Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAccepted-AOC | ₹5.9 Cr | L1 | Accepted-AOC Admitted |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not Admitted |
Tender Value
₹8.7 Cr
EMD Value
₹4.3 L
Closing Date
5 Dec 2019, 3:00 pmClosed
Chief Engineer/Contract
Delhi Metro Rail Corporation, 5th floor, A-Wing, Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi - 110 001
Customized CAMC, refurbishment and modification of 30 nos. of Kone make Escalators installed at phase-I, (underground stations) for 3 Years
2019_DMRC_513413_1
CAMC-03/2019
Open Tender
Miscellaneous Services
Item Rate
1095 days
Delhi / NCR
Please refer Tender documents.
9 documents required · 9 mandatory
₹23,600
Yes
DMRC Ltd.O and M Expenditure A/C,1120005800000032
₹4.3 L
Yes
Metro Bhawan
28 Feb 2020
24 Oct 2019
6 Dec 2019
24 Oct 2019
5 Dec 2019
19 Nov 2019
24 Oct 2019 - 4 Nov 2019
5 Nov 2019
Amount
Customized Comprehensive Annual Maintenance Contract including all nessaray labour , consumables and spares (Excluding Electrical circuit board, software and hand rail or its jointing) of KONE make escalator installed in phase-I UG station. FOR 2019-20
a) Escalators installed in 2005, i.e. E-45, E-47 to E-56, E-58, E-59 & E-61
b) Escalators installed in 2005-06, i.e. E-62 to E-73
c) Escalators installed in 2010, i.e. E-48A, E-50A, E-51A & E-53A
Customized Comprehensive Annual Maintenance Contract including all nessaray labour , consumables and spares (Excluding Electrical circuit board, software and hand rail or its jointing) of KONE make escalator installed in phase-I UG station. FOR 2020-21
a) Escalators installed in 2005, i.e. E-45, E-47 to E-56, E-58, E-59 & E-61
b) Escalators installed in 2005-06, i.e. E-62 to E-73
c) Escalators installed in 2010, i.e. E-48A, E-50A, E-51A & E-53A
Customized Comprehensive Annual Maintenance Contract including all nessaray labour , consumables and spares (Excluding Electrical circuit board, software and hand rail or its jointing) of KONE make escalator installed in phase-I UG station. FOR 2021-22
a) Escalators installed in 2005, i.e. E-45, E-47 to E-56, E-58, E-59 & E-61
b) Escalators installed in 2005-06, i.e. E-62 to E-73
c) Escalators installed in 2010, i.e. E-48A, E-50A, E-51A & E-53A
Complete overhauling of escalator including provision of required labour, consumable and spares {but excluding replacement of main & planetary gear box, step chain, both type of tracks, hand rail, floor plate}
Modification of Escaltor by provision of additional brake in main drive shaft including its actuation mechanism and required control to stop the escalator in case of any eventuality including failure of planetory gear box to prevent its free fall.(For Double motor Escalator)
Modification of Escaltor by provision of additional brake in main drive shaft including its actuation mechanism and required control to stop the escalator in case of any eventuality including failure of planetory gear box to prevent its free fall. (For Single motor Escalator)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .