| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAccepted-Finance | ₹5.3 Cr | L1 | Accepted-Finance 1st lowest lottery bidder |
| 2 | L1₹5.3 CrRejected-Finance | ₹5.3 Cr | L1 | Rejected-Finance Other than 1st lowest lottery bidder |
| 3 | L1₹5.3 CrRejected-Finance AT PO PATASUNDARPUR KAKATPUR DIST PURI 752108 | KAKATPUR | PURI | ODISHA | 752108 | ₹5.3 Cr | L1 | Rejected-Finance Other than 1st lowest lottery bidder |
| 4 | L2₹6.2 Cr+₹92.7 L (17.6%)Rejected-Finance | ₹6.2 Cr+₹92.7 L (17.6%) | L2 | Rejected-Finance Other than 1st lowest lottery bidder |
| 5 | L2₹6.2 Cr+₹92.7 L (17.6%)Rejected-Finance | ₹6.2 Cr+₹92.7 L (17.6%) | L2 | Rejected-Finance Other than 1st lowest lottery bidder |
Tender Value
₹6.2 Cr
EMD Value
₹6.2 L
Closing Date
16 Jan 2026, 5:00 pmClosed
CCE Khordha RandB Circle Khordha
O/o the Chief Construction Engineer Khordha R and B Circle Khordha
Construction of 100 Seated Boys Hostel (G Plus 1) with Head Room and Internal Road at ITI Rua in Puri District
2026_EICCL_124092_1
CCE KHORDHA R and B CIRCLE 09 2025-26
Open Tender
Civil Works - Buildings
Percentage
330 days
Puri
3 documents required · 3 mandatory
₹10,000
₹6.2 L
Yes
30 Jul 2026
2 Jan 2026
17 Jan 2026
2 Jan 2026
16 Jan 2026
2 Jan 2026
2 Jan 2026 - 16 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unservicable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres inclusing removal and disposal of top organic soil not exceed ing 150 mm in thickness.
Site Area | 10,000 | sqm | 8.45 | ₹84,500 |
| 2 | Boring,providing and installation of 300mm dia bored cast- in -situ reiforced cement concrete piles of grade M-25 of specefied diameter and length below the pile cap to carry a safe working load not less than specified excluding the cost of steel reinforcement but including the cost of boring with bentonite soluation and temprary casing of appropriate length for setting out and removal of same and the length of pile to be embeded in the pile cap etc by percussion drilling using direct mud circulation(DMC) or boiler and chisel technique by tripod and mechanical winch machine all complete including removal of excavated earth with all its lifts and leads ( length of pile for payment shall be measured upto bottom of pile cap) Note-Truck mounted Rotary/TMT/Tubewell boring machine shall not be used etc. complete as per the specification and direction of the Engineer-in-charge.
Each 6 Mtr 300mm dia | 294 | nos | 6,154.45 | ₹18,09,408.3 |
| 3 | Extra depth upto 09mtr | 1,764 | nos | 405.29 | ₹7,14,931.56 |
| 4 | Earth work in excavation in foundation in ordinary soils in trenches, column foundation, pit etc in hard soil including dressing of sides and levelling the bed upto the required depth and depositing the excavated materials away from the work site with initial lead of 50mt and all lifts including shoring, shuttering and dewatering (if required) with cost of labour , labour cess, hire and running charges of all materials complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per direction of Engineer in charge.
Ground Floor | 516.14 | cum | 206.06 | ₹1,06,355.81 |
| 5 | Proposed Internal Road | 109.5 | cum | 206.06 | ₹22,563.57 |
| 6 | Supplying & Filling foundation trenches , plinth & ditches with Excavated Earth well watered and rammed with all lead and lift including cost, conveyance, loading, unloading, stacking, royalties and all cost & conveyance of water, cost of all Labour,labour ess,T&P required for the work etc. complete in all respect as directed by the Engineer- in -charge.
Ground Floor | 172.05 | cum | 114.48 | ₹19,696.28 |
| 7 | Supplying & Filling foundation trenches , plinth & ditches with clean coarse river sand well watered and rammed in layers not exceeding 23 c.m. in depth with all lead and lift including cost, conveyance, loading, unloading, stacking, royalties and all cost & conveyance of water, cost of all Labour,labour ess,T&P required for the work etc. complete in all respect as directed by the Engineer- in -charge.
Ground Floor | 2,206.24 | cum | 903.01 | ₹19,92,256.78 |
| 8 | Proposed Internal Road | 25.08 | cum | 903.01 | ₹22,647.49 |
| 9 | Supplying diluting and preparing chemical emulsion like CHLORPY RIPHOS or other chemicals approved by central insectiicides Board or as directed by the manufacturer and spraying the mixture uniformly by sprayer as per constructional anti termite treatment and creating a chemical barrier under and column pits and trenches basement excavation top surface of plinth filling junction of walls and floors along with external perimeter of the building expansion joints surrounding the pipes and conduits etc complete at the rate of 7.5 litters or as directed by the Manufacturer per sqm on vertical and 5.0 litters per sqm on horizontal surfaces 50% of the emulsion to be filled in the holes made in trenches at 150mm centrer to center etc complete as per IS 6313/1981 (Part-II) and as per the direction of the Engineer-in-Charge including cost of all materials, labour,taxes etc complete.
Ground Floor | 1,440 | sqm | 104.54 | ₹1,50,537.6 |
| 10 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size hard crusher broken granite stone aggregate and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including all cost, conveyance, royalties and cost of all labours,labour cess, T&P etc complete as per specification & direction of the Engineer-in-charge.
Ground Floor | 253.38 | cum | 6,564.08 | ₹16,63,206.59 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.06 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_574075.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .