Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹45.2 Cr+₹1.2 Cr (2.71%)Accepted-AOC | 2 | Accepted-AOC Selected Bidder | |
| 2 | 1₹44.0 CrRejected-Finance | 1 | Rejected-Finance Cancelled | |
| 3 | 3₹52.0 Cr+₹8.0 Cr (18.2%)Rejected-AOC | 3 | Rejected-AOC 2nd Lowest |
Tender Value
Refer Docs
EMD Value
₹39 L
Closing Date
15 Dec 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE_South_GAP_WandS_KMDA
D-Block, 1st Floor, Unnayan Bhavan, Salt Lake City, Kolkata-700091.
Development of Interception and Diversion Network for Existing Drain falling in River Churni including Sewage Treatment Plant at Ranaghat Municipal Town with 05 Years of Operation and Maintenance Period. 4th Call
2020_KMDA_303913_1
KMDA/WS/GAP/SE/S/NIT-4/20-21
Open Tender
CIVIL AND ELECTRICAL WORKS
Item Rate
730 days
Ranaghat Municipal Area
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹39 L
Chamber of the Chief Engineer, GAP Wing, KMDA
29 Oct 2021
7 Nov 2020
17 Dec 2020
7 Nov 2020
15 Dec 2020
7 Nov 2020
7 Nov 2020 - 11 Nov 2020
12 Nov 2020
120 days
Amount
Basic Cost
Cost of Diversion Structure
Connecting Sewerage Line for Diversion Structure to I & D Sewer
Laying of New Sewerage Line (Rising DI Main with Steel Bridge)
Cost of Pumping Stations (Civil & Electro-mechanical)
Cost of 4.00 MLD STP (SBR Technology) at Sreenathpur (inclusive of all Civil & Electro-mechanical component, power consumption, Power Connection etc.)
Cost of 5.2 MLD STP (SBR Technology) at Brickfield near Chaitanya Ghat (inclusive of all Civil & Electro-mechanical component, power consumption, Power Connection etc.)
Cost of 2.6 MLD STP (SBR Technology) at Silver Jubilee Road (inclusive of all Civil & Electro-mechanical component, power consumption, Power Connection etc.)
Operation and Maintenance Cost [(O & M Cost) shall not be < 25% of Total Cost (Basic Cost + O & M Cost + ESAMP Cost)]
5 Years O & M Cost of Pipe Line
5 Years O & M Cost of Pumping Stations (inclusive of all Civil & Electro-mechanical component, power consumption etc.)
5 Years O & M Cost of STPs (inclusive of all Civil & Electro-mechanical component, power consumption etc.)
ESAMP Cost
Communication
TEEKAY MANAGEMENTS
G B CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .