeyance for three years from the date as fixed on all
3. Default by Contractor :
If the Contractor shall neglect or fails to proceed with the work with due diligence or
if he violates any of the provision of the Contract, the Engineer-in-Charge shall give
the Contractor a notice, identifying deficiencies in performance and demanding
corrective action. Such notice shall clearly state that it is given under the provision of
this clause. After service of such notice, the Contractor shall not remove any plant,
equipments and materials from the site. The Ahmedabad Municipal Corporation
shall have a lien on all such plant, equipments and materials from the date of such
notice till the said deficiencies have been corrected as mentioned in the said notice.
If the Contractor fails to take satisfactory corrective action within ten days after
receipt of such notice, the Engineer-in-charge on behalf of Ahmedabad Municipal
Corporation shall terminate the contract in whole. In case, the entire contract is
terminated, the amount of security deposit and performance bond if any together
with the value of the work done but not paid for, shall stand forfeited to the
Ahmedabad Municipal Corporation. The plants equipment and material held under
this clause shall then be at the disposal of the Ahmedabad Municipal Corporation to
recover the amount equivalent to the liquidated damages and registration of the
Contractor shall be kept in abeyance for three years from the date as fixed in all
The Engineer-in-Charge if necessary shall direct that a part or the whole of such
plant, equipment and material be removed from the site within a stipulated period. If
the Contractor fails to do so, the Engineer-in-Charge shall cause them or any part of
them to be sold holding the net proceeds of such sale to the credit of the Contractor.
After settlement of accounts, the lien by the Ahmedabad Municipal Corporation on
the Contractors remaining plant, equipments and balances of materials shall be
Termination of the contract in whole shall be adequate authority for the Engineer-in-
Charge to demand discharge of the obligations from the guarantors of the security
for the performance.
If the progress of any particular portion of the work under Contract is unsatisfactory,
the Engineer-in-Charge shall, notwithstanding that the general progress of the work is
satisfactory, in accordance with clause 2, be entitled to take necessary action under
Clause 3, after giving the Contractor ten day’s notice in writing and the Contractor
shall have no claim whatsoever for any compensation for any loss caused to him due
to such action.
(Clause 1,2,3 and 4 are substituted vide GR No. TNC – 1091/IB-10/(11)-C, dated
15-10-91 & modified by GR dated 29-10-91) and GR No. TNC-1088/1B/18/(B) –C
dated 31-8-94 and No. TNC /10 / 2002/14-C dat4d 28-4-2003.
In any case in which any of powers conferred upon the Engineer-in-Charge by clause
3 hereof shall have become exercisable and the same shall not have been exercised,
the non exercise thereof shall not constitute a waiver of any of the conditions hereof
and such powers shall notwithstanding be exercisable at any future date.
5.1 Valuation at date of forfeiture
The owner shall as soon as may be practicable after his entry consequent upon the
expulsion of the Contractor fix and determine expert or by or after reference to the
parties or after such investigations or inquiries as he may think fit to take or institute
and shall certify what amount (if any) which had at the time of such entry and
expulsion become reasonably due to the Contractor in respect of work then actually
done by him under the contract including the value of any unused or partially used
materials, any constructional plant and any temporary works which are taken over by
owner under his exclusive rights.
5.2 Payment after Forfeiture
If purchaser shall enter and expel the Contractor under this clause, he shall not be
able to pay the Contractor any money on account of the contract as determined as
per the foregoing para together with the Contractor other dues until the expiry of the
defects liability period and there after until the costs of completion and maintenance
damages for delay in completion (if any) and all other expenses incurred by
Purchaser have been ascertained and the amount thereof certified by the Architect,
the Contractor shall than be entitled to receive only such sum of sums, (if any) as
owner may certify. But if such amount due from the contractor exceeds the sum
payable to the Contractor, the Contractor shall upon demand pay to Purchaser the
amount of such excess and it shall be deemed as debt due by the contractor to
Purchaser and shall be recoverable accordingly.
5.3 If the Contractor dies
Without prejudice to any of the rights or remedies under this contract, if the
Contractor dies owner shall have option of terminating the contract without any
compensation to the Contractor.
5.4 Insolvency and breach of contract
The AMC may at any time, by notice in writing, summarily terminate the contrast
without compensation to the contractor in any of the following events :
a) If the contractor, a firm or any partner thereof, shall be at the time adjusted
insolvent or shall have a receiving order for administration of his estate made
against him or shall take any proceedings for composition under any insolvency act
for the time being in force to make any conveyance or assignment of his assets or
enter into any arrangement or composition with his creditors or suspend of
payment if the firm is dissolved under the partnership Act.
b) If the contractor being a company is wound up voluntarily by the order of a court or
receiver, liquidator or Manager on behalf of the debenture holders is appointed or
circumstances shall have arisen which entitled the court or Debenture holders to
appoint a receiver liquidator or Manager.
c) If the contractor commits any breach of the contract not herein specifically provided
any right of action or remedy which shall have occurred or shall occur thereafter
and provided also the contractors be liable to pay the AMC for any extra
expenditure he is thereby put to and the contractor shall under no circumstances
be entitle to any gain in repurchase.
5.5 In the event of the Engineer-in-Charge taking action under Clause 3, he may, if the
so desires, take possession of all or any tools, plants, machinaries, materials and
stores in or upon the work or the site thereof or belonging to the Contractor or
procured by him and intended to be used for the execution of the work or any part
thereof, by paying or allowing for the same in account at the contract rate or in case
of contract rates not being applicable at such reasonable rates, as may be
comparable to current market rates where ascertainable of similar articles and
comparable condition, to be certified by the Engineer-in-Charge. In the alternative
the Engineer-in-Charge may by notice in writing to the Contractor or his clerk of the
works, foreman or other authorised agent, require him to remove such tools, plants,
machineries, materials or stores from the premises within a time to be specified in
such notice and in the event of the Contractor failing to comply with any such
requisition, the Engineer-in-Charge may remove them at the Contractor’s expense or
shall remove them by auction or private sale at the risk and cost of the Contractor in
all respect, and the certificate of the Engineer-in-Charge as to the expenses of any
such removal and the amount of the proceeds and expenses of any such removal
shall be final and conclusive against the Contractor.
6. Clause:-6, Extension of Time limit:-
If the Contractor shall desire an extension of the time for completion of the work on
the ground of his having been unavoidably hindered in its execution or any other
ground, he shall apply in writing to the Concerned Dy. Municipal Commissioner
before the expiration of the period stipulated in the tender or before the expiration of
30 days from the date of which he was hindered whichever is earlier Concerned Dy.
Municipal Commissioner may, in his opinion, believe that there are reasonable
grounds for granting an extension, grant such extension, as he thinks necessary or
proper. The decision of the Concerned Dy. Municipal Commissioner in this matter
shall be final.
As soon as the work is completed, the Contractor shall give a notice of such
completion to the Engineer-in-Charge and on receipt of such notice, the Engineer-in-
Charge shall inspect the work, and if he is satisfied that the work is completed in all
respects then: –
d) For all works costing upto Rs. 50 lakhs (amount put to tender), the final
measurements shall be recorded within 45 days from the date of physical
completion of the work and the final bill shall be prepared within 45 days from the
date of recording final measurements. The completion certificate shall be issued
within one month from the date of final measurements subject to the Contractor
fulfilling his obligation as provided in the contract and subject to the work being
complete in all respect.
e) In respect of works costing more than Rs. 50 lakhs (amount put to tender), the final
measurements shall be recorded within 75 days from the date of physical
completion of the work and the final bill shall be prepared within 75 days from the
date of final measurements subject to the Contractor fulfilling his obligation as
provided in the contract and subject to the work being complete in all respects.
When separate periods of completion have been specified for items or groups of
items, the Engineer-in-Charge shall issue separate completion certificate for such
items or groups of items.
No certificate of completion shall be issued nor shall the work be considered to be
complete till the contractor shall have removed from the premises, on which the
work has been executed, all scaffoldings, sheds and surplus materials, except
such, as are required for rectification of defects, rubbish and all huts and sanitary
arrangements required for his workmen on the site in connection with the
execution of the work, as shall have been erected by the Contractor for the
workmen and cleared all dirt from all parts of the building(s) in, upon or around
which the work has been executed or of which he may have possession for the
purpose of the execution thereof and cleared floors, gutters and drains, cased
doors and sashes, oiled locks and fastenings, labeled keys clearly and handed
them over to the Engineer-in-Charge or his representative and made the whole
premises fit for immediate occupation or use to the satisfaction of the Engineer-in-
Charge. If the Contractor shall fail to comply with any of the requirements of these
conditions as aforesaid, on or before the date of completion of the work, the
Engineer-in-Charge may, at the expense of the Contractor, fulfill such
requirements and dispose of the scaffolding, or surplus materials and rubbish
materials except for any sum actually realised by the sale thereof less the cost of
fulfilling the requirement and any other amount that may be due from the
Contractor. If the expenses of fulfilling such requirement pay such excess. The
Engineer-in-Charge shall also have the rights to adjust the amount of excess
against any amounts that may be payable to the Contractor.
8. Clause – 8 :
No payment shall be made for any work, estimated to cost less than rupees one
thousand till after the whole of the said work shall have been completed and a
certificate of completion given. But in the case of works estimated to cost more than
rupees one thousand, the Contractor shall, on submitting a monthly bill therefore, be
entitled to receive payment proportionate to the part of the work then approved and
passed by the Engineer-in-Charge, whose certificate of such approval and passing of
the sum so payable shall be final and conclusive against the Contractor. All such
intermediate payments shall be regarded as payments by way of advance against the
final payments only and not as payments for work actually done and completed and
shall not preclude the Engineer-in-Charge from requiring bad, unsound, imperfect or
unskilled work to be removed and taken away and reconstructed, or re-errected, nor
shall any such payment be considered as an admission of the due performance of the
contract or any part thereof if any other way very or effect the contract. The final bill
shall be submitted by the Contractor within one month of the completion of the work,
otherwise the Engineer-in-Charge’s certificate of the measurements and of the total
amount payable for the work shall be final and binding on all parties.
9. Clause – 9 :
The rates for items of works shall be valid only when the item concerned is accepted
as having been completed fully in accordance with the sanctioned specifications. In
cases where the items of work are accepted as not so completed, the Engineer-in-
Charge may make payment on account of such items at such reduced rates as he
may considered reasonable in preparation of final or on account bill.
10. Clause – 10 Bills to be submitted monthly
For the works costing above Rs. 10,00,000 payment will be made once in a month.
However, another payment will be made as desired by contractor and as agreed by
11. Clause – 11 :
The Contractor shall submit all the bills on the printed forms to be had on application
at the office of the Engineer-in-Charge. The charges to be made in the bills shall
always be entered at the rates specified in the agreement or at the part/reduced rates
subject to the approval by the Engineer-in-Charge in the case of items not
completed/executed as per agreements or in the case of any extra work ordered in
pursuance of these conditions and not mentioned or provided for in the tender, at the
rate hereinafter provided for such work.
12. Clause – 12 :
If the specification of estimate of the work provides for the use of any special
description of materials to be supplied from the Departmental Store of Ahmedabad
Municipal Corporation or if it is required that the Contractor shall use certain stores to
be provided by the Engineer-in-Charge (such materials and stores and the prices to
be charged therefore as hereinafter mentioned being so far as practicable for the
convenience of the Contractor but not so as in any way to control the meaning or
effect of this contract specified in the schedule or memorandum here in annexed) the
Contractor shall be supplied with materials and stores as may be required from time
to time to be used by him for the purpose of the contract only, and the value of the full
quantity of materials and stores so supplied shall be set off or deducted from any
sum then deposit, or thereafter to become due to the Contractor under the contract,
or otherwise, or from the security deposit, or the proceeds of safe thereof; if the
deposit is held in Ahmedabad Municipal Corporation securities/Bank Guarantee/
Cash/ Bank Draft the same or a sufficient portion thereof, shall, in that case be sold
for the purpose. All materials supplied to the Contractor shall remain the absolute
properly of Ahmedabad Municipal Corporation and shall, on no account, be removed
from the site of the work, and shall at all time, be open to inspection by the Engineer-
in-Charge. Any such materials, unused and in perfectly good condition at the time of
completion or termination of the contract, shall be returned to the Departmental store
if the Engineer-in-Charge so requires by a notice in writing given under his hand, but
the Contractor shall not be entitled to return any such materials except with the
consent in writing of the Engineer-in-Charge and he shall have no claim for
compensation on account of any such material supplied to him as aforesaid but
remaining unused by him or for any wastage in or damage thereto.
For materials provided in Schedule-A and consumed in excess quantities, the rates
provided in Schedule – A shall be increased / decreased corresponding to the
increase/decrease in the new rate payable for excess quantity as compared to the
tender rates. The rate for materials provided in extra items will be the issue rates
plus storage charges ruling on the date of issue of such quantity of materials.
12.1 The Contractor shall be entitled to use the materials supplied by the Corporation only
to the extent of quantities of such materials required for execution of the work as per
theoretical calculations. The Engineer-in-Charge may, however, on being satisfied
that a large quantity of such materials is required for the execution of the work, permit
the Contractor to use such larger quantity of the materials. Such permission shall be
given in writing.
The Contractor is bound to return in good condition such materials issued in excess
of the requirements so worked out or in excess of the quantities so permitted to be
used by the Engineer-in-Charge. If the Contractor fails to return such extra materials
within a period of 15 days from the date of demand in writing of such materials being
made by the Engineer-in-Charge, he shall be changed for the excess materials at
double the issue rate for such materials specified in “Schedule A” of the contract
12.2 All stores and materials such as cement, if the total consumption of which exceeds
25 tons, and steel etc, supplied to the Contractor by Ahmedabad Municipal
Corporation shall be kept by the Contractor in separate godown provided with a
double lock. The key of one of the lock shall remain with the Engineer-in-Charge or
his agent. The godown shall be accessible to the Engineer-in-Charge or his agent at
all times. No materials shall be allowed to be removed from the site of the work, and
any material required for the execution of the work shall be taken out from the
godown only in the presence of a duly authorised agent of the Engineer-in-Charge.
13. Clause – 13 :
13.1 The Contractor shall execute the whole and every part of the work in the most
substantial and workman-like manner and both as regards materials and in other
respect in strict accordance with specifications.
The Contractor shall also conform exactly, fully and faithfully to the designs,
drawings and instructions in writing to the work signed by the Engineer-in-Charge.
The design and the drawings shall be lodged in the office of the Engineer-in-Charge
to which the Contractor shall be entitled to have access for the purpose of inspection
at such office during office hours.
Where the instructions referred to above are not contained in separate letters
addressed to the Contractor the same shall be recorded in the work order book,
which shall be maintained and kept on the site of the work. The Contractor shall be
required to sign such entries in the work-order book in token of having noted the
instructions. However, if the Contractor fails to sign the work-order book for any
reason whatsoever, the entry of the instructions in the work-order book shall be
deemed to be due notice to him of the said instructions. The work-order book shall
be open for inspection to the Contractor on the site of the work during office hours.
13.2 The Contractor will be entitled to receive the certified copy of the accepted tender
along with the work order free of cost and will also be entitled to receive, on request,
two sets of contract and working drawings according to the progress of work, as and
when needed, free of cost.
13.3 The several documents forming the contract are essential parts of the contract and a
requirement occurring in one is a binding as through occurring in all. They are
intended to be mutually explanatory and complementary and to describe and provide
for a complete work. Further copies of the contract drawings and working drawings if
required by them shall be supplied at a rate of Rs. 2500/- per set of contract drawing
for the work and Rs. 500/- per working drawings except where other wise specified.
In the event of any discrepancy in the several documents forming the contract or in
any one document, the following order of precedence should apply.
(a) Dimension and quantities :
(ii) Schedule B of the Tender form
(iii) Specifications. On drawings, figured dimensions, unless obviously incorrect,
will be followed in preference to scaled dimensions.
(b) Description:
(i) Schedule – B of the ‘Tender Form’
(iii) Specifications. In the case of defective description or ambiguity, the
Engineer-in-Charge is entitled to issue further instructions directing in what
manner the work is to be carried out. The Contractor cannot take any
advantage of any apparent error or omission in drawings or specifications
and the Engineer-in-Charge shall be entitled to make corrections and
interpretations as necessary to fulfill the plans and specifications.
14.1 The Engineer in charge shall have power to make any alterations in or addition to
the original specifications, drawings, designs and instructions that may appear to
him to be necessary or advisable during the progress of the work and the Contractor
shall be bound to carry out the work in accordance with any instructions in this
connection which may be given to him in writing signed by the Engineer-in-Charge
and such alteration shall not invalidate the contract and additional work which the
Contractor may be directed to do in the manner above specified as part of the work
shall be carried out by the Contractor on the same conditions in all respect on which
he agreed to do the main work and at the as are specified in the tender for the main
14.4 If the additional or alternation work includes any class of work for which no rate is
specified in this contract when such class of work shall be carried out at the rate
entered in the Schedule of Rates of the Department or, at the rates mutually agreed
upon between the Engineer-in-Charge and Contractor, whichever are lower. If the
additional or altered work, for which no rate is entered in the Schedule of Rates of
Department is ordered to be carried out before the rates are agreed upon, then the
contractor shall within seven days of the date of receipt by him of the order to carry
out the work, inform the Engineer-in-Charge of the rate, he shall by notice in writing,
be at liberty to cancel his order to carryout such class of work and arrange to carry it
out in such manner as he may consider advisable, provided always that if the
contractor shall commence work or incur any expenditure in regard thereto before
the rates shall have been determined as lastly herein before mentioned, then in such
case, he shall only be entitled to be paid in respect of the work carried out or
expenditure incurred by him prior to the date of the determination of the rate as
aforesaid according to such rate or rate as shall be fixed by the Engineer-in-Charge.
In the event of a dispute, the decision of the Concerned Dy. Municipal Commissioner
of the Municipal Corporation shall be final.
Where, however, the work is to be executed according to the designs, drawings and
specifications recommended by the Contractor and accepted by the competent
authority, the alterations above referred to shall be within the scope of such designs
and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion that
the increase in the cost occasioned by alteration bears to the cost of the original
contract work, and the certificate of the Engineer-in-charges as to such proportion
shall be final and conclusive.
15. Clause – 15: No claim to any payment or compensation or for restriction of work
If any time after the execution of the contract documents the Engineer-in-charge shall
for any reason whatsoever, require the whole or part of the work, as specified in the
tender, be stopped for any period or shall not require the whole or part of the work to
be carried out at all or to be carried out by the Contractor, he shall give notice in
writing, stating the fact to the Contractor who shall thereupon suspend or stop the
work totally or partially, as the case may be. In any such case, except as provided
hereunder, the Contractor shall have no claim to any payment or compensation
whatsoever except as provided hereunder on account of any profit or advantage
which he might have derived form the execution of the work in full but which he did
not so derive in consequence of the full amount of the work not having been carried
out, or on account of any loss that he may be put to on account of materials
purchased or agreed to be purchased or for unemployment of labour required by him.
He shall not have also any claim for compensation by reason of any alterations
having been made in the original specifications, drawings, designs and instructions
which may involve any curtainment of the work as originally contemplated.
15.1 The Contractor shall not be entitled to claim any compensation from Municipal
Corporation on account of delay by Municipal Corporation in the supply of materials
entered in Schedule “A” where such delay is caused by the (i) Non-supply due to
short allotment of quota in case materials available under quota regulations (ii)
Difficulties relating to the supply of railway wagons (iii) Force majeure (iv) Act of God
(v) Act of the country’s enemies or any other reasonable cause beyond the control of
In the case of such delay in the supply of materials, Municipal Corporation shall
grant such extension of time for the completion of the works as shall appear to the
Engineer-in-Charge to be reasonable to accordance with the circumstances of the
case. The decision of the Engineer-in-Charge as the extension of time shall be
accepted as final by the Contractors. (As modified Vide R & B D.G.R. No. TNC –
16. Clause – 16: Time-Limit for unforeseen claims :
The Contractor shall not be entitled to any compensation from Municipal Corporation
on any account unless where allowed by the conditions of this contract. In such case,
the Contractor shall have to submit a claim in writing to the Engineer-in-charge within
one month of the cause of such claim occurring.
17. Clause – 17: Action and compensation in case of bad work :
If, at any time before the expiry of defects Liability, period, as detailed in Clause 17-A,
it shall appear to the Engineer-in-charge or his sub-ordinate in charge of the work,
that any work has been executed with unsound, imperfect or unskilled workmanship
or with materials or inferior quality or that any materials or articles provided by him for
the execution of the work are unsound, or of a quality inferior to that contracted for or
are otherwise not in accordance with the contract, it shall be lawful for the Engineer-
in-Charge to intimate this fact in writing to the Contractor and then notwithstanding
the fact that the work, materials or articles complained of, may have been passed,
certified and paid for, the Contractor shall be bound forthwith to rectify, or remove
and reconstruct the work so specified in whole or in part as the case may require, or
if so required shall remove the materials or articles so specified in whole or in part
and provide other proper and suitable materials or articles at his own charge and
cost, and in the event of his failing to do so within a period to be specified by the
Engineer-in-charge in the written intimation aforesaid, the Contractor shall be liable to
pay compensation at the rate of one percent on the amount of the estimate of the
rectification for every day not exceeding ten days during which the failure so
continues, and in the event of any such failure as aforesaid continuing beyond ten
days, the Engineer-in-charge may rectify or remove, and re-execute the work or
remove and replace the materials complained of, as the case may be at the risk and
expense in all respects of the Contractor should the Engineer-in-charge consider that
any such inferior work of materials as described above may be accepted or made
use of, it shall be within his discretion to accept the same at such reduced rates as he
may fix therefore,
However, the contractor shall be responsible for normal maintenance of the work till
the final bill for the work is prepared by the corporational officer.
17.1 Defect Liability Period :
The Contractor shall be responsible to make good and remedy at his own expense
any defect which may develop or may be noticed before the period mentioned
hereunder from the certified date of completion. The Engineer-in-
18. be given before work is covered up :
The Contractor shall charge shall give the Contractor a notice in writing about the
defects and the Contractor shall make good the same within 15 days of receipt of
the notice. In the case of failure on the part of the Contractor, the Engineer-in-
charge may rectify or remove or re-execute the work at the risk & cost of the
Contractor. The Engineer-in-charge shall be entitled to appropriate the whole or
any part of the amount of the security deposit towards the expenses, if any,
incurred by him in rectification, removal or re-execution. The Defects Liability
period shall be as under :-
(a) for all works costing upto Rs. 50,000/- (amount put to tender) the period shall be
months from the certified date of completion.
(b) for all works more than Rs. 50,000 and upto Rs. 1 crore (amount put to tender) the
period shall be 6 months from the certified date of completion or one monsoon,
whichever is later.
(c) for major projects costing more than Rs. 1 Crore, the period shall be 12 months
from the certified date of completion which should include one monsoon. For the
purpose of deciding the monsoon period the 30th September may be treated as the
(d) for buildings works, the period specified in (a), (b) or (c) above OR elapse of
monsoon period following the certified date of completion, whichever is later. For
the purpose of deciding the monsoon period, the 30th September may be treated
as the last date.
17.2 : Maintenance and repairs of the road during guaranteed period :
The contractor shall maintain and keep on proper condition and repair, at his cost
the surface of the road for 1 year from the date form which the final finishing coat is
laid to the satisfaction of the Concerned Dy. Municipal Commissioner. The decision
of the Concerned Dy. Municipal Commissioner as to the necessity of repairs to the
surface of the road shall be final and binding on the contractor. If the contractor fails
to maintain and keep in proper condition and repair the surface of the road during
the stipulated period of 1 year, the Concerned Dy. Municipal Commissioner shall be
entitled to carry out the necessary repairs departmentally at the cost of the
contractor. The decision of the Concerned Dy. Municipal Commissioner as to
amount of the expenses incurred in carrying out the repairs shall be final and binding
on the contractor. The Concerned Dy. Municipal Commissioner shall be entitled to
appropriate the whole or any part of the amount of the security deposit towards the
expenses, if any, incurred by him in repairing the surface.
(This will apply to a contract where the works are to be executed by the contractor
according to the specifications).
19. Clause – 18 :- Work to be open to inspection Contractor or responsible agent to
All works under or in course of execution or executed in pursuance of the contract
shall at all times, be open to the inspection and supervision of the Engineer-in-charge
and his subordinate and the Contractor shall, at all times during the usual working
hours, and at all other times at which reasonable notice of the intimation of the
Engineer-in-charge or his subordinate to visit the works shall have been given to the
Contractor, either himself be present to receive orders and instructions or have a
responsible agent duly accredited in writing present for that purpose. Orders given to
the Contractor’s duly authorised agent shall be considered to have the same force
and effect as if they had been given to the Contractor himself.
18.1 Employment of a qualified Site Engineer by the Contractor : (Vide G.R.B & CD No.
The Contractor shall employ full-time technically qualified staff during the execution of
work as under :
a. Three Project Engineer and One Construction Manager.
The Engineer so employed for the Municipal Corporation work must have
sufficient experience to handle the work independently. Such an Engineer shall
have to stay at the site of work an he shall not be entrusted with any other duty
except of this work.
In case the contractor or a partner of the contractor Firm is a Civil graduate
engineer, employment of a separate Engineer will not be necessary provided that
the Engineer partner himself attends the execution of the work on site.
Clause – 19:- Notice to give not less than five day’s notice in writing to the Engineer-
in-charge or his subordinate in charge of the work before covering up or otherwise
placing beyond the reach of measurement any work, in order that the same may be
measured and correct dimensions thereof taken before the same is so covered up or
placed beyond the reach of measurement and shall not cover up or place beyond the
reach of measurement any work without the consent in writing of the Engineer-in-
charge or his subordinate in charge of the work and if any work shall be covered up
or placed beyond the reach of measurement without such notice having been given
or consent obtained, the same shall be uncovered at the Contractor’s expense and in
default thereof, no payment or allowance shall be made for such work or for the
materials with which the same was executed.
20. Clause – 20 :
If the Contractor or his workmen, or servants shall break, deface injure or destroy any
part of the building or work in question or work in question in/on which they may be
working or any building, road, fence, enclosure or grass-land or cultivated ground
contiguous to the premises on which the work or any part-thereof is being executed
or if any damage shall be done to the work from any cause whatever before
completion of the work or before the completion of the maintenance period whichever
is later or any damage occurred / caused due to normal flood or rain or if any
imperfections become apparent in it within three months from the grant of a certificate
of completion, final or otherwise by the Engineer-in-charge the Contractor shall make
good the same at own expenses or in default, the Engineer-in-charge may cause the
same to be made good by other contractor and deduct the expenses (of which the
certificate of the Engineer-in-charge shall be final) from any sums that may thereafter
become due to the contractor or from his security deposit or the proceeds of sale
thereof or a sufficient portion thereof.
20.1 Force Majeure :
Neither party shall be to liable to the other for any loss or damage occassioned by or
arising out of acts of god, and in particular, unprecedented Floods, volcanic eruption,
earth quake or other convulsion of nature, and other acts such as but not restricted to
general strike, invasion, the act of foreign countries, hostilities or war like operations
before or after declaration of war, rebellion, military or unsurped power which prevent
performance of the contract and which could not have been for seen or avoided by a
prudent person.
NOTE : “Unprecedented flood” means the flood crossing the high flood level of the
past 50 years which is on the available record. (Modified Vide R & B D.G.R. No.
21. Clause – 21:- Contractor to supply plant, ladders, scaffolding etc., and is liable
for damage arising from non-provision of lights, fencing etc., :
The Contractor shall supply at his own cost all materials (except such special materials if
any, as may, in accordance with the contract of be supplied from the Public Works
Corporation Stores), plant, tools, appliances, implements, ladders, cordage, tackle,
scaffolding and any temporary works which may be required for the proper execution of
the work whether in the original, altered or substituted from and whether included in the
specifications, or other documents forming part of the contract or referred to in these
conditions or not and which may be necessary for the purpose of satisfying or complying
with requirements of the Engineer-in-charge as to any matter or to which under these
conditions he is entitled to be satisfied or which he is entitled to require together with
carriage therefor to and from the work. The Contractor shall also supply without charge
the requisite number of persons with the means and material necessary for the purpose
of setting out works and counting, weighing and assisting in the measurement or
examination at any time and from time to time, of the work or the materials. Failing this,
the same may be provided by the Engineer-in-Charge at the expense of the Contractor
and the expenses may be deducted from any money due to the Contractor under the
contract or from his security deposit, or proceeds of sale thereof, or of a sufficient portion
thereof. The contractor shall provide all necessary fencing and lights required to protect
the public form accident and shall also be bound to bear expenses of defense of every
suit, action or other legal proceeding at law that may be brought by any person for injury
sustained owing to neglect of the above precautions and to pay any damages and costs
which may be awarded in any such suit, action or proceedings to any such person, or
which may, with the consent of the Contractor, be paid in compromising any claim by any
21.1 The contractor shall provide suitable scaffolds, working platforms, gangways and
stairways and shall comply with the following regulations in connection therewith –
(a) Suitable scaffolds shall be provided for workmen for all work that cannot be safely
done from a ladder or by other means.
(b) (i) Under the supervision of a competent and responsible person,
(ii) Appointed by Contractor and by competent workers possessing adequate
experience in this kind of work.
(c) All scaffolds and appliances connected therewith and all ladders shall –
(i) be of sound material.
(ii) Be of adequate strength having regard to the loads and strains to which they
will be subjected and
(iii) Be maintained in proper condition.
(d) Scaffolds shall be so constructed that no part thereof can be displaced in
consequence of normal use.
(e) Scaffolds shall not be overloaded and so far as practicable the load shall be evenly
(f) Before installing the lifting gear on scaffolds, special precaution shall be taken to
ensure strength and stability of the scaffolds.
(g) Scaffolds shall be periodically inspected by a competent person
(h) Before allowing a scaffold to be used by his workman, the Contractor shall,
whether the scaffold has been erected by his workmen or not, take steps to ensure
that is complies fully with the regulations herein specified.
(i) Working platforms, gangways shall –
(i) be so constructed that no part thereof can dag unduly or unequally.
(ii) be so constructed and maintained having regard to the prevaling conditions as
to reduce as far as practicable risks of persons trippling or slipping: and –
(iii) be kept free from any unnecessary obstruction.
(j) In the case of working platforms, gangways working places and stairways at a
height exceeding 3.25 meters.
(k) Every working platform and every gangway shall be closely boarded unless other
adequate measures are taken to ensure safety.
(l) Every working platform and every gangway shall have adequate width, and very
working platform, gangway, working place and stairway shall be suitably fenced.
(m) Every opening in the floor of a building or in working platform shall, except for
the time and to the extent required to allow the access of person or the transport or
shifting of materials be provided with suitable means to prevent the fall of persons
(n) When persons are employed on a roof where there is danger of falling from a
height exceeding 3.25 meters, suitable precaution shall be taken to prevent the fall
of persons or material.
(o) Suitable precautions shall be taken to prevent persons being struck by articles
which might fall from scaffolds or other working places.
(p) Safe means of access shall be provided to all working platforms and other working
21.2 The Contractor shall comply with the following regulations as regards the Hoisting
Appliances to be used by him –
(a) Hoisting machines and tackle, including their attachments anchorages and
supports shall –
1) be of good mechanical construction, sound material and adequate strength and
free from patent defect; and
2) be kept in good repair and in working order
(b) Every rope used in hoisting or lowering materials or as a means of suspension
shall be of suitable quality and adequate strength and free from patent defect.
(c) Hoisting machines and tackle shall be examined and adequately tested after
erection on the site and before use and be re-examined in position at intervals to
be prescribed by Engineer-in-Charge.
(d) Every chain, ring, hock, shackle, swivel and pulley block used in hoisting or
lowering materials or as a means of suspension shall be periodically examined.
(e) Every crane driver or hoisting-appliance-operator shall be properly qualified.
(f) No person who is blow age of 15 years shall be in control of any hoisting machine,
including any scaffold, nor shall give signals to he operator.
(g) In the case of every hoisting machine and of every chain, ring hook, shackle,
swivel and pulley block used in hoisting or lowering or as a means or suspension,
the safe working load shall be ascertained by adequate means.
(h) Every hoisting machine and all gears referred to in proceeding regulation shall be
plainly marked with the safe working load.
(i) In the case of hoisting machine having a variable safe working load, each safe
working a load and conditions under which it is applicable shall be clearly
(j) No part of any hoisting machine or any gear referred to in regulation ‘g’ above shall
be loaded beyond the safe working load except for the purpose of testing.
(k) Motors, gears, transmissions, electric wiring and other dangerous parts of hoisting
appliance shall be provided with sufficient safeguards.
(l) Hoisting appliances shall be provided with such means as will reduce to a
minimum the risk of the accidental descent of the load.
(m) Adequate precautions shall be taken to reduce to minimum the risk of any part of a
suspended load becoming accidentally displaced.
22. Clause – 22:- Measures for Prevention of Fire :
The Contractor shall not set fire to any standing jungle, trees, bush wood or grass
without a written permit from the Engineer-in-charge.
When such permit is given, and also in all cases when destroying cut or dug up tress,
bush wood, grass etc., by fire, the Contractor shall take necessary measures to prevent
such fire spreading to or other-wise damaging surrounding property.
23. Clause – 23:- Liability of Contractors for any damages done in or outside work
Compensation for all damage done intentionally or unintentionally by contractors
labourers whether in or beyond limits of Municipal Corporation property including any
damage caused by the spreading of fire mentioned in the clause 22, shall be estimated
by the Engineer-in-charge, or such other officer as he may appoint, and the estimates of
the Engineer in charge, subject to the decision of the Concerned Dy. Municipal
Commissioner, on appeal, shall be final and the Contractor shall be bound to pay the
amount of the assessed compensation on demand, failing which the same will be
recovered from the Contractor as damages in the manner prescribed in clause 1 or
deducted by the Engineer-in-Charge from any sums that may be due or become due
from Municipal Corporation to the Contractor under this contract or otherwise.
The contractor shall bear the expenses of defending any action or other legal
proceeding that may be brought by any person for injury sustained by him owing to
neglect of precautions to prevent the spread of the fire and he shall also pay the
damages and cost that may be awarded by the court in consequences.
24. Clause – 24:- Deleted.
25. Clause – 25:- Deleted.
26. Clause – 26:- Work not to be sublet. Contract may be rescinded and security
deposit forfeited for subletting it without approval or for bribing a public officer
or if contractor becomes insolvent :
The contract shall not be assigned or sublet without the written approval of the
Engineer-in-charge. And if the contractor shall assign or sublet his contract or attempt
to do so or become insolvent or commence any proceeding to get himself be
adjudicated an insolvent or make any compromisation with his creditors, or attempt of
do so, the Engineer-in-charge may, by notice in writing rescind the contract. Also if
any bribe, gratuity, gift, loan, perquisite, reward or advantage, pecuniary or otherwise,
shall either directly or indirectly be given, promised or offered by the contractor, or any
of his servants or agents to any public officer or person in the employ of Municipal
Corporation in any way relating to his office or employment, or if any such officer or
person shall become in any way directly or din directly interested in the contract, the
Engineer-in-Charge may thereupon by notice in writing rescind the contract. In the
event of contract being rescinded, the security deposit of the Contractor shall
thereupon stand forfeited and be absolutely at the disposal of Municipal Corporation
and the same consequences shall ensue as if the contract had been rescinded under
clause 3 hereof and in addition the Contractor shall not be entitled to recover or be
paid for any work thereof actually performed under the contract.
27. Clause – 27:- Sum payable by way of compensation to be considered as
reasonable compensation without reference to actual loss :
All sums payable by a Contractor by way of compensation under any of these
conditions shall be considered as a reasonable compensation to be applied to the use
of Municipal Corporation without reference to the actual loss or damage sustained and
whether any damage has or had not been sustained.
28. Clause – 28:- Changes in the constitution of firm to be notified :
In the case of a tender by partners, any changes in the constitution of a firm shall be
forthwith notified by the contractor to Engineer-in-Charge for his information.
29. Clause – 29:- Works to be under directions of Concerned Dy. Municipal
All works to be executed under the Contract shall be executed under the direction and
subject to the approval in all respects of the Concerned Dy. Municipal Commissioner of
the Circle for the time being, who shall be entitled to direct at what point or points and
in what manner they are to be commenced and from time to time carried on.
30. Clause – 30:- Dispute referred to Court of law :
The disputes relating to this contract, so far as they relate to any of the following
matters, whether such disputes arise during the progress of the work or after the
completion or abandonment thereof, shall be referred to the court of law
(i) The rates of payment under clause 5 for any tools, materials and stores in or upon
the works of the site thereof or belonging to the contractor or procured by him and
intended to be use for execution of the work or any part thereof of which
possession may have been taken by the Engineer-in-Charge under the said
(ii) The reduction in rates made by the Engineer-in-Charge, under clause 9 for the
items of work not accepted as completed fully in accordance with the sanctioned
specifications.
(iii) The rates of payment for any class of work which is included in the additional or
altered work carried out by the Contractor in accordance with the instructions of the
Engineer-in-Charge under clause 14 and the rate for which is to be determined
under the said clause
(iv) The rates of payment for materials already purchased or agreed to be purchased
by the Contractor before receipt of notice given by the Engineer-in-Charge under
clause 15, and / or the amount of compensation payable to the Contractor under
the said clause for loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under
clause 17 in the event of his failure to rectify, remove or reconstruct the work within
the period specified in the written intimation or the amount of expenses incurred by
the Engineer-in-Charge under the said clause 17 in rectifying, removing, or re-
executing the work or in removing and replacing the materials or articles
(vi) The reduction of rates as may be fixed by the Engineer-in-Charge under clause
for the inferior work or materials as accepted or made use of.
(vii) The amount of compensation payable by the Contractor for damages as estimated
and assessed under clause
(viii) The amount payable to the Contractor for the work carried out under clause 33 in
accordance with the instruction and the requirement of the Engineer-in-Charge in a
case where there is no specifications.
(ix) The disputes will be referred to court of law and its jurisdiction will be Ahmedabad.
(x) In case of dispute leading to the contractor or Municipal Corporation approaching
to Court of Law, it shall be within the jurisdiction where the site of work is situated.
(xi) The reference to court proceeding under this clause shall not:
i) affect the right of the Engineer in charge under clause 5 to take possession of all or
any tools, plants, materials and stores in or upon the works of site thereof
belonging to the contractor or procured by him and intended to be used for the
execution of the work or any part thereof.
ii) Preclude the Engineer in charge from utilising the materials purchased by the
contractor in any work or from removing such materials to other places, during the
period the work is stopped or suspended in pursuance of notice given to the
contractor under clause
iii) Entitle the contractor to stop the progress of the work or carrying out the additional or
altered work in accordance with the provisions of clause 14 or as the case may be, of clause
31. Clause – 31:- Deleted.
32 .Clause – 32:- Lump sums in estimates :
When the estimate on which a tender is made includes lump sum in respect of part of
the work, the contractor shall be entitled to payment in respect of the items of work
involved or the part of the work in question at the same rates as are payable under
this contract for such items or if the part of the work in question is not in the opinion of
the Engineer-in-charge capable of measurement, the Engineer-in-Charge may, as his
discretion, pay the lump sum amount entered in the estimate and the certificate in
writing of the Engineer-in-charge shall be final and conclusive against the Contractor
with regard to any sum or sums payable to him, under the provisions of this clause.
The Contractor shall arrange to construct, maintain and afterwards remove and
reinstate any temporary access required for and in connection with the execution of
the works. Reinstatement shall include restoring the area of the access route to at
least the degree of safety, stability, drainage and appearance that existed before the
Contractor entered the site. Action where no specifications of work for which there is
no such specification, such work shall be carried out in accordance with the IS
specifications, and in the event of there being no IS Specifications, then, in such case
the work shall be carried out in all respects in accordance with the instructions and
requirements of the Engineer-in-Charge.
33. Clause – 33:- Action where no specifications :
In case of any class of work for which there is no such specification, such work shall
be carried out in accordance with the IS specifications, and in the event of there being
no IS Specifications, then, in such case the work shall be carried out in all respects in
accordance with the instructions and requirements of the Engineer-in-Charge.
34. Clause – 34:- Definition of work :
The expression “work” or “works” where used in these conditions shall, unless, there
be something in the subject or context repugnant to such construction, be construed to
mean the work, or the works, contracted to be executed under or in virtue of the
contract, whether temporary or permanent and whether original, altered, substituted or
35. Clause – 35:- Contractor’s percentage whether applied to net or gross amount of
Percentage referred to in the tender shall be deducted from / added to the gross
amount of the bill before deducting the value of any stock issued. (This clause shall be
Applicable only for B-1 tender) –
36. Clause – 36:- Non-refund of quarry fees and Royalties :
The contractor shall pay the royalty to the competent authority/local body as per rules.
The contractor shall furnish quarterly the statement showing quantity of quarried
materials from whom purchased (with full address of the seller) and copies of bill for
purchase to the district officer of the Geology and Mining Corporation or authority
competent to levy royalty in the area of work. Copy of such statement shall be
furnished to the Engineer in charge also. Contractor shall also furnish such additional
information as regards royalty payment of the Engineer in charge and the Royalty
authority. The royalty charges paid shall be borne by the Contractor and shall not be
reimbursed by the Ahmedabad Municipal Corporation (Authority :- R & BD. Circular
37. Clause – 37:- Compensation under the Workmen’s Compensation Act :
The Contractor shall be responsible for and shall pay any compensation to his
workman payable under the Workmen’s Compensation Act, 1923 ( VIII of 1923)
(hereinafter called the said ACT) for injuries caused to the workmen. If such
compensation is paid by Municipal Corporation as principal under sub-section 12 (1) of
the said Act, on behalf of the Contractor, it shall be recoverable by the Municipal
Corporation from the Contractor under sub-section 12 (2) of the said section. Such
compensation shall be recovered in the manner laid down in clause 1 above.
37.1 The Contractor shall be responsible for and shall pay the expenses of providing
medical aid to any workmen who may suffer a bodily injury as a result of an accident.
If such expenses are incurred by Municipal Corporation, the same shall be
recoverable from the Contractor forthwith and be deducted, without prejudice to any
other remedy of Municipal Corporation, from any amount due or that may become
due to the Contractor.
37.2 The Contractor shall provide all necessary personal safety equipment and first-aid
apparatus available for the use of the persons employed on the site and shall
maintain the same in suitable condition for immediate use at any time and shall
comply with the following regulations in connection therewith :
(a) The workers shall be required to use the equipment so provided by the
Contractor and the Contractor shall take adequate steps to ensure proper use of
the equipment by those concerned.
(b) When work is carried out in proximity to any place where there is a risk of
drowning all necessary equipments shall be provided and kept for use and all
necessary steps shall be taken for the prompt rescue of any person in danger.
(c) Adequate provision shall be made for prompt first-aid treatment of all injuries
likely to be sustained during the course of the work.
38. Clause – 38:-
The Quantities shown in the tender are approximate and no claim shall be entertained
for qualities of work executed being less than those entered in the tender. In the case
of increase in the quantities by more than 30 %, the new rate will be paid to the
Contractor for the quantities in excess of 30%. The rates for the increased quantities
as aforesaid will be fixed in the manner specified in clause –
39. Clause – 39:- Employment of famine or other labour :
The Contractor shall employ any famine, convict or other labour of particular kind or
class, if ordered in writing to do so by the Engineer-in-charge.
40. Clause – 40:-
No compensation shall be allowed for any delay caused in the staring of the work on
account of delay in making available the full site of land at a time.
41. Clause – 41:- Claim for compensation for delay in the execution of work
No compensation shall be allowed for any delay in execution of the work on account of
water standing in borrow-pits or compartments. The rates are inclusive of hard or
cracked soil, excavation in mud, sub-soil water or water standing in borrow-pits and no
claim for an extra rate shall be entertained unless otherwise expressly specified.
42. Clause – 42:- Entering upon or commencing any portion or work:
The contractor shall not enter upon or commence any portion of work except with the
written authority and instructions of the Engineer-in-charge or of his subordinate in
charge of the work. Failing such authority, the contractor shall have no claim to ask for
measurements of or payment for work.
43. Clause – 43:- Minimum age of person employed :
No contractor shall employ any person who is under the age of 14 years.
43.1 : The employment of donkeys and/or other animals and the payment of fair wages :
(i) For asphalt work(s), as far as possible only the adult persons should be employed
on Corporation OR the contracted work as the case may be. If the adult persons
are not available, then the children below the age of 15 (Fifteen years) should not
be employed under any circumstances.
(ii) No contractor shall employ donkeys or other animals with breeching of string or
thin rope. The breeching must be atleast three inches wide and should be of tape
(iii) No animal suffering from sores, lameness or emaciation or which is immature shall
be employed on the work.
(iv) The Engineer-in-Charge or his agent is authorised to remove from the work any
person or animal found working which does not satisfy these conditions and no
responsibility shall be accepted by Municipal Corporation for any delay caused in
the completion work by such removal.
(v) The Contractor shall pay fair and reasonable wages to the workmen employed by
him in the contract undertaken by him. In the event of any dispute arising between
he contractor and his workmen on the grounds that the wages paid are not fair and
reasonable, the dispute shall be referred without delay to the Engineer – in –
charge who shall decide the same. The decision of the Engineer – in – charge
shall be conclusive and binding on the Contractor, but such decision shall not in
any way affect the conditions in the contract regarding the payment to be made by
Municipal Corporation at the sanctioned tender rates.
(vi) The Contractor shall provide drinking water facilities to the workers / labourers
employed on Municipal Corporation works. Amenities relating to sanitation shall
also be provided to the workers / labourers employed on works (in urban areas). If
the contractor fails to comply with these provisions, the Engineer - in - charge shall
give notice in writing and if the contractor does not provide this facility to the
workers /labourers within a period of ten days from the date of the notice in writing,
the Engineer in charge shall there upon make the arrangement for drinking water
at the cost of the Contractor.
(vii) The Contractor shall provide the amenity of proper shade and shelter to the
workers / labourers and their children on Municipal Corporation works as soon as
the work starts. If the Contractor fails to provide shed and shelter, the Engineer-in
– charge shall provide the same at the cost of Contractor.
44. Clause – 44:- Method of payment :
Payment to Contractor shall be made by cheque drawn on any treasury, accounts
department of corporation, provided the amount exceeds Rs. 10. Amount not exceeding
Rs. 10 will be paid in cash.
44.1 : Any sum of money due and payable to the Contractor (including the security
deposit returnable to the Contractor) executing any Municipal Corporation work under
this contract shall be appropriated by Municipal Corporation and shall be set off against
any claim of the Municipal Corporation for the payment of a sum of money arising out or
under any other contract made by the Contractor with the Municipal Corporation. When
no such amount for purpose of the recovery from the Contractor against any claim of
the Municipal Corporation is available, such a recovery shall be made from the
Contractor as arrears of land revenue.
45. Clause – 45:- Deleted
46. Clause – 46:- Employment of scarcity labour :
If Municipal Corporation declares a state of scarcity or famine to exist in any village
situated within 16 kilometers of the work, the Contractor shall employ upon such parts of
the work, as are suitable for unskilled labour, any person certified to him by the
Engineer in charge or by any persons to whom, the Engineer in charge may have
delegated this duty in writing to be in need of relief and shall be bound to pay to such
persons, wages not below the minimum which Municipal Corporation may have fixed in
this behalf. Any disputes which may arise in connection with the implementation of this
clause shall be decided by the Engineer in charge whose decision shall be final and
binding on the Contractor.
47. Clause – 47:- Deleted
48. Clause – 48:-
The rates to be quoted by the Contractor must be inclusive of sales tax. No extra
payment on this account will be made to the Contractor.
49. Clause – 48:-
The Contractor should as far as possible, obtain his requirement of labourers, skilled
and unskilled, from the nearest Employment Exchange so as to utilise the local
employment potential. If there are no local Employment Exchanges or such Exchanges
are not able to provide the required labourers locally. Suitable labourers should be
utilised to the maximum extent possible.
50. Clause – 50:- Fair Wages :
If the Contractor fails to pay within 7 (Seven) days to the labourer(s) / worker (s) the
minimum wages prescribed by the Corporation under the minimum wages Act, 1948 as
in force from time to time, the Engineer in charge shall be at liberty to deduct the
amount payable to the labourer(s) worker(s) from his (Contractor’s) bills or deposit(s)
payable by the Contractor after making due inquiries and establishing the claim(S) of
the labourers(s) worker(s). The Contractor shall not be entitled to any payment or
compensation on account of any loss that the Contractor may have to incur on account
of the action as aforesaid. Before the action as aforesaid, is enforced, a notice in
writing to the Contractor shall be issued by the Engineer-in-charge to pay the wages as
per Minimum Wages Act in force at the relevant time. If contractor does not act as
aforesaid within seven days, then the action contemplated as above shall be taken
51. Clause – 51:- Deleted
52. Clause – 52:- List of Machinery :
The Contractor shall also give a list of machineries in his possession and which he
propose to use on the work.
(i) In case, the roller deployed by Corporation for the use on contract work is kept idle by
the Contractor for want of adequate labour and materials, the Contractor will have to
pay rental charges as per prevailing rules even through the items of rolling and
watering are to be carried out by the Corporation.
(ii) If the Contractor does not plan his programme so as to suit the requirement of the
Municipal Corporation, the proportionate rental charges on roller shall have to be
recovered from the Contractor.
54. Clause – 54 :- Local labour on normal rates :
The Contractor shall have to engage local labour and person seeking employment
where available on normal rate.
55. Clause – 55:- Deleted
56. Clause – 56 :-
The Contractor shall employ only such labour who shall produce a valid certificate of
having been vaccinated against small pox within a period of last three years.
The Contractor shall build a sufficient number of huts on a suitable plot of land for the use
of the labourers according to the following specifications :
(i) Huts of bamboos and grass may be constructed.
(ii) A good site shall be selected, high ground removed from jungle but well provided
with trees shall be chosen wherever it is available. The neighborhood of rank
jungle, grass or weeds should particularly be avoided; camps should not be
established close to large cuttings of earth work.
(iii) The lines of huts shall have open spaces of atleast 10 m. between rows, When a
good natural site can not be procured, particular attention should be given to the
(iv) There should be no over crowding, Floor spaces at the rate of 2.8 sq.m. per head
shall be provided. Care should be taken to see that the huts are kept clean and in
(v) The Contractor must find out his own land and if he wants Corporation land, he
should apply for it and pay assessment for it.
(2) Drinking Water :
The Contractor shall, as far as possible, provide an adequate supply of chlorinated pure
potable drinking water for the use of labourers. This provision shall be at the rate of not
less than 45 liters per head, no provision need be made where there is a suitable nalla,
river or well within 0.4 km. of the camp. However arrangement should, as far as
possible, be made to chlorinate water by chlorin tablets before it is allowed for drinking
(3) The Contractor shall construct semi permanent latrines for the use of labourers
on the following scale, namely :
a) Where females are employed, there shall be least one latrine for every 25 females.
b) Where males are employed, there shall be at lease one latrine for every
males.Provided that where the number of males or females exceed 100, it shall be
sufficient if there is one latrine for every 25 males or females, at the case may be,
upto the first 100 and one for every 50 thereafter.
(4) Privacy in latrines :
Every latrine shall be under cover and so partitioned off as secure privacy, and shall
have a proper door and fastenings.
(5) Notice to be displayed outside latrines and urinals :
(1) Where workers of both sexes are employed, there shall be displayed outside
each block of latrine and urinal a notice in the language understood by the
majority of the workers “For Men only” or “For Women only”: as the case may be.
(2) The notice shall also bear the figures of a man or of a woman, as the case may
There shall be atleast one urinal for male workers upto 50 and the for female workers
upto 50 employed at a time. Provided that there where the number of male or female
workmen, as the case may be exceeds 500, it shall be sufficient if there is one urinal
for every 50 males or females upto the first 500 and one for every 100 males or
females or part thereof.
(7) Latrines and Urinals to be accessible :
(1) The latrines and urinals shall be conveniently situated and accessible to workers at
all times at the establishment. (2) (i) The latrines and urinals shall be adequately
lighted and shall be maintained in a clean and sanitary condition at all time (2) (ii)
Latrines and urinals other than those connected with a flush sewage system shall
comply with the requirements of the Public Health Authorities.
(8) Water for latrines and urinals :
Water shall be provided by means of tap of otherwise, so also be conveniently
accessible in or near the latrines and urinals.
(9) Bathing and washing places :
1. The Contractor shall construct a sufficient number of bathing places, every unit of
20 persons being provided with a separate bathing place.
2. Washing places should also be provided for the purpose of washing clothes.
Every unit of 30 persons shall have atleast one washing place.
3. Such bathing and washing places should be suitably screened and separate
places provided for male and female workers.
4. Such facilities shall be conveniently accessible and shall be kept in clean and
(10) Drainage :
The Contractor shall make sufficient arrangements for draining away the sewerage
water as well as water form the bathing and washing places and shall dispose of this
waste in such a way as not to cause nuisance. The Contractor should obtain a
permission form the Gujarat Water Pollution Control Board, Gandhinagar, if water is to
be drained in river or near the well. The Contractor would put material oil once in a
week in stagnant water round about the residence.
(11) Medical facilities :
The Contractor shall engage a medical officer with a travelling dispensary for a camp
having 500 or more persons if there is no Municipal Corporation or other private
dispensary situated with 6 Km. form the camp.
(12) Conservancy and cleanliness :
The Contractor shall provide the necessary staff for effecting the satisfactory
conservancy and cleanliness of the camp to the satisfaction of the Engineer in charge.
Atleast one sweeper per 200 persons should be engaged. Conservancy staff should
dump refuge in compost pit, away from the labour camp.
(13) Health Provisions :
The Health Officer of the Municipal Corporation of Health Services shall be
consulted before opening a labour camp and his instructions on matters, such as,
the water supply, sanitary convenience, the camp-site, accommodation and food
supply shall be followed by the Contractor.
(14) Precautions against epidemic :
(a) The authorities in charge of the colonies should get the labourers inoculated against
cholera and plague and vaccinated against smallpox at the time of recruitment, if
they are not inoculated or vaccinated within 6 months or 3 years respectively, prior
to the date of recruitment.
(b) When, in any labour camp, there is a outbreak of an epidmic disease or is
threatened with such an outbreak, the authorities in charge of the labour camps,
should ensure that all the inmates of the labour colonies are inoculated or
vaccinated, at the case may be, depending on the diseases, with 72 hours after the
(c) The authorities in charge of the labour colony should arrange to communicate by
wire regarding the outbreak of the epidemic diseases on the very day of the
outbreak, to the Health Officer of Municipal Corporation in charge of that area.
Thereafter they should continue to send daily reports to the above officers in the
prescribed form regarding the progress of the epidemic disease.
(d) When the authorities in charge of the labour colony suspect or have reason to
believer that any in mate of the labour colony it suffering form the infections or
contagious disease, they shall forthwith arrange for the segregation of such persons
to isolated huts to be specifically provided for the purpose and also for their
(e) As regional malaria epidemic outbreaks are likely to occur in such project areas, the
authorities in charge of the labour colonies should report promptly the occurrence of
unusual incidence of cases of malaria and also inform the Health officers of the
Municipal Corporation and also arrange to institute all necessary anti-malarial
measures as may be advised by the officials of the Public Health Corporation.
(f) The authorities in charge of the colonies should also arrange to carry out any other measures
that may be recommended by the officials of the Public Health Corporation necessary to
prevent or control the spread of disease.
58. Clause 58:-
Contractor shall have to arrange for the supply of gumboots, hand gloves, mask etc.,
invariably to the labourers/workers engaged by the Contractor on asphalt work.
59. Clause – 59:-
The Contractor shall not show any distinction between Harijan and other class of
labourers/ workers employed to carry out the Municipal Corporation work.
60. Clause – 60:- Price Variation clause :
No Price escalation shall be given to contractor at any instance.
61. Clause – 61:- Fencing and Lighting :
(a) The Contractor shall, unless otherwise specified, be responsible for the proper
fencing, lighting, grading and taking of the necessary safety measures for all works
comprised in the contract and for the proper provision of temporary road, way, foo-
ways, guards, fences, caution notices etc., as the same may be rendered necessary
by reasons of the work for the accommodation of workmen, foot passengers or other
traffic and of owners and occupiers of adjacent property and the public and shall
remain responsible for any accidents that may occur on account of his failure to take
proper & timely precautions.
(b) All the arrangements made for fencing and lighting shall be maintained by the
Contractor throughout the currency of the contract till the physical taking over of the
work by Municipal Corporation.
62. Clause – 62:- Liability of accidents to persons :
Responsibilities and liabilities of the contractor under Workmen’s Compensation Act.
(a) On the occurrence of an accident, which results in death of workmen employed by the
contractor or which is so serious as is likely to result in death of any such workmen,
the Contractor, shall within 24 hours of happening of such accident(s) intimate, in
writing, to the Engineer in charge the fact of such accident(s). The contractor shall
indemnify Municipal Corporation against all loss or damage sustained by the Municipal
Corporation resulting directly form his failure to give intimation in the manner aforesaid
including the penalties or fines, if any, payable by the Municipal Corporation as
consequence of Municipal Corporation’s failure to give notice under the Workmen’s
Compensation Act or otherwise to conform to the provisions of the said Act in regard
to such accidents(s).
(b) In the case of an accident, in respect of which compensation may become payable
under Workmen’s Compensation Act, whether by the Contractor or by the Municipal
Corporation as principal Employer, it shall be lawful for the Engineer-in-charge to
retain out of money due and payable to the Contractor , such sum or sum of money
as may, in the opinion of the Engineer in charge, be sufficient to meet such a liability.
The opinion of the Engineer in charge shall be final in regard to all matters arising
under this clause.
63. Clause – 63:- Access to site and work on site :
The Engineer may, if he considers fit from time to time, enter upon any land(s), which
may be in possession of the Contractor this contract for the purpose of executing any
work not included in this contract and may execute such work not included in this
contract by agent or by other Contractors, at his opinion and the Contractor shall, in
accordance with the requirements of the Engineer-in-charge, afford all reasonable
facilities for execution of the work including occupation of lands by structure or
otherwise for any other contractor employed by the Municipal Corporation and his
workmen or for the workmen of the Municipal Corporation who may be employed in
the execution on or near the site of the work not included in the contract or of any
contract in connection with or ancillary to the work and in default, the Contractor shall be
liable to the Municipal Corporation for any delay or expense incurred by reason of such
default. Provided always that if the exercise of these powers shall cause any damage
to the contract, he may, within fifteen days of such damage arising, make a statement of
the same to the Engineer in charge who shall, from time to time, assess the value in his
judgement of such damage and the Municipal Corporation shall form time to time pay to
the Contractor the amounts (if any) accepted as justified by the Engineer in charge.
64. Clause – 64:- Reports regarding labour :
The contractor shall submit the following reports to the Engineer in charge.
(i) A daily report in the from as may be prescribed of the strength of labour both skilled
and unskilled employed by him on the work(s). The contractor shall increase or
decrease the strength, both skilled or unskilled, if directed by the Engineer in charge.
The submission of such report shall not, however, relieve the contractor of his
responsibilities and duties regarding progress or any other obligations under the
(ii) A classified weekly return in the prescribed form of the number of persons employed
on the works during the preceeding week.
(iii) A weekly medical report in the prescribed form showing the health of the
Contractor’s camp, the number of persons ill or incapacitated and the nature of their
(iv) A report of any accident, which may have occurred, to be sent within 24 hours of the
(iv) Such other reports as may be prescribed.
65. Clause – 65:- Treasure trove :
In the event of discovery by the Contractor or his employees, during the progress of
work of any gold, silver, oil or other minerals of any description and precious stones,
treasures, coils, antiquities, relic fossils or other articles or value of interest whether
geological, archaeological or any other such treasure & other things shall be deemed
to be absolute property of the Municipal Corporation and the Contractor shall duly
preserve the same to the satisfaction the Engineer in charge, from time to time, and
deliver the same to such persons as the Engineer in charge may appoint.
The Contractor shall take all reasonable precautions to prevent his workmen or any
other person form removing or damaging any such articles or thins, immediately after
the discovery thereof and before removal acquaint Engineer in charge with such
discovery and carry out his orders for the disposal of the
66. Clause – 66:- Same.Indemnity :
The Contractor shall identify the Municipal Corporation against all actions, suits claims
& demands through or made against the Municipal Corporation in respect of work of
this contract and against any loss or damage to Corporation in consequence of any
action or suit being brought against the contractor for anything done or omitted to be
done in execution of the work of this contract.
67. Clause – 67:- Insurance of labourers :
The Contractor shall be responsible to arrange for insurance of all labourers. Skilled
and unskilled, workers, supervisors etc., employed by him as per labour regulations of
68. Clause – 68:- Setting out :
The Contractor shall be responsible for the true and proper setting out of the works
and the correctnessof positions, levels, dimensions and alignments of all parts of the
work and for the provisions of all necessary instruments, appliance and labour in
connection therewith. If, at any time, during the progress of the work, any errors,
appear or arise in the positions, levels, dimensions or alignments of any part of the
work, the Contractor, on being required to rectify such errors by the Engineer in
charge shall at his own expense do so to the satisfaction of the Engineer in charge, if
however, such error is based on incorrect data supplied in writing by the Engineer in
charge, the expense of rectifying the same shall be borne by the Corporation. The
checking of and setting out of any line or level by the Engineer in charge or his
representative shall not in any way, relieve the contractor of his responsibilities for the
correctness of the error. The Contractor shall carefully protect and observe all bench
marks, site nails, pags and other thins used in setting out of the work(s).
69. Clause –69:- cement register :
A register in the prescribed form showing day to day receipt, consumption and
balance of cement on site of work will be maintained by the Municipal Corporation,
which shall invariably be signed daily by the Contractor or his authorized representative
in token of its correctness.
70. Clause – 70:- Materials and works test register :
A register in the prescribed Performa showing test result of materials and work tests
will be maintained at the site of work by the Corporation and ever entry thereof shall
invariably be signed by the Contractor or his authorised representative in token of its
71. Clause – 71:- Progress schedule :
The Contractor shall furnish, within one month (unless extended by the Engineer in
charge) of the order to start the work, the progress schedule in quadruplicate
indicating the date of starting, the monthly progress expected to be achieved and the
anticipated completion date of each major item of work to be done by him, also
indicating dates of procurement and setting up the materials plants and machinery.
The Schedule should include a statement of proposed general and detailed
arrangements for carrying out works and of time, order and manner in which it is
proposed that these shall be executed. The schedule should be farmed keeping
requirements of the clause 2 of Tender form in view and be such as in practice to the
achievement towards completion of the work in the time limit and of the particular items
on the dates specified in the contract and shall have the approval of the Engineer in
charge. Further, the dates for the progress, as in this schedule shall be adhered to.
(a) In case it is found necessary, at any stage, to alter the schedule, the Contractor shall
submit in good time. A revised schedule incorporating necessary modifications
proposed and get the same approved from the Engineer - in – charge is further
empowered to ask for more detailed schedule or schedules, say, week by week, for
any item or items and the Contractor shall supply the same as and when asked for.
(b) The Engineer in charge shall have, at all times, the right, without in any way vitlating
this contract forming grounds for any claim, to alter the order of the work or any part
thereof and the Contractor shall also revise the progress schedules accordingly and
submit four copies of the revised schedule to the Engineer - in – charge within seven
days of the said Engineer’s direction to alter the order of works.
(c) The Contractor shall furnish sufficient plant, equipment and labour and shall work
such hours and shifts as may be necessary to maintain the progress of the work as
per approved progress schedule. The working and shift hours shall comply with all
Corporation regulations in force and shall be such, as may be approved by the
Engineer - in – charge and the same shall not be varied without the prior approval of
Engineer - in – charge.
(d) The Contractor shall from time to time, as may be required by the Engineer - in –
charge, furnish the Engineer - in – charge with a statement in writing of the
arrangements he proposes to adopt for the execution of this contract and the
Engineer - in – charge may, if he considers necessary at any time advise alteration
in the same, which the Contractor shall adopt on notice thereof.
(e) The progress schedule(s) shall be in the form of progress chart, forms, statements
and/or reports as may be approved by the Engineer - in – charge.
(f) The approval of the progress schedules by the Engineer - in – charge shall not
relieve the Contractor of any of his duties and responsibilities under the contract.
The adoption of any modification in the schedule required by the Engineer - in –
charge shall not entitle the Contractor to any extra payment.
72. Clause – 72:- Secured advance to contractor : Deleted
73. Clause – 73:- Advance payment : Deleted
74. Clause – 74:- Advance against machineries : Deleted
75. Clause – 75:- Mobilisation advance : Deleted
76. Clause – 76:- Deleted
77. Clause – 77:- Deleted
78. Clause – 78:- Deleted
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
B3:- ADDITIONAL GENERAL CONDITIONS
TAXES AND DUTIES ON INDIGENOUS MATERIAL
1. All charges on account of Octroi, Terminal Entry Tax, Sales Tax, Excise Duty, etc and
other duties on indigenous material obtained for the works from any source shall be
borne by the contractor (subject to provisions made in the tender). As per the
amendment of Sales Tax Act which came into force from Aug. 1985, Sales Tax on
Works Contracts shall be paid by the Contractor and no reimbursement will be made by
the Municipal Corporation for the same.
2. RATES FOR EXTRA ITEM
In case of any circumstances contractor shall responsible for executing any extra item
as directed by engineer in charge. Rate of the extra item shall be as per general
guideline in the condition of the contract and general rules in the R & B department.
3. FINANCIAL BID
Financial bid should not contain any condition or enclosures except the quoted rates
against each item and the total amount for the work.
against each item and the total amount for the work.
4. BILLS TO BE SUBMITTED MONTHLY
For the works costing above Rs. 10,00,000. Payment will be made once in month.
However, another payment will be made as desired by contractor and as agreed by
AMC the amount of R.A. Bill shall be minimum Rs. 50,00,000/- (including cost of
5. MATERIAL TESTING
Necessary material testing shall be carried out by contractor at AMC laboratory at his
own cost as directed by Engineer-in-charge. The material testing fee at the rate 0.5%
shall be deducted from every running bill of the contractor. This does not relieve
contractor from his contractual obligations of making all the arrangements for taking
samples during each concreting, curing for the specified period as per specifications,
bring to the laboratory and keeping the necessary records as directed. At the time of
final bill, the amount deducted from each running bill shall be adjusted with the actual
material testing fees and the balance amount, if any will be refunded to or recovered
from the contractor.
6. CHILD LABOUR
The contractor shall not employ any child below 14 years of age. It is prohibited by Child
Labour Prohibition and Regulation Act. 1986. Honorable Supreme Court has given
guidelines and as per those guidelines, if child labour is employed on the work site, the
contractor shall have to deposit Rs. 20000 (Rupees Twenty Thousand Only) in the child
labour welfare fund. If the contractor refuses to deposit this sum, then the action will be
taken for contempt of Supreme Court Judgement and also will be Prosecuted by the
concerned authority. In case of provision of Child Labour Prohibition and Regulation
Act,1986 by the contractor and to that Municipal Corporation shall recover the amount
from the contractor.
I / We hereby do certify that I/We have taken the above “Additional General & Technical
Conditions” into account while bidding and have quoted our firm price accordingly.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
(The Appendix forms part of the Bid. Bidders are required to fill up all the blanks in the
Name of the contract: Percentage Rate Contract For Work of
Municipal Commissioner
Ahmedabad Municipal Corporation
1. Having examined the Conditions of Contract, Specifications, Bill of Quantities,
for the execution of the above named works. we, the undersigned, offer to execute
and complete such works and remedy any defects therein in conformity with the
Conditions of Contract, Specifications, Bill of Quantities.
2. We acknowledge that the Appendix to Bid forms part of our Bid.
3. We undertake, if our Bid is accepted, to commence the Works on Site within the
period of three days of an order of the Engineer’s notice to commence, and to
complete and deliver the sections and the whole of the Works comprised in the
Contract within the period stated in engineer's order or Mutual agreement between
AMC and my / our company.
4. If our Bid is accepted, we will furnish Performance Security (ies) in the form of Bank
Guarantee(s) to be jointly and severally bound on us in accordance with the
Conditions of Contract.
5. We agree to abide by this Bid for the period of one hundred and twenty (120) days
after the date of bid opening, and it shall remain binding upon us and may be
accepted at any time before the expiry of that period.
6. Unless and until a formal Agreement is prepared and executed, this Bid, together
with your written acceptance thereof, shall constitute a binding contract between us.
7. We understand that you are not bound to accept the lowest or any Bid you may
8. All the partners of our Joint Venture are legally and severally bound by this Bid.
9. Municipal Commissioner, Ahmedabad has right to reject any or all bids without
giving any reason.
Dated this ____________ day of _______________
in the capacity of __________________ duly authorised2 to sign Bid for and
Address (in block capitals)
Name of Witness
Occupation of the Witness
Address of Witness
Signature of Witness
1. To be deleted if the bidder is not a Joint Venture.
2 Certified copy of Power of Attorney/Authorisation for signature shall be furnished by the
Bidder in accordance with Clause 20 of Instruction to Bidders (Section I).
FORM OF BID SECURITY (BANK GUARANTEE)
(Here inafter called the Tenderer) is desirous and preferred to tender for works in
accordance with the terms and conditions of tender for the work of
1. We hereby affirm that we are guarantors on behalf of the Tenderer up to total
Rs. (in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad
Municipal Corporation, Ahmedabad Specified tip to his first written demand, without
demur, without delay and without the necessary of a previous of judicial or administrative
procedures and without the necessity to prove to the Bank the defects or short comings or
debits of the contractor any sum within the limit of
2. We further agree that the Guarantee herein contained shall remain in full force and effect
during the period that would be taken for the acceptance of the tender.
However unless a demand of claim under this guarantee is made on it in writing on or
before the (Date to be specified will not be less than 120 days from the stipulated date of
receiving the tender) we shall be discharge from all liabilities under the guarantee
3. We undertake not to revoke the guarantee during it currency except without consent of
the Municipal Commissioner, Ahmedabad Municipal Corporation in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the
Tenderer or of the Bank.
Signature & Seal of Guarantor ...........................
5. The contractor shall have to furnish an income tax clearance certificate before his tender
is accepted and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
7. List of approved banks - Attached in Bid doccuments.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
FORM OF AGREEMENT
THIS AGREEMENT made the ____ day of _______, 2018 between Ahmedabad
Municipal Corporation ………………..(here in after called “the Employer”) of the one part
Contractor”) of the other part.
WHEREAS the Employer is desirous that certain works should be executed by the
____________________________________________ and has accepted the bid by the
contractor for the execution and completion of such works and the remedying of any
defects therein at a contract price of Rs.______________ (Rupees _________________
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement, words and expressions shall have the same meanings as are
respectively assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be deemed to form and be read and construed as part
of this Agreement, viz.:
a) the Letter of Acceptance;
b) the said Bid and Appendix to Bid;
c) the General Conditions of Contract
d) the Technical Specifications;
e) the Drawings;
f) the Priced Bill of Quantities; and
g) other documents forming part of the contract.
3. In consideration of the payments to be made by the Employer to the Contractor as
here in after mentioned, the Contractor hereby covenants with the Employer to
execute and complete the Works and remedy any defects therein in conformity in all
respects with the provisions of the Contract.
4. The Employer hereby covenants to pay the Contractor in consideration of the
execution and completion of the Works and the remedying of defects therein the
Contract Price or such other sum as may become payable under the provisions of the
Contract at the times and in the manner prescribed by the Contract. IN WITNESS
whereof the parties hereto have caused this Agreement to be executed the day and
year first before written.
Signed, sealed, and delivered by the said Employer and the Contractor in the
On behalf of On behalf of
Ahmedabad Municipal Corporation M/s.
Binding Signature of the Employer :
Binding Signature of the Contractor :
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
Detailed Technical Specifications
D1:- SAFETY PROVISIONS
1. Suitable scaffolds shall be provided for workmen for all that cannot safely be done from
the ground, or from solid construction except such short period work as can be done
safely from ladders. When a ladder is used, an extra mazdoor shall be engaged for
holding the ladder and if the ladder is used for carrying materials as well, suitable
footholds and handholds shall be provided on the ladder and the ladder shall be given
an inclination not steeper than ¼ to 1 (¼ horizontal and 1 vertical).
2. Scaffolding or staging more than 3.25 metres above the ground or floor, swung or
suspended from an overhead support, or erected with stationery support, shall have a
guard rail properly attached, bolted, braced, and otherwise secured at least 1 metre
high above the floor or platform of such scaffolding or stating and extending along the
entire length of the outside and ends thereof with only such openings as may be
necessary for the delivery of materials. Such scaffolding or stating shall be so fastened
as to prevent it from swaying form the building or structure.
3. Working platforms, gangways, and stairways shall be so constructed that they do not
sag unduly or unequally, and if height of a platform or gangway or stairway is more
than 3.25 metres above ground level or floor level, it shall be closely boarded, have
adequate width and be suitably fenced as described in 2 above.
4. Every opening in floor of a building or in a working platform shall be provided with
suitable means to prevent fall of persons or materials by providing suitable fencing or
railing with a minimum height of 1 metre.
5. Safe means of access shall be provided to all working platforms and other working
places. Every ladder shall be securely fixed. No portable single ladder shall be over
metres in length. Width between side rails in a rung ladder shall in no case be less than
30 cm for ladder upto and including 3 metres in length. For longer ladders, this width
shall be increased by at least 6 mm for each additional 30 cm of length. Uniform step
spacing shall not exceed 30 cm.
6. Adequate precautions shall be taken to prevent danger from electrical equipment. No
material on any of the sites shall be so stacked or placed as to cause danger or
inconvenience to any person or the public. The Contractor shall provide all necessary
fencing and lights to protect public from accidents and shall be bound to bear expenses
of defense of every suit, action or other proceedings at law that may brought by any
person for injury sustained owing to neglect of the above precautions and to pay all
damages and costs which may be awarded in any suit, action or proceedings to any
such person or which may with the consent of the Corporation be paid to compromise
any claim by any such person.
7. Excavation and Trenching : All trenches, 1.5 metres or more in depth, shall at all time
be supplied with at least one ladder for each 30 metres in length or fraction thereof.
Ladder shall be extended from bottom of trench to at least 1 metre above surface of
the ground. Sides of a trench which is 1.5 metres or more in depth shall be stepped
back to give suitable slope, or securely held by timber bracing, so as to avoid the
danger of sides collapsing. Excavated material shall not be placed within 1.5 metres of
edge of trench or half of depth of trench, whichever is more. Cutting shall be done from
top to bottom. Under no circumstance shall undermining or undercutting be done.
8. Demolition : Before any demolition work is commenced and also during the process of
(a) All roads and open area adjacent to the work site shall either be closed or suitably
(b) No electric cable or apparatus which is liable to be a source of danger over a cable
or apparatus used by operator shall remain electrically charged.
(c) All practical steps shall be taken to prevent danger to persons employed, from risk or
fire or explosion, or flooding. No floor, roof, or other part of a building shall be so
over-loaded with debris or materials as to render it unsafe.
9. All necessary personal safety equipment as considered adequate by the Engineer shall
be available for use of persons employed on the site and maintained in a condition
suitable for immediate use, and the Contractor shall take adequate steps to ensure
proper use of equipment by those concerned.
(a) Workers employed on mixing asphaltic materials, cement and lime mortars/concrete
shall be provided with protective footwear, hand gloves and goggles.
(b) Those engaged in handling any material, which is injurious to eyes, should be
provided with protective goggles.
(c) Those engaged in welding works shall be provided with welder’s protective eye-
(d) Stone breakers shall be provided with protective goggles and protective clothing and
seated at sufficiently safe intervals.
(e) When workers are employed in sewers and Manchinholes, which are in use, the
Contractor shall ensure that Manchinhole covers are opened and Manchinholes are
ventilated at least for an hour before workers are allowed to get into them.
Manchinholes so opened shall be cordoned off with suitable railing and provided
with warning signals or boards to prevent accident to public.
(f) The Contractor shall not employ men below the age of 18 and women on the work of
painting with products containing lead in any form. Whenever men above the ages of
18 are employed on the work of lead painting, the following precautions shall be
(g) No paint containing lead or lead products shall be used except in the form of paste
or ready-made paint.
(h) Suitable facemasks shall be supplied for use by workers when paint is applied in the
form of spray or a surface having lead paint dry rubbed and scraped.
(i) Overalls shall be supplied by the Contractor to workmen and adequate facilities shall
be provided to enable working painters to wash during and on cessation of work.
10. When work is done near any place where there is a risk of drowning, all necessary
equipment shall be provided and kept ready for use and all necessary steps taken for
prompt rescue of any person in danger and adequate provision made for prompt first
aid treatment of all injuries likely to be sustained during the course of the work.
11. Use of hoisting machines and tackle including their attachments, anchorage, and
supports shall conform to the following :
(i) These shall be of good mechanical construction, sound material and adequate
strength and free from patent defects and shall be kept in good repair and in good
(ii) Every rope used in hoisting or lowering materials or as a means of suspension shall
be durable quality and adequate strength, and free from patent defects.
11.1 Every crane driver or hoisting appliance operator shall be properly qualified and no
person under the age of 21 years shall be in charge of any hoisting machine
including any scaffold winch or give signals to operator.
11.2 In case of every hoisting machine and of every chain ring hook, shackle, swivel
and pulley block used in hoisting or lowering or as means of suspension, safe
working load shall be ascertained by adequate means. Every hoisting machine and
all gear referred to above shall be plainly marked with safe working load. In case of
a hoisting machine having a variable safe working load, each safe working load
and the conditions under which it is applicable shall be clearly indicated.. No part of
any machine or of any gear referred to above in this paragraph shall be loaded
beyond safe working load except for the purpose of testing.
11.3 In case of departmental machine, safe working load shall be notified by the
Engineer. As regards Contractor’s machine, the Contractor shall notify safe
working load of each machine to the Engineer whenever he brings it to site of work
and get it verified by the Engineer.
12. Motors, gearing, transmission, electric wiring and other dangerous parts of hoisting
appliances shall be provided with efficient safeguards, hoisting appliances shall be
provided with such means as will reduce to the minimum risk of accidental descent of
load adequate precautions shall be taken to reduce to the minimum risk of any part of
a suspended load becoming accidentally displaced. When workers are employed on
electrical installations, which are already energized, insulating mats, wearing apparel
such as gloves, sleeves and boots, as may be necessary, shall be provided. Workers
shall not wear any rings, watches and carry keys or other materials, which are good
conductors of electricity.
13. All scaffolds, ladders and other safety devices mentioned or described herein shall be
maintained in a safe condition and no scaffold, ladder or equipment shall be altered or
removed while it is in use. Adequate washing facilities shall be provided at or near
places of work.
14. These safety provisions shall be brought to the notice of all concerned by display on a
notice board at a prominent place at the work spot. Persons responsible for ensuring
compliance with the Safety Provisions shall be named therein by the Contractor.
15. To ensure effective enforcement of the rules and regulations relating to safety
precautions, arrangements made by the Contractor shall be open to inspection by the
Engineer or his representative and the Inspecting Officers.
16. Notwithstanding the above provisions 1 to 15, the Contractor is not exempted from
the operation of any other Act or Rule in force.
17. Contractor shall fully responsible to provide safety measure / equipments necessary
for breaking the dummies constructed to plug the pipe inlet and outlet in the
Manchinhole to avoid any accident.
Note: - Contractor Shall follows the directions furnished by Gujarat High court as well as
Supreme court related to de-silting the sewerage pipe line & Manchinholes. He shall take
care of not lowering labour in the Manchinhole as well pipeline during the work. He shall
fully responsible for any accident if occurred during the work / contract period.
Signature of Contractor Addl. City Engineer
Name : (West Zone)
Company’s seal : Ahmedabad Municipal Corporation
D2:- SAFE ENTRY AND WORKING IN SEWER LINES – GUIDELINES
SAFE WORK PRACTICE PRINCIPLES
1. Introduction
These general guidelines are intended to assist the Contractor in the development
of safe work practices. Where the risk assessment indicates that a particular hazard
cannot be present, the precautions to control that hazard do not apply. Remember
that a favorable history does not guarantee absence of hazard on this occasion.
2. Confined Space
“Confined Space”, in relation to a place of work, means a space of any volume
which a person may at any time enter or be allowed to be entered in which the
atmosphere is liable at any time to be oxygen deficient. This includes but not limited
to pipes, sewers, Manchinholes, tunnels, shafts, ducts, other similar sewerage
installations and etc.
The Contractor shall develop acceptable work practices and safe entry procedures
based on the guidelines provided hereunder and the AMC’s safety code on safety
precautions to be observed during sewer desilting / lining work.
3. Notification to Work in Confined Space
The Contractor shall obtain an entry permit from the Engineer for each occupancy of
any confined space. The Contractor shall furnish all required details in an approved
format to the Engineer for permission to work in confined space at least 24 hours
prior to the entry. Where prolonged work is involved, the permit must be renewed for
each shift. An incident, which substantially alters the condition of a confined space
entry, requires immediate evacuation and reassessment of the condition.
4. Air Quality and Ventilation
Contaminant control and effective ventilation are major factors influencing air quality
in a confined space. The ventilation must be adequate to clear pre-existing
contaminated air and maintain a respirable atmosphere during planned work. This
ventilation may be permanently installed or portable equipment used for this task.
For general ventilation, fresh air should be supplied to the workplace. Within the
sewer system this creates an environment, which displaces contaminated air in the
immediate vicinity.
Where a task generates atmospheric contaminants in a specific area e.g. use of
chemical such as polyester resin, adequate local exhaust ventilation should be used
to remove the contaminants. Where failure of the mechanical ventilation system
would result in deterioration of air quality, the controls must be clearly tagged to
prevent accidental interference and the ventilation system monitored while the
confined space is occupied. Self-Rescuers must be carried whenever failure of the
ventilation system or changes in the working environment can create a
contaminated atmosphere. The self-rescuer can be a self-contained breathing
apparatus, oxygen self-rescuer, or short duration self-contained breathing
apparatus, depending on the time taken to reach open air.
Note: Obtain occupational hygiene advice on the selection or performance of
ventilation system where this is not specified in the work practice or plant design.
Any regularly accessed confined space should be illuminated to AS 1680 or
equivalent with electrical installation to AS 3000 or equivalent. Portable lighting may
be used to supplement permanent lighting in the workplace. Temporary mains
powered lighting installed for a task must comply with the requirements of AS
or equivalent Indian Standards. Miners lamps, mounted on a safety helmet may be
used as an alternative to a hand held torch for personal illumination.
Unless portable lighting complies with AS 2380.7 or similar Indian Standard the
possibility of a flammable atmosphere must be eliminated by isolation, cleaning,
ventilation purging etc.
Where the confined space has been proclaimed as a flammable gas hazard area to
AS 2430 or similar standard all fixed and temporary electrical installation must
comply with AS 2381 or equivalent standard. Torches and portable lights must
comply with AS 2380.7 or equivalent standard.
Illumination standards are: -
General Lighting: - 40 lux minimum, equivalent to a poorly lit
room Stairway Lighting: - 80 lux minimum
Task Lighting :- 240 lux minimum (normal workshop requirements)
6. Equipment usage, Standards and Maintenance
All confined space safety equipment as proposed in this tender documents shall
also meet the established international labour safety standards and be of
appropriate designed capacity for the proposed usage at sites. The equipment must
be checked for visible damage and correct operation before each use. Preventative
maintenance must be performed by trained, and where necessary, authorized
persons at the intervals recommended by the equipment manufacturers. The
Contractor shall submit to the Engineer evidence of such periodic check and
maintenance of the equipment used for confined space entry at every first week of
7. Room to Work
When the constricted volume of a worksite prevents normal work postures and tool
movement, the need for special tools or frequent work rotation should be
8. Control of Flooding
When a confined space is normally liquid filled, accidental return to service must be
prevented by double isolation e.g. insertion of suitable blanking piece, plugging with
inflatable plugs, temporary coffer dams as a second isolation in a Manchinhole or
other effective means.
9. Flow Control
Where a sewer is entered while flowing, rapid increase in flow must be prevented by
use of stop logs, isolation of pumping stations, weather watch and other means
appropriate to the sewer catchments. Adequate communication with the person
responsible for flow diversion must be maintained for the duration of the entry.
Where deep flowing water is present, use personal flotation devices. Safety harness
and lifeline and safety nets as appropriate to prevent drowning and washing away.
11. Fire and Explosion
Adequate precautions must be taken to minimize the risk of fire or explosion when
entering a confined space for any purpose.
12. Presence of Flammable Gas
The presence of flammable gas, flammable dust or the possibility of the presence of
airborne substances in flammable quantities may create a hazardous Area. Care
shall be taken by the authorized person to determine the presence of any such
flammable situation in the confined space before entry. Smoking or lighting any
cigarette or box matches in confined space shall be strictly prohibited. The
flammable gases of concern are methane, digester gas, vapours from flammable
liquid, and vapours from trade waste discharges.
13. Manual Handling of Tools, etc.
Safe system of work should be followed to protect against falls of persons or objects
and crush by moving or falling objects.
Reverberation within a confined space can increase noise levels, especially if more
than one person is working. Heavy duty hearing protection may be required.
15. Vermin / Leptospirosis
All persons working in confined spaces should be aware of the leptospirosis hazard
presented by the presence of vermin. The presence of cockroaches etc. does NOT
indicate that the atmosphere is free of danger to health.
16. Standby and Communication
A member of the confined space work team is allocated the task of maintaining
communication with the members inside the confined spaces. This task may be
rotated among the members of the team. The Standby person must be trained and
be physically capable of providing the assistance and life support in an emergency
and must have sufficient proficiency in Hindi, English, Urdu and Punjabi languages
to promptly communicate information by radio or telephone when required.
While acting as stand-by, this person must not enter the confined space or leave the
vicinity unless relieved from this duty. A standby person is needed for all confined
space entries. The Safe System of Work must indicate the process for
communication from the confined space to the standby e.g. 2 way radio ‘man down’
alarm line of sigh etc.
17. Fitness Assessment
An assessment of fitness, including cardiovascular and respiratory health, is
required to ensure that all persons entering confined spaces, or acting as the stand-
by person, can comply with the physical demands of the job, without risk to their
18. Emergency Rescue and First Aid
No person shall enter any confined space, even in an emergency, without first
ensuring all safety requirements have been met. A safety emergency plan may
assist in a safe, speedy response in the event of an emergency.
All confined space work teams must be trained and equipped to sustain life and be
able to summon emergency help, provide first aid and assist emergency service
personnel, if requested.
Trained persons using supplied air breathing apparatus must only attempt rescue of
persons apparently overcome by toxic gases in a sewer or other confined spaces.
Stabilization of other injuries must be prioritized against the availability of breathable
19. Gas Detector
The Contractor shall engage an authorized person for gas monitoring and detection.
This person shall be trained to operate and response test gas testing equipment
and is authorized by management to perform the necessary tests to decide whether
a category 2 or 3 confined space is fit to enter.
Gas testing can only be performed by persons trained in gas testing, using
equipment appropriate for the anticipated contaminants. This person can perform
other duties provided these do not conflict with the gas-testing task.
20. Specialist Gas Detector
This person has technical qualifications and acceptable training to operate and
response test gas testing equipment, including hydrocarbon detectors and detector
tubes and assesses portable ventilation systems. He is authorized by management
to carry out atmospheric testing to establish entry conditions for all confined space
categories, and to establish whether a Category 1 confined space can be re-
classified to a Category 2. He also performs tests to verify whether hot work is
permitted in gas hazard areas.
Where possible, cleaning should be performed without entry to the confined space,
even if only preliminary cleaning is possible.
Particular attention should be given to the probability of releasing hydrogen sulphide
when disturbing microbial active sludge and sediments, which have accumulated in
a confined space. Supplied air respiratory protection shall be worn where such
residues exist and effective ventilation cannot be guaranteed. Continuous gas
monitoring is required even when supplied air respirator protection is used.
Hose couplings should be designed to resist accidental dislodging or loosening.
Both the operators and the standby person should be able to stop the flow of
cleaning material into the confined space.
Hydro jetting must be performed according to the relevant regulations. Where
chemical compound is used in within the confined space, the chemical compound
should be classed in the Material Safety Data Sheets as non-irritant to respiratory
system, eyes and skin. If this is not possible then appropriate respirator skin and
eye protection must be worn. Substance specific air monitoring may be required.
A visitor to a confined space is a person other than a contractor, who is not a
member of the Confined Space Work team. Visitors must be escorted and trained or
inducted in the necessary skills for that entry and shall sign an indemnity form
before entry into a confined space. No visitor shall be allowed to enter the confined
space without prior permission of Engineer.
23. Hazard Control
Hazards to be identified and controlled include but are not limited to access
mechanical and electrical isolation, flow isolation and control, drowning and
engulfment, last known contents, atmospheric contaminants, temperature extremes,
security and public access.
24. Air Quality Standard For Entry
The acceptable limits of some gases in confined spaces are:
Gas/Vapor Present Acceptable Limits
a. Oxygen Content (o) 19.5% to 23.5% by volume
b. Flammable Gas/Vapor 5% of Lower Explosive Level (LEL)
c. Hydrogen Sulphide (H2S) 5 ppm
d. Carbon Monoxide (CO) 10 ppm
25. Carbon Monoxide (CO)
Carbon monoxide is colorless, odorless, flammable and toxic. Its common sources
are fire, motor vehicle exhausts and cigarette smoke.
This gas is a chemical asphyxiant and is readily absorbed by the hemoglobin in the
blood. Then hemoglobin is unable to transport oxygen to the body tissues and the
body becomes oxygen starved. These effects are more pronounced with hard work
or for heavy smokers. Symptoms include headache (50-200ppm), nausea
(400ppm), irregular heartbeat (1200ppm). Collapse and death (2000ppm).
The entry permit limit is 10 Parts Per Million (ppm). Maximum with an IDLH value of
1500 ppm. (IDLH-Immediately Dangerous to Life and Health)
Note: Some gas detecting machine sensors are cross sensitive, H2S being detected
by the CO cell and vice versa. Alarm by either sensor requires evacuation and re-
evaluation of the safe system of work.
26. Flammable Gas/Vapor
A gas or vapor that will burn when mixed with air in certain proportions and ignited.
The mixture, which contains the least amount of flammable gases that will explode,
is called the Lower Explosive Limit (LEL). The mixture, which contains just enough
Oxygen to let the flammable gas explode, is called the Upper Explosive Limit (UEL).
The flammable range varies for gases and vapors.
Many of these have toxic effects when inhaled and a Workplace Exposure Standard
has been issued to protect workers from these Gas/Vapor. The Contractor shall
obtain relevant Workplace Exposure Standard (WES) for use in the site.
Gas / Vapour Flammable Range 5% LEL WES
in % (FOR ENTRY PERMIT
Butane 1.9 – 8.5 950 ppm 800 ppm
n-Hexane 1.2 – 6.9 600 ppm 50 ppm
Methane 5 – 15 2500 ppm Axphyxiant
Petrol 1.3 –6 650 ppm 900mg/cum
Trichloroethylene 12.5 – 90 6259 ppm 50 p
27. Hydrogen Sulphide (H2S)
Hydrogen Sulphide is a colourless, toxic and flammable gas, which usually has the
odour of rotten eggs. In sewerage systems it is usually derived from the action of
bacteria on the sulphur compounds in anaerobic or old sewage. A small amount of
sludge or slime in wet wells or sewers will release a lot of H2S when disturbed.
After a few minutes exposure, the ability to smell hydrogen sulphide by a person is
lost and then hydrogen sulphide becomes more dangerous as its presence is no
longer obvious and the person could become an innocent victim.
It can sometimes be detected by odour at less than 0.1 ppm but can be readily
detected by odour at 4 ppm. More serious health effects include eye irritation (10
ppm), respiratory irritation (50 ppm), headache, nausea, dizziness (200 ppm),
collapse and death (700 ppm).
The entry permit limits is 5 parts Per Million (ppm), Maximum with an Immediately
Dangerous to Life and Health (IDLH) value of 300 ppm.
Some gas detecting machine sensors are cross sensitive, H2S being detected by
the CO cell and vice versa. Alarm by either sensor requires evacuation and re-
evaluation of the safe system of work.
28. Methane (CH4)
The most common flammable gas found in sewers is methane. This mainly comes
from gas pipe leaks in the city’s gas distribution system. It can also be derived from
the action of anaerobic bacteria on rotting material. However a range of other
flammable gases and vapours may be encountered. These include LPG, petrol
vapour and other solvents.
Digester gas, found in anaerobic sludge digesters on sewage treatment plants is a
flammable mixture of methane nitrogen and carbon dioxide.
Methane is a colourless, odourless gas. Although pure methane is slightly lighter
than air the relative density of methane / air mixture is similar to air entry permit
range. Methane is hazardous because of its flammability, i.e. between
concentrations of 5% to 15% in air, it may explode if an ignition source is present.
High concentrations of methane may result in oxygen deficiency. Injury or death
result from lack of oxygen not methane toxicity classifying methane as a simple
29. Oxygen Content (O2)
Fresh air contains 20.9% oxygen, equivalent to a partial pressure of
hectopascal of oxygen at sea level.
The readings obtained on a gas detection instrument in open air may vary
depending on instrument calibration and barometric pressure.
In a confined space, oxygen can be used up by bacteria in sewage or sludge,
rusting of iron fittings, burning (or welding) or displaced (pushed out) by other
Breathing of air, which contains reduced oxygen results in increasingly serious
health effects. These range from impaired coordination and faulty judgment (12-
16% O2) to collapse and rapid death (less 6% O2).
Increased oxygen readings can only come from instrument error or by leakage from
oxygen cylinders, liquid oxygen tank, etc. High oxygen levels greatly increase fire
hazards, fires burn fiercely; oily clothing and hair can catch fire without an ignition
The entry permit levels are 19.5% to 23.5% by volume.
Parts per million (ppm)
Parts of gas or vapour per million parts of contaminated air by volume at 200C and
Parts of substance per 100 parts of air,
water etc. 1% = 10,000 P
31. Other Atmospheric Contaminants
Entry, unless wearing air supplies breathing apparatus is not permitted unless
atmosphere contaminants are below the relevant 8-hour time weighted average
(TWA) Workplace Exposure Standard. This limit applies for all entries including brief
exposures. Entry wearing breathing apparatus is only permitted where the
concentration of the contaminant is within the protection factor of the breathing
apparatus and below the IDLH (Immediately Dangerous to Life and Health) value.
32. Sewer Gases
Air in contact with live sewage contains gases released from the sewer. For safe
entry, contaminated air must be replaced with clean air by ventilation of the confined
space. The resulting atmosphere must be confirmed by gas testing.
Discharge of untreated wastes, e.g. hypochlorites, electroplating effluent, acids may
result in generation of chlorine, hydrogen cyanide and other harmful gases some
distance from the original discharge.
33. Confined Space Categorisation
The confined space category is a guide to developing a safe system of work. The
confined space category may change to a more stringent level as a result of
adverse environmental factors or work produces contaminants. Alternatively it may
change to a less restrictive category if appropriate engineering upgrades, whether
temporary or permanent, are implemented.
1.1 Category 1 – Confined Space
Entry allowed only if flammable gas is below 5% of L.E.L. and other gases are
within the protection factor of the respiratory protective equipment used.
Visibility must be adequate
Personal Safety
o Wear specified protective clothing for the hazards.
o Wear safety harness.
o Use lifeline where appropriate.
Respiratory Protection
o Test air quality prior to entry by a Specialist Gas Detector.
o Ventilate to reduce contamination.
o Monitor air quality as directed by the Specialist Gas Director.
o Wear airline breathing apparatus with backup air supply OR wear self-
contained breathing.
Note: An Oxygen self rescuer is nor a backup for an airline used in contaminated
If the Category 1 confined space is a chemical storage tank, it can be reclassified to
a Category 2 or 3-confined space when the specialist gas detector confirms that the
chemical has been cleared from the interior.
Sewer, wet wells etc can be reclassified by a specialist gas detector to a lesser
confined space only when an approved safe system of work is employed. This safe
system of work must provide for demonstrated control of airborne contaminants and
other hazards in the workplace, to provide conditions equivalent to a Category
Hot work requires control of fire and explosion hazards and may require air supplied
breathing apparatus to control fumes irrespective of the confined space category. A
Hot word permit is required in addition to the normal entry permit.
1.2 Category 2 – Confined Space
Entry allowed only if all gases are within entry permit limits. Personal Safety
o Wear specified protective clothing for the hazards.
o Wear safety harness.
o Use lifeline where appropriate.
Respiratory Protection
o Test air quality prior to entry
o If air quality test fails, refuse entry until reason found and rectified, or revert
to Category 1 entry conditions.
o Ensure adequate ventilation
o Monitor air quality during entry.
o Carry oxygen self rescuer
Note: Standby person must have SCBA readily available.
Hot work requires control of fire and explosion hazards and may require air supplied
breathing apparatus to control fumes irrespective of the confined space category. A
Hot word permit is required in addition to the normal entry permit. A hydrocarbon
check by a “specialist gas detector” is required unless the environment can be
upgraded to Category 3 conditions
1.3 Category 3 – Confined Space
Entry permit required (unless using a posted entry procedure for routine operation of
the facility) for each shift that the structure be occupied.
Wear protective clothing specified for the hazards.
Respiratory Protection
Test air quality prior to entry
If the proposed work can generate airborne contaminants, arrange ventilation.
Respiratory protection and / or air quality monitoring as appropriate.
Hot work required hot work permit and control of fumes.
If air quality test fails, revert to Category 1 entry conditions or refuel entry until
reasons found and rectified.
1.4 Category 4 – Confined Space
Follow facility safety procedures.
Wear protective clothing specified for the hazards
Respiratory Protection
Evacuate when alarms advise
Hot work requires control of fumes.
Separate Permit(s) required for chemical cleaning and / or hot work. If evacuation
alarm sounds, evacuate following site emergency procedure. Reoccupy as a
Category 2 confined space.
Generic Entry Summary
Category Category Category Category
Entry Permit Yes Yes Yes Yes
Standby Person Yes Yes Yes* *
Communication to remote Yes*
Protective Clothing Yes* Yes* Yes* Yes*
Safety Harness Yes Yes
Lifeline/Fall arrester Yes Yes
Airline and backup Yes*
Specialist gas tester Yes
Gas tester Yes Yes Yes
Gas monitoring Yes Yes
Ventilation Yes* Yes* Yes Yes
*Appropriate choice given in Safe Work practice for the task
# Required by Standby Person
34. Entry Permit Format
A general entry permit for working in sewerage works is given below as an example.
The contractor shall develop his own format of the entry permit form and submit it
for the approval of Engineer.
35. Maintenance of Equipment
This equipment must be maintained as per manufacturer’s recommendation and
records kept of this maintenance.
Compressed air bottles must be refilled by a source, which warrants that the air
meets quality standards of AS1715 or equivalent.
Air from air compressors must be treated to meet quality standards of AS1716 and
tested periodically to demonstrate compliance.
All respiratory protection system must be used in accordance with AS1715.
36. Gas Detecting Machines
The instrument must be operated according to the manufacturer’s instructions.
The instrument must be checked for correct functioning using a test gas (‘Response
Check’) every day when the instrument is used to check possibly contaminated
If the instrument is used less frequently, it can be response checked each time it is
The following equipment must meet the relevant section of AS1716 or any
equivalent standard
A. Self contained breathing apparatus.
B. Oxygen Set (Rescuer).
C. Airline compressed air breathing apparatus.
All workmen should use all the same-model of this equipment for interchangeability.
Obtain professional advice for selection of airline breathing apparatus and
compressed air self-rescuers.
Portable gas detection instruments must meet the following requirements.
Manual of Practice
Sr.No. Gas Monitored Range Required Resolution Required
1 Oxygen 1% - 30% Resolution 1%
2 Flammable Gas 1% - 100% of LEL Resolution 1% of LEL
3 Hydrogen Sulphide 1 – 50 ppm Resolution 1 ppm
4 Carbon Monoxide 1 – 400 ppm Resolution 1 ppm
ENTRY PERMIT FOR CONFINED SPACES
(Required for an confined space entries)
CONFINED – SPACES CATEGORY [ ]
Is a hot word permit also required? Y/N
If Yes. Permit No.
1. SITE AND TASK INFORMATION
Contractor’s Visitor’s
Description of work to be Requested
2. ISOLATION OF CONFINED SPACE 5. PERSONNEL PROTECTIVE
( ) Water/ sewer flow isolation/control ( ) Supplied air respirator
( ) Harmful substance present ( ) Oxygen self rescuer
( ) Warning notices, locks or tags in place ( ) Safety harness
( ) Other (specify) ( ) Safety line
( ) other protective clothing/equipment
3 AIR QUALITY …………………………………………..
Oxygen (19.5% - 23.5%) 6. OTHER PRECAUTIONS
Hydrogen Sulphide (<10 ppm) ( ) Warning notices / barricades in place
Flammable gas (<5% LEL) ( ) Smoking prohibited
Carbon monoxide(<30ppm) ( ) Rescue system in place
Other specify ( ) Emergency rescue trolley available
Limit ( ) Result……………… ( ) Other precaution (Specify)
Ventilation ……………………………………………
Time and date of 7. CONFINED SPACE ENTRY PERMIT
Response test date for gas
testing This confines space in my opinion safe for
entry and work under the listed
Machine…………………………………….
( ) The work teak is trained and equipped
Monitor while occupied: Yes/No. for
Additional category1 Safe entry valid
Substance checked ( identify and limits) From……………………………am/pm
……………………………………………. Responsible
Monitoring delegated to gas
tester (Y/N) 8. SIGNING OUT
( ) All persons have left the confined
Condition………………………………… space
and no further entry is permitted on this
Specialist gas tester………………………..
From……………………………am/pm
4. CHEMICALS ( to be used in the
confined 9. OBLERVED FAULTS / INCIDENTS
D3:- SAFETY PRECUATIONS TO BE OBSERVED DURING CLEANING, DESLITING
AND LINING WORK.
18. Special Direction to Tenderers
1.1 Precautionary measures to be taken be the contractor for the safety and welfare of
the labours connoted with desilting and lining work.
To begin with the work of desilting, initiall six consecutive Manchinholes are
to be opened, two on the up-stream and two on the down-stream side of the two
Manchinholes, on the actual stretch to be cleaned or desilted. The Manchinholes
should be kept open for one hour prior to the starting of cleansing operations and
should be so kept open during the whole duration of cleaning operations. This to be
done for allowing the combustible gases to escape naturally. No lighted matchsticks
should be thrown in the Manchinhole. This may cause fire and explosions
endangering the life of the workmen and the pedestrians. This may also damage to
the sewer and other adjoining utility services, if any Jalis should be placed over all
the opened Manchinholes to prevent pedestrians etc. from falling in. tripod stands
with flags it should be written in white bold letters “Danger Manchinhole Open.”
1.2 When working at night, lantern fitted with red globe and lights shall be hung from the
tripod stand. Each Manchinhole kept open should be guarded by one labourer or
C.I. heavy cover with holes exactly fitting up to the fame and capable of taking the
load of lorry should be placed over the Manchinhole, so that top of the cover is flush
with the road surface. The contractor without any extra cost shall provide the
covers. The same should be removed and replaced with regular Manchinhole cover
when the work is closed.
1.3 The contractor should keep sufficient number measurement rods. The
measurement rods shall be made out of solid bamboo/M.S. rod of sufficient length
fixed with M.S. flat 150 mm X 150 mm X 6 mm (6”X6” and ¼”) thick at one end and
fitted with point at other end, to take measurement of water and silt.
1.4 Manchinholes shall be kept open for minimum one hour to allow foul gases to
escape and simultaneously there should be forced purging with the help or an are
blower to completely clean the air in the sewer.
1.5 Sewage levels shall be checked in the Manchinholes and the same should not be
more then 450 mm (18”).
1.6 Wet lead acetate paper shall be inserted in the Manchinholes which should nit turn
even light brown or black. If the lead acetate paper turns light brown or black, then
the Manchinhole shows the presence of Hydrogen Sulphide Gas (H2S) and in that
case this test shall be repeated after every ten minutes till positive result is
achieved. The sensitivity of lead acetate paper should be ascertained to suit and
detect the minimum allowable concentration (MAC) for long-term exposure.
This paper should be held as low as possible in the Manchinhole atmosphere. In
spite or long waiting for about one and half hour, if he lead acetate paper continues
to show negative gas detector shall be used for half an hour. Thereafter gas detector
shall be used to check the presences of gases and the worker shall be allowed only
after it is confirmed that the condition inside the Manchinhole is safe for man entry.
Whenever necessary, or where the sewer line is heavily silted or there are chances
of gas eruption, the person entering the Manchinhole shall be provided with gas
mask or breathing apparatus (respiratory system) and hand blower or mechanical
blower be used during the desilting operation. In every case use of gas monitor in
working condition is mandatory. In additional to this, the conventional methods lie
lead acetate paper test etc. be done. The gas monitors should be accurately
calibrated after regular intervals to maintain their reliability.
After the lead acetate paper test, a lighted safety lamp shall be inserted in the
Manchinhole, which should burn smoothly. If not, it shows the presence of Carbon
monoxide (CO) and in that case precautionary measures as stated in sub-pare (g)
should be followed.
After the presence of combustible gases are ruled out the following further tests is
required to be carried out for the presence of oxygen.
A lighted naked candle placed at the center of the candle testing equipment covered
with glass on three sides should be lowered down slowly. If the flame is extinguished
or flickers, it indicates the presence of carbon monoxide and or carbon dioxide. If it
burns for not less than five minutes uniformly, it indicates the presence of oxygen,
which is required for breathing for the workman working inside the Manchinhole.
19. Working Inside the Manchinhole
After all these tests are carried out successfully, particular care should be taken
where sewer is heavily silted, the scum and sullage should thoroughly be stirred and
disturbed by means of long bamboos/ G.I. rod from the top of the Manchinhole to
allow entrapped gases within silt pockets to escape before allowing the labourers to
go down into the Manchinhole.
The depth of water should be measured and the labourer should be asked to get
down when the level of water is less then 450 mm (18”). Before the labourer is
allowed to get down inside the Manchinhole, he should be asked to apply barrier
creams all over the body as a precautionary measures to safe guard against itching
and burning sensation. Safety belt should be tied around his waist and chest when
the labourers are getting down, another man at the top should hold the other end of
the rope. Not less then two people should be allowed to work inside the Manchinhole
If the labourers who are working inside the Manchinhole show slight discomfort, they
should be asked to come up or pulled up. The labourers who are working inside the
Manchinhole should give jerks every few minutes to signify that everything is okay
After getting satisfactory test result and after taking precautionary measures as
stated above, the worker shall be allowed to descend or enter in the Manchinhole.
The workers entering the Manchinhole shall be provided with wadder suit, hand
gloves protective head gears and head lamp. If the wadder suits are not available the
worker shall be provided with Barrier Creams with germicide to be applied to their
entire body to prevent harmful effect due to contact with harmful bacteria and germs.
The worker entering the Manchinhole shall wear Harness belt around his waist. In
spite of the Manchinhole entry tests being carried out, there are chances of eruption
of poisonous gasses in the silt. If the worker finds any difficulty in breathing initially or
during the work then he should be taken out immediately by means of harness belt.
Where the sewer line is heavily silted or there are chances of gas eruption, gas mask
shall be used while entering the Manchinhole and also during desilting.
On completion of the work all Manchinholes shall be checked and it should be
ascertained that the same are properly closed.
20. Safety (General)
Proper ventilation shall be maintained in the Manchinhole and sewer line being
desilted. Hand operated or mechanical blower should be preferable used for half an
hour to one hour before entering the sewer line even after getting the safe working
condition, while desilting sewer lines where accumulation of silt is heavy. While the
blowers shall be operated continuously during the desilting of sewer lines which are
heavily silted or susceptible to gas generation.
While carrying out desisting, the sewer lines of man-entry size, the contractors shall
use blower during the entire period. This would not only ensure safe condition but
also ensure comfortable working condition for the worker and would in turn increase
his performance and output.
In some Manchinhole where sewage is falling over workman or causing obstruction,
plugging the upstream sewer will be allowed temporarily without any charges,
provided the Contractor ensures that the upstream sewer line does not overflow. The
plugs shall be removed immediately after the work has been completed.
The Contractor shall, as far as possible, use mechanical process for cleaning and
desilting sewer lines and progressively minimise manual process of desilting so that
entry of workers in the sewers for purpose of cleaning and desilting shall be avoided.
A list of various safety tools, overhauls and safety equipment.
• Harness Belts
• Protective Head Gear with Lamp
• Breathing apparatus
• Thigh and Wadder Suits
• First Aid Box
• Barrier Creams with Germicides
• Other related safety items, as directed by the Engineer
No worker of Contractor shall be allowed to enter into the Manchinhole for cleaning
and desilting the sewer lines unless all the safety tools, shackles and equipment are
at site and the worker is equipped with personal safety gear such as gumboot,
wadder suit, headgear, head lamp and, harness belt etc.
The Contractor should keep “first aid box at the site of works”.
One vehicle with the safety equipment such as breathing apparatus, diver suit, air
blower, escape set etc., shall be made available at each Desilting. The same vehicle
shall have other facility such as first aid kit, provision for eye wash.
21. Welfare of the Workman Engaged For Desilting / Lining Works
No person below the age of 18 years shall be employed for carrying out cleaning and
desilting work of the sewerage system / sewer lines.
Adequate safety measures shall be taken by the Contractors.
The Contractor should impart training to the supervisory staff, all the workman
entrusted with the task of sewer rehabilitation.
A detailed medical checkup of all the workers must be immediately undertaken. This
check up should include a full clinical examination, proper blood tests, routine
radiological tests, pulmonary functions test, a psychiatric evaluation and other
specialized tests wherever necessary. Special emphasis must be given to the
study of the respiratory system, the eyes and the skin problems.
Each worker engaged in cleaning the desilting of the sewer lines / Manchinholes,
shall be medically examined once a year and shall not be engaged, if he is suffering
from any of the diseases such as respiratory, skin, eye-problems, infections,
cardiovascular, spinal, psychiatric nature etc. He should not be engaged for cleaning
and desilting work inside the Manchinhole or sewer lines till he is cured.
Whether a person is suffering from any of the above mentioned diseases or not shall
be certified by any Municipal Doctor. Similarly, the contractors engaged in cleaning
and desilting operation, shall get their workers, employees medically examined and
shall not employ any worker who is found to be suffer from any of the above
mentioned ailments.
The workers should be provided with vaccination against certain diseases commonly
prevalent among sewage workers due to the nature of their work.
First Aid Box properly stocked including washing bottle to wash skin and eyes,
should be kept at the site of work.
Proper arrangement should be made to get treatment expeditiously, including
facilities for speedy admission and treatment in any nearby hospital to the work site.
Location of the hospital should be displayed at the site of work.
The Contractors engaged by AMC for sewer cleaning desilting and repair work,
should take out workmen insurance policy at Contractor’s cost (individual or group)
for workers engaged by him for sewer cleaning and / or desilting or repairing.
The Contractor shall maintain washing, drinking water and toilet facility at each
Chowky. If no toilet is provided in the Chowky, it should be so located that the public
toilet is available within a distance of 300 m. The site Chowky should also be
equipped with full first aid kit.
Contractor should provide carbolic soap at the rate of one cake for four days for
washing clothes that are used by workers. The workers should be asked to take bath
after the work is over. In cold seasons i.e. December to February, Contractor should
supply sufficient fire wood to workers for warming up after taking the bath.
22. Contractor’s Responsibility towards Welfare of the Workmen
A responsibility officer of the supervisory cadre of the Contractor should be physically
present at the site and he/she should ensure and document compliance of the
guidelines under the scheme for measures of safety and welfare of the workers and
entry worthiness in the Manchinhole. He / She should remain physically present
throughout the operation and the onus of compliance of these guidelines should lie
A log book should be maintained by him/her for giving the date and time, the names
of workers, place and other relevant particulars of stay in the Manchinhole etc. The
said official should hold a certificate of training from a Competent Body such as
National Safety Council, New Delhi Fire Brigade etc. in First-Aid and Emergency
Measures. If the Supervising Officer is not satisfied about the various requirements
as specified in the above specification, then the work should be stopped
List of the Contractor’s employees including their residential addresses, age, etc. is
required to be supplied by the Contractor in separate register.
If the Contractor has engaged 20 or more labourers, then the Contractor is required
to be registered under the Contract Labour Act and Inter-State Migrate Labour Act,
wherever applicable.
Contractors should abide by all the rules and regulations in respect of labour laws
prescribed by the Government Authorities and submit the returns etc.
The workmen compensation should be paid to the Contractor’s employees as per the
provisions of Workmen’s Compensation Act.
Contractor should maintain a muster of all the labourer working at site and his
supervisor should prepare a triplicate copy of the same specifying the persons
getting down the Manchinhole. The Contractor shall send one copy to the Engineer
and another copy shall be kept in his office for his record. The copy should reach the
Engineer on the day before 11 AM without any extra cost.
The Contractor shall also ensure that the silt is transported within 24 hours to the
Dumping ground or to the site as directed by the Engineer. If the Contractor fails to
remove the silt within 24 hours the same will be removed by the AMC at his risk and
cost, after the Contractor has been notified in writing.
The Contractor should not make the silt storage depot etc., near the water gully. If
found that the Contractor disregarded the above and caused blockage in the water
gully, the AMC will clean the gully at the risk and cost of the Contractor. Contractors
shall located depots at places where.
All the silt removed from Manchinholes / chambers near bus stop or junctions should
be transported immediately to a place approved by the Engineer at say 100 meters
from the Manchinhole, and from where the same shall be transported to the
approved dumping yard as soon as possible.
The Contractor should sprinkle sufficient quantity of bleaching powder over the silt
removed site to prevent smell emanating from the silt.
No person other than the Contractor’s workers should be allowed to go inside the
Manchinhole. If it is found that any unauthorized person has entered the
Manchinhole and injured or died the Contractor will be solely and fully responsible for
the consequences including damages etc. claimed by the person or his heirs.
Plugging etc., if required to be done for stopping the flow or diverting the flow and
pumping out sewage to facilitate removal of the choke or for any other purpose
connected with cleaning work should be done by the Contractor without any extra
Even though the Contractors takes all the precautionary measures and by chance
any workman is injured or dies due to negligence or otherwise the Contractor will be
responsible for the claims of damages by the workman or his heirs.
23. SAFETY PROVISIONS:- Suitable scaffolds shall be provided for workmen for all that
cannot safely be done from the ground, or from solid construction except such short
period work as can be done safely from ladders. When a ladder is used, an extra
mazdoor shall be engaged for holding the ladder and if the ladder is used for carrying
materials as well, suitable footholds and handholds shall be provided on the ladder
and the ladder shall be given an inclination not steeper than ¼ to 1 (¼ horizontal and
24. Scaffolding or staging more than 3.25 metres above the ground or floor, swung or
suspended from an overhead support, or erected with stationery support, shall have a
guard rail properly attached, bolted, braced, and otherwise secured at least 1 metre
high above the floor or platform of such scaffolding or stating and extending along the
entire length of the outside and ends thereof with only such openings as may be
necessary for the delivery of materials. Such scaffolding or stating shall be so
fastened as to prevent it from swaying form the building or structure.
25. Working platforms, gangways, and stairways shall be so constructed that they do not
sag unduly or unequally, and if height of a platform or gangway or stairway is more
than 3.25 metres above ground level or floor level, it shall be closely boarded, have
adequate width and be suitably fenced as described in 2 above.
26. Every opening in floor of a building or in a working platform shall be provided with
suitable means to prevent fall of persons or materials by providing suitable fencing or
railing with a minimum height of 1 metre.
27. Safe means of access shall be provided to all working platforms and other working
places. Every ladder shall be securely fixed. No portable single ladder shall be over
metres in length. Width between side rails in a rung ladder shall in no case be less
than 30 cm for ladder upto and including 3 metres in length. For longer ladders, this
width shall be increased by at least 6 mm for each additional 30 cm of length. Uniform
step spacing shall not exceed 30 cm.
28. Adequate precautions shall be taken to prevent danger from electrical equipment. No
material on any of the sites shall be so stacked or placed as to cause danger or
inconvenience to any person or the public. The Contractor shall provide all necessary
fencing and lights to protect public from accidents and shall be bound to bear
expenses of defence of every suit, action or other proceedings at law that may brought
by any person for injury sustained owing to neglect of the above precautions and to
pay all damages and costs which may be awarded in any suit, action or proceedings
to any such person or which may with the consent of the Corporation be paid to
compromise any claim by any such person.
29. Excavation and Trenching : All trenches, 1.5 metres or more in depth, shall at all time
be supplied with at least one ladder for each 30 metres in length or fraction thereof.
Ladder shall be extended from bottom of trench to at least 1 metre above surface of
the ground. Sides of a trench which is 1.5 metres or more in depth shall be stepped
back to give suitable slope, or securely held by timber bracing, so as to avoid the
danger of sides collapsing. Excavated material shall not be placed within 1.5 metres of
edge of trench or half of depth of trench, whichever is more. Cutting shall be done
from top to bottom. Under no circumstance shall undermining or undercutting be done.
30. Demolition: Before any demolition work is commenced and also during the process of
13.1 All roads and open area adjacent to the work site shall either be closed or suitably
13.2 No electric cable or apparatus which is liable to be a source of danger over a cable
or apparatus used by operator shall remain electrically charged.
13.3 All practical steps shall be taken to prevent danger to persons employed, from risk or
fire or explosion, or flooding. No floor, roof, or other part of a building shall be so
over-loaded with debris or materials as to render it unsafe.
31. All necessary personal safety equipment as considered adequate by the Engineer
shall be available for use of persons employed on the site and maintained in a
condition suitable for immediate use, and the Contractor shall take adequate steps to
ensure proper use of equipment by those concerned.
32. Workers employed on mixing asphaltic materials, cement and lime mortars/concrete
shall be provided with protective footwear, hand gloves and goggles.
33. Those engaged in handling any material, which is injurious to eyes, should be
provided with protective goggles.
34. Those engaged in welding works shall be provided with welder’s protective eye-
35. Stone breakers shall be provided with protective goggles and protective clothing and
seated at sufficiently safe intervals.
36. When workers are employed in sewers and Manchinholes, which are in use, the
Contractor shall ensure that Manchinhole covers are opened and Manchinholes are
ventilated at least for an hour before workers are allowed to get into them.
Manchinholes so opened shall be cordoned off with suitable railing and provided with
warning signals or boards to prevent accident to public.
37. The Contractor shall not employ men below the age of 18 and women on the work of
painting with products containing lead in any form. Whenever men above the ages of
18 are employed on the work of lead painting, the following precautions shall be taken:
20.1 No paint containing lead or lead products shall be used except in the form of paste or
ready-made paint.
20.2 Suitable facemasks shall be supplied for use by workers when paint is applied in the form of
spray or a surface having lead paint dry rubbed and scraped.
20.3 Overalls shall be supplied by the Contractor to workmen and adequate facilities shall be
provided to enable working painters to wash during and on cessation of work.
38. When work is done near any place where there is a risk of drowning, all necessary
equipment shall be provided and kept ready for use and all necessary steps taken for
prompt rescue of any person in danger and adequate provision made for prompt first
aid treatment of all injuries likely to be sustained during the course of the work.
39. se of hoisting machines and tackle including their attachments, anchorage, and
supports shall conform to the following :
39.1 These shall be of good mechanical construction, sound material and adequate
strength and free from patent defects and shall be kept in good repair and in good
39.2 Every rope used in hoisting or lowering materials or as a means of suspension shall
be durable quality and adequate strength, and free from patent defects.
40. Every crane driver or hoisting appliance operator shall be properly qualified and no
person under the age of 21 years shall be in charge of any hoisting machine including
any scaffold winch or give signals to operator.
41. In case of every hoisting machine and of every chain ring hook, shackle, swivel and
pulley block used in hoisting or lowering or as means of suspension, safe working load
shall be ascertained by adequate means. Every hoisting machine and all gear referred
to above shall be plainly marked with safe working load. In case of a hoisting machine
having a variable safe working load, each safe working load and the conditions under
which it is applicable shall be clearly indicated.. No part of any machine or of any gear
referred to above in this paragraph shall be loaded beyond safe working load except
for the purpose of testing.
42. In case of departmental machine, safe working load shall be notified by the Engineer.
As regards Contractor’s machine, the Contractor shall notify safe working load of each
machine to the Engineer whenever he brings it to site of work and get it verified by the
43. Motors, gearing, transmission, electric wiring and other dangerous parts of hoisting
appliances shall be provided with efficient safeguards, hoisting appliances shall be
provided with such means as will reduce to the minimum risk of accidental descent of
load adequate precautions shall be taken to reduce to the minimum risk of any part of
a suspended load becoming accidentally displaced. When workers are employed on
electrical installations, which are already energized, insulating mats, wearing apparel
such as gloves, sleeves and boots, as may be necessary, shall be provided. Workers
shall not wear any rings, watches and carry keys or other materials, which are good
conductors of electricity.
44. All scaffolds, ladders and other safety devices mentioned or described herein shall be
maintained in a safe condition and no scaffold, ladder or equipment shall be altered or
removed while it is in use. Adequate washing facilities shall be provided at or near
places of work.
45. These safety provisions shall be brought to the notice of all concerned by display on a
notice board at a prominent place at the work spot. Persons responsible for ensuring
compliance with the Safety Provisions shall be named therein by the Contractor.
46. To ensure effective enforcement of the rules and regulations relating to safety
precautions, arrangements made by the Contractor shall be open to inspection by the
Engineer or his representative and the Inspecting Officers.
47. Notwithstanding the above provisions 1 to 15, the Contractor is not exempted from the
operation of any other Act or Rule in force.
48. Contractor shall fully responsible to provide safety measure / equipments necessary
for breaking the dummies constructed to plug the pipe inlet and outlet in the
Manchinhole to avoid any accident.
Note: - Contractor Shall follows the directions furnished by Gujarat High court as well as
Supreme court related to de-silting the sewerage pipe line & Manchinholes. He shall take
care of not lowering labour in the Manchinhole as well pipeline during the work. He shall
fully responsible for any accident if occurred during the work / contract period.
Signature of Contractor Addl. City Engineer
Name : Ahmedabad Municipal Corporation
D:- TECHNICAL SPECIFICATIONS -
Sewers to be inspected shall be suitably cleaned by high vacuum suction equipment
and by high pressure water jetting to remove all silt, grease and loose materials.
Where necessary mechanical cleaning tools may be used to scrape off grease and
encrustations in the sewer.
All mass roots, intruding laterals and concrete shall be neatly cut off as required for
proper structural lining work.
Cleaning shall be carried out from the downstream access Manchinhole or
chamber(otherwise employer will direct to start the de-silting work) to the upstream
access Manchinhole or chamber and shall include all operations necessary to
remove grease, slime, silt and loose materials from the sewer bore and Manchinhole
or chamber. All loosened and inherent silt and grease material in the pipeline shall
be prevented from passing downstream by necessary stanking arrangement.
a) INSPECTION OF MANCHINHOLES :
Inspection of Manchinhole conditions in accordance with WRC / MSCC is will be
carried out concurrently during the inspection of sewer.
Manchinhole inspection can also carried out manually with data logging of defects
and general conditions.
Provision will be made to provide photographic / video evidence of defects where
Any defects found will be repaired by suitable method after getting approval from
b) BYPASS PUMPING / DIVERSION OF FLOW:
The main and branch sewers including cross connections are considered flowing full
generally in the morning peak hours. The bypass system provided shall be of
sufficient capacity to handle the estimated flows on 24 hours basis.
The bypass pumping/flow diversion arrangement shall be continuously monitored
and cleaned or cleared off any obstructions due to the silts / grits with appropriate
and quick disposals.
Every day to ensure that the bypass arrangement is working properly and no
overflow of sewage exists.
The main sewer shall regularly desilt the diverted sewer network to ensure that there
is no overflow of sewage occurs at any time.
Joint inspection of the flow diversion arrangements can be carried out during lean
and peak flow periods at least once in a week.
Flow diversion plan shall be done at site to deploy necessary pumps of suitable
capacity as per the site condition.
c) PUMPING FACILITIES:
The provision will be made for , operation, maintenance and noise suppression of all
over pumping plant, for the provision (including establishment and removal),
operation & maintenance of all delivery hose installed and for the period during
which bypass pumping work is required ; sinking hoses in trenches; backfilling and
reinstating these trenches as required ; placing horizontal and/or ramped metal
planting over temporary diversion of the delivery hose either in trench or at the
road surface and for routing delivery hoses through other conduits, standing
and plugging lateral connections as well as other relevant requirement. The pumping
equipment shall be attended to all the time by competent pump operator
d) TELEVISION INSPECTION OF SEWERS
The WORK of this Section includes pre-cleaning, when necessary, and performing a
closed circuit television (CCTV) inspection of the indicated reaches of sewers. The
minimum diameter of sewer for television inspection shall be 4 inches.
The purpose of inspection is to detect and locate defects and document the current
condition of the sewer, leading to evaluation and selection of repair methodology by
the OWNER.][The purpose of inspection is to inspect and document the physical
condition of the sewer after rehabilitation.] [The purpose of inspection is to document
the condition of the new sewer.]
The CONTRACTOR is cautioned that sewage will continue to flow to the sewers and
that the WORK must be performed under permit required for confined space entry
e) SHOP DRAWINGS AND STANDARDS
The following shall be submitted in compliance with Section
1. CCTV equipment operational manual.
2. Location where debris from cleaning sewers will be disposed.
3. Schedule for cleaning and inspecting each sewer reach.
D2:- EXECUTION OF CLEANING THE SEWER LINE:
DIVERSION PUMPING
The CONTRACTOR shall install and operate sewage diversion pumping equipment to
maintain sewage flows without backup, overflow or spill. He shall divert the flow of the
existing line to be de-silted in to downstream of the same line. He shall inform to AMC
staff about the diversion of the flow .He shall install the pumps of sufficient capacity so
that no heading should be in upstream of the de-silting work. He shall study all the
branch lines falling in the line to be de-silted. He shall keep well maintained register for
every stacking used for diversion of the flow.
The CONTRACTOR shall select the cleaning equipment and method for cleaning based
on the age, the material, and the probable condition of the sewer. More than one type of
equipment or attachments may be required on a single reach or at a single location. The
CONTRACTOR shall not damage the sewer or any Manchinhole during cleaning.
When requested by the CONSTRUCTION MANAGER, the CONTRACTOR shall
demonstrate the performance capabilities of the cleaning equipment and method
proposed for use. If results obtained by the demonstration are not satisfactory, the
CONTRACTOR shall select other methods or equipment that will clean the sewer line,
and shall perform another demonstration.
For water pressure cleaning equipment, the CONTRACTOR shall install a gauge to
monitor working pressure on the discharge of high-pressure water pumps.
The CONTRACTOR shall remove dirt, debris, and grease from the entire circumference
of the sewer between Manchinholes.
Acceptance of sewer cleaning work is contingent upon the successful completion of the
television inspection. If television inspection shows debris, solids, sand, grease, or grit
remaining in the line, the cleaning will be considered unsatisfactory, and the
CONTRACTOR shall repeat cleaning and televising of the sewer line at no increased
cost to the OWNER until cleaning is acceptable to AMC
CONSTRUCTION MANAGER
A The CONTRACTOR shall remove sludge, dirt, sand, rocks, grease, roots, and other
solid or semisolid material resulting from the cleaning operation at the downstream
Manchinhole of the section being cleaned. A suitable sand trap, weir, dam, or suction
in the next downstream Manchinhole shall be installed so that solids and debris are
trapped for removal. Passing debris from one sewer section to any other sewer
section shall not be allowed. Debris from the Manchinholes shall be loaded into a leak
proof, enclosed container that is permitted by applicable regulations for liquid waste
hauling. All solids or semi-solid wastes shall be removed from the Site at the end of
each work day. Debris, liquid waste, or sludge shall not accumulate at the Site.
B The CONTRACTOR shall dispose of waste using a licensed waste transporter to a
location licensed for the type of waste involved.
A. CCTV Equipment
1. The camera system shall include a pan-and-tilt, radial viewing, pipe inspection camera
that pans plus or minus 275 degrees and rotates 360 degrees with zooming capability.
The CONTRACTOR shall use a camera with an accurate footage counter which
displays, on the operator's monitor and the videotape, the distance of the camera from
the centreline of the starting Manchinhole. The CONTRACTOR shall use a camera
with height adjustment so that the camera lens is always cantered at one-half the
inside diameter, or higher, in the pipe being televised. The CONTRACTOR shall
provide a lighting system that allows the features and condition of the pipe to be
clearly seen. A reflector in front of the camera may be required to enhance lighting in
large diameter pipe. The camera system shall be controlled from the operator's truck.
2. Recording shall be on a 4-head VHS format VCR recorded at standard play mode in
b. Only segments between Manchinholes on the same sewer reach shall be included
on one videotape.
c. Two permanent labels are required. One label shall be placed on the spine and the
other on the face of the videotape.
d. Cassette spine information
(1) CONTRACTOR NAME
(2) Project Name
(3) Tape Number
(4) Date Televised
(5) Date Submitted
e. Cassette face information
(1) Name of street
(2) From Manchinhole Number and VCR counter number
(3) To Manchinhole Number and VCR counter number
(4) Pipe Length and Size
(5) Project Name
(6) Tape Number
f. For each cassette the CONTRACTOR shall prepare a TV Inspection Report which
shall be a complete written log of pipe conditions [and connections], indexed to the
footage counter.
1. The CONTRACTOR shall televise the sewer immediately after cleaning. It shall notify
the CONSTRUCTION MANAGER 24 hours in advance of TV inspection so that the
CONSTRUCTION MANAGER may observe inspection operations.
2. In addition, the CONTRACTOR shall clean all associated sewer Manchinholes, and
shall pan the camera to document the conditions of Manchinholes. Camera operator
shall slowly inspect each connection and sewer transitions from one pipe material to
3. Sewage flow during television inspection shall not be deeper than: Nominal Diameter
Depth as Percent of Inches Inside Diameter
Greater than 24
If the flow exceeds the depth limit, the CONTRACTOR shall either perform the
inspection during minimum flow times, pump or otherwise divert some flow, or use a
camera with provisions for high velocity jet flushing.]
4. The CONTRACTOR shall move the camera downstream at a uniform rate not greater
than 30 feet per minute. The CONTRACTOR shall stop and thoroughly inspect each
of the following:
[a. Collapsed pipe, obstructions
b. Structural cracking, with and without deflection
c. Missing portion of wall
d. Sag, excessively deflected joint
e. Cracked and open joints
f. Root intrusion
g. Protruding joint sealing material
h. Corrosion conditions, including exposed aggregate, exposed reinforcement, and
disintegrated wall which exposes the soil surrounding the pipe.
i. Missing, damaged, bulging PVC sheet lining.
j. Protruding lateral joint
k. Inflow point]
5. The camera operator shall log on a suitable form his/her observations in the inspection of
the above items.
6. If the camera is unable to pass an obstruction even though flow is unobstructed, the
CONTRACTOR shall also approach the obstruction from the other direction in order to
obtain complete video on both sides of the obstruction. The CONTRACTOR shall notify
the CONSTRUCTION MANAGER whenever such an obstruction is encountered. The
CONSTRUCTION MANAGER will determine if the obstruction must be removed.
D3:- Additional Conditions For Particular Work
1. Contractor shall work of cleaning the Manchinhole as well as Pipe section with the
use of machinery and all necessary instruments. Contractor shall work outside of the
Manchinhole and nobody shall work inside of the Manchinhole in any occasion. If he
will have to put any labour in Manchinhole he shall make following necessary
A. Contractor shall keep both end of pipe in the Manchinhole open if there will be any
labour work in the Manchinhole. He has to suck the foul gases from the Manchinhole
as well as pipe and blow the fresh air in the Manchinhole as well as pipe section.
B. Contractor shall protect / Barricade the working site if any cover of Manchinhole will
be open for the work. He shall put the caution board around the Opened
C. Contractor shall keep the Manchinhole opened without any body in the Manchinhole
& blow the air as well as fresh water in the Manchinhole check whether the gas has
been removed from the Manchinhole and then after he shall allow for labour in the
D. Contractor shall put the Gas detector in the Manchinhole as well as put the lightened
candle in the Manchinhole so that Oxygen gas can be checked in the Manchinhole.
E. Contractor shall put the alarm system in the Manchinhole.
F. Any labour shall lower down in the Manchinhole with the safety belt, Mask, Oxygen
Cylinder, First Aid Box and contractor shall take care of the labour.
G. Contractor shall provide any tool to the labour very carefully while he is working in
the Manchinhole so that any hazardous may not be arises.
H. Contractor shall arrange Mucadum and Supervisor continuous on the site during the
I. Contractor shall arrange the training for the labours working in the Manchinhole to
operate the safety measures.
J. Contractor shall provide Uniform as well as operating tools to work in the
K. Contractor shall make the arrangement that every cover of the Manchinhole shall be
fixed on the Manchinhole sheet after the work will be completed.
L. Contractor shall remove the sludge/ silt removed from the Manchinhole and pipe
section such a way that it may not be dangerous for health of public and traffic of the
road around vicinity of the work area.
M. Contractor shall furnish the data daily to the AMC office and shall make the
arrangement accordingly.
N. Contractor shall provide the Mobile phone to his supervisor/ Engineer on the work
place for better coordination with AMC staff.
O. Contractor shall appoint eligible and capable supervisor to handle the any type of
situation / accident at the site and he should remain present at the work site.
P. If any accident occurs at the work site contractor shall fully responsible and AMC will
not provide any help in that manner.
Q. The Contractor shall maintain suitable working conditions such as approach for
labours and the Vehicles / Equipments up to the Manchinhole on his cost.
R. Contractor shall arrange water tanker as and when required water during the
commissioning of the network.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
The selected sites by Dy.C.E and Third Party Inspection (TPI) agency will be shown to the
Contractors. The start point MH and end point MH of Drainage line’s condition should be
checked and the contractor by CCTV shown to Dy.C.E and Third Party Inspection (TPI)
before starting the work.
The intermidiate MH and Line’s condition will be checked by TPI and certified by ward
level A.E and A.C.E.The Drainage line survey is also included in tender, The Payment
will be done as per work done according to site situation.
Temporary / Permanent Plugging for blocking of sewer line, branch connections and
diversion of flows and removal of all plugs by any means etc. comp. as directed by
Engineer In Charge of the work.
Measurement shall be on No. basis. Contractor shall construct temporary pucca dummy in main
line or branch lines opening in the Manchinhole to close the sewer flow for de-silting the sewer
pipe in working stretch and to divert the sewage flow by brick massionary or other means in
Contractor shall open the dummy after de-silting work completed and remove all debries from
the Manchinhole.
Rate also includes of line commissioning after de-silting it with if available nearby freely. If it not
available in the near vicinity area freely Contractor himself provide it on his own cost.
Provide everything else required for diversion of flow by pumping and / or bypassing and
to maintain the sewerage system functioning normal and managing the flow without any
sur-charging, overflows etc during the De-silting/ rehabilitation works of the sewer line to
the satisfaction of the Engineer in charge of the work.
Measurement shall be considered on Running meter length basis as per attached abstracted
Loosen, de-silt and thoroughly clean and remove debris and objects such as boulders,
bricks etc, bacteriological slimes, roots, encrustations, grease, carbonated deposits, etc
from the sewer line including disposal of silt / debris / malba / objects etc, including
solidification of silt/malba/debris for disposal to the dumping sites as per the direction of
the Engineer - in - charge.
Measurement shall be considered on Running meter length basis as per attached
abstracted rates. Item includes De-silting work for existing following size dia. sewerage line
and its Manchinhole of any size and depth. Work shall be executed as per guideline of
honorable Supreme Court. Rate includes Loosen, de-silt and thoroughly clean and remove
debris and objects such as boulders, bricks etc, bacteriological slimes, roots, encrustations,
grease, carbonated deposits, etc from heavily surcharged sewer line by super sucker machine
with high flow jetting and vacuum system including safe disposal of silt / debris / malba / objects
etc with carting within AMC limit. Rate includes divergence of the sewer flow from working
stretch of the line by installation of proper pumping system so that there should not be over
surcharging in upstream of the working stretch (upstream of the plugged line). Rate includes
100% CCTV survey of de-silted sewer line with camera on pan and tilt rotated 360̊ and
recording and submitting 3 sets of CD and sufficient copies of Still Photographs. Rate also
includes supply of all material, labours, tools and plants, temporary power connection with
standby generator of sufficient power output, gas detector, forced air ventilators and provision of
saety equipments as per guideline laid by ISI1972(and 1987), international standard traffic
control arrangements and proper lighting at night, barricading, display of sign boards
Contractor shall arrangement for the safety and securities system with barricading on site,
carting of silt up to 5.0 Km lead, required power arrangement, machinery, equipments and
manpower at the work. If any water found in the pipeline or Manchinhole contractor shall
dewater from the Manchinhole or pipeline by any means of machinery. He shall take care of not
disturbing any people residing in the vicinity area during the work of dewatering and de-silting.
He shall take care of not lowering any labour in the Manchinhole / pipe. Contractor shall use any
kind of machinery as well as equipments for de-silting the pipeline. After de-silting the pipe as
well as Manchinhole Engineer in charge of the work shall verify the pipeline whether it is
cleared or not. He shall have to make the arrangement of any kind of material like water and
equipments like pump, hosepipe, Fighter, Jetting, Suction machinery, for testing and
commissioning the pipeline. All rates are inclusive of dewatering, de-silting, carting the silt at
km lead, testing and commissioning the pipeline with barricading, safety guards.
Contractor shall have to make the line dead (Free of sewage flow) if the line found flowing with
the Clean or Sewage Flow at his own risk and cost. He shall make the arrangement for diverting
the sewage flow from the sewage flow.
Post-desilting colour CCTV/ Photographic survey including pan and Zoom inspection of
laterals and defects and submission of video tapes or CD inclusive of colour
photographs to the Engineer in total 2 Sets.
Any dia. Pipeline and any size Duct
Measurement shall be considered on Running meter length basis as per attached abstracted
Tracing of old Machinehole
Measurement shall be considered on Running meter length basis as per attached abstracted
Renovation Of Machinehole Renovation of machine hole by increasing the height at top
including cost of excavation,refitting of C.I , manhole frame and cover curing etc complete
incl,all carting and providing of materials which is required for the purpose (except manhole
frame and cover) for all type manhole by providing RCC 1:2:4 parttion wall with required
reinforcement 25 cm thick and circular opening with 500mm clear dia. and 0.40 mt avg. ht
Measurement shall be considered on No.s basis as per attached abstracted rates.
Raising of existing manhole item includes,cutting of existing road surround by manhole
by diamond cutter machine, dismilting of road in confined area by breaker machine and
carting of dismantled material.item also included necessary brick work to raise the
manhole at road level in CM 1:3 item also included fixing of Manhole frame exact road
level by using fibre reinforced thixotropic repair mortar material,laying of concrete
material in desired thickness and laying of hot mix bituminous material in upper layer
and compaction of hot mix bituminous material by plate compactor machine rate also
included necessary plaster at inside of manhole in CM 1:3 in 20 mm thickness on raised
Measurement shall be considered on No. basis as per attached abstracted rates.and work
executed as per directed and instructed by engineer in charge.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Annexure:-I: (Bidder shall read carefully)
The division bench of Gujarat HC had on June 27, 2006, come up with
comprehensive guidelines for Manchinhole workers.
(Source:- 18 Manchinhole workers died since '06 - Ahmedabad - City - The Times of India)
AHMEDABAD: Despite several court guidelines to ensure safety of Manchinhole workers,
about 18 workers, including seven from Ahmedabad have lost their life while working in
Manchinholes in different parts of the state.
The state government in reply to Jodiya MLA Raghavji Patel has stated that after the
Gujarat High Court order in 2006 18 Manchinhole workers have died..
According to the government out of 18, seven workers have died in the jurisdiction of
Ahmedabad Municipal Corporation (AMC) and two each had died in Vadodara Municipal
Corporation limit and Mehsana, Mansa and Palanpur nagarpalikas. While one worker each
has died in Viramgam, Bhuj and Gandhinagar.
The division bench of Gujarat HC had on June 27, 2006, come up with comprehensive
guidelines for Manchinhole workers. This was in response to two petitions filed, following
the death of 12 Manchinhole workers in the state in
The petitions brought to light the fact that thousands of workers work in inhuman conditions
with no safeguards. Besides, workers are exposed to hazardous substances, leading to
several ailments. The court has stated that unless absolutely necessary, civic bodies in the
state will not employ human agency to carry out cleaning operations.
Further, the state government and Safai Kamdar Vikas Nigam was directed to supply
necessary equipments and find out the presence of poisonous gases in the Manchinhole.
Officials said that the court ordered that inc case of an accident, workers should not be
allowed into Manchinholes. If they are still forced, such orders should be given in writing.
The official concerned will then be liable for any untoward incident.
The court made it mandatory to train the workers and that the civic bodies should not
engage contractors who compromise on the safety of workers
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Annexure: -2: (Bidder shall read carefully
Supreme Court`s Giudelines (Source : SC's lays down rules for Manchinhole
cleaning India Environment Portal)
The Gujarat High Court division bench comprising Justice K R Vyas and Justice Akshay
Mehta came up with comprehensive guidelines for Manchinhole workers on June 27,
This was in response to two petitions filed, following the death of 12 Manchinhole workers
in the state in
The petitions brought to light the fact that thousands of workers work in inhuman conditions
with no safeguards. Besides, workers are exposed to hazardous substances, leading to
several ailments. Even the basic facilities and equipments for drainage cleaning operations
are denied to them.
The Court, in its order, has laid down guidelines for cleaning operations. The guidelines are
• Unless absolutely necessary, civic bodies in the state will not employ human agency to
carry out cleaning operations.
• State government and Safai Kamdar Vikas Nigam to supply necessary equipments for
cleaning operations.
• Before entering a Manchinhole, inspection against poisonous gases is a must
• If there is a possibility of accident, workers should not be allowed into Manchinholes. If
they are still forced, such orders should be given in writing. The official concerned will
then be liable for any untoward incident.
• Sampling of water and gas by the officer-in-charge mandatory.
• Training on health and safety to be imparted to workers. Training sessions to be held
• Periodical medical check-ups of workers mandatory.
• Civic bodies to provide basic facilities and amenities to workers.
• Civic bodies to insure workers and pay their premiums. Workers should avail of various
schemes of social welfare department.
• Civic bodies to discontinue the practice of engaging contractors.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Contractor signature Additional City Engineer
Contractor signature Additional City Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 102.pdf
Tender No. 102 (2).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .