Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹37.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹37.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹37.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹37.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹37.8 LAdmitted-Fee/PreQual/Technical/Finance MANKAGAN DEIPUR GADA KHARAD DIST PURI PIN 752019 | PURI | PURI | ODISHA | 752019 | +0.00% | ₹37.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹37.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹37.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹37.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹37.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹37.8 L
EMD Value
₹37,830
Closing Date
18 Jul 2026, 5:00 pmClosed
Executive Engineer
RURAL WORKS DIVISION, PURI
Lendu Kaduaghat road_Road_BUSG,SDBC and CC overlaying 1.708 to 2.087 2.367 to 2.659 4.400 to 4.760and 2.700 to 3.500
2026_CERWI_135330_1
Online-01 of 2026-27
National Competitive Bid
Civil Works - Roads
Percentage
60 days
Puri
2 documents required · 2 mandatory
₹6,000
₹37,830
Yes
19 Aug 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
10 Jul 2026 - 17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning and grubbing road land including uprooting rank vegetation, grass, bushes, shrub, supplying & trees of girth upto 300mm removal of stumps of cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of a 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness etc. complete as per direction of Engineer-in-charge. | 2,250 | sqm | 8.63 | ₹19,417.5 |
| 2 | Providing laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification including sprading in uniform thickness, hand packing rolling with three wheeled steel roller 8-10 tonnes in stages to proper grade and camber applying and brooming requisite type of screening/blind materials to fill up the interstices of coarse aggregate watering and compacting to the required density as per clause 404 of MOSRT & H specification for Road & Bridge works (4th Revision) etc. complete as per direction of the Engineer-incharge.(WBM Grade-III). Stone screened dust. | 6.46 | cum | 3,511.4 | ₹22,683.64 |
| 3 | Labour for scraping cleaning the road surface applying tack coat using 3.0kg of bitumen for 10 sqm and laying 37.5mm thick built up spray grouting in one layer using 0.45cum of 25mm to 40mm size hard granite metal & 12.00kg penetration grade of bitumen for 10 sqm in each layer with 0.12cum of 12mm size hard granite chips as key stone for 10 sqm spreading over & laying including heating pouring & spreading over & spreading bitumen metal & chips & rolling with PRR including hire & running charges of PRR, tar boiler & all other T&P articles but excluding cost & conveyance of bitumen, metal & chips etc. complete as per the specification and direction of the Engineer-in-Charge. | 198.47 | sqm | 424.8 | ₹84,310.06 |
| 4 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per Clause 502 of MoSRT&H specifications including cost, conveyance, royalty, taxes, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-Charge. | 86.13 | sqm | 37.9 | ₹3,264.33 |
| 5 | Providing and applying tack coat using bitumen @0.20 kg per sqm on the prepared granular surface / bitumenous surface cleaning with hydraulic brooms including cost of all materials, labour , T&P etc. complete as per the specification and direction of the Engineer-in-Charge. | 2,812.5 | sqm | 13.8 | ₹38,812.5 |
| 6 | Providing and laying semi dense graded bituminous concrete with batch type hot mix plant using crushed agreegates of specified grading , premixed with bituminous binder of 60/70 penetration grade of bitumen ,transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade , level and alignment, rolling with smooth wheeled ,vibratory and tandem rollers to achive the desired compaction as per clause 508 of MoSRT&H specification for the road and bridge works (4th Revision) as per the specification and direction of the Engineer-in-Charge. | 70.31 | cum | 13,809.46 | ₹9,70,943.13 |
| 7 | Providing the road surface in the both sides of berm manually with approved quality of moorum including all labour charges for spreading, laying, levelling for the work including cost, conveyance, royality and taxes of all materials, finished item of works as per the specification and direction of the Engineer-in-Charge. | 45 | cum | 1,140.8 | ₹51,336 |
| 8 | Earth Work in excavation for foundation in ordinary soil with all leads and lifts including all labour, T&P articles, safety measures, incidentals, dewatering, removal of stumps and other deleterious materials and disposal up to a lead of 50mtr, dressing of side and bottom as necessary for the work etc.complete as per direction of the Engineer-in-charge. | 163.54 | cum | 210.52 | ₹34,428.44 |
| 9 | Supplying and filling in foundation & plinth with sand well watered & rammed including all cost, conveyance, royalities of the materials labour T&P etc. complete as per specification and direction of the Engineer-in-Charge. | 18.87 | cum | 1,495.9 | ₹28,227.63 |
| 10 | Providing and laying Cement concrete of proportion (1:3:6) in foundation using 40mm nominal size clean black hand broken granite stone metal of approved quality from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm thick to the required level, ramming, watering, curing etc. complete including cost and conveyance of all materials with all taxes and royalities and labour with T&P required for the work etc. complete as per direction of the Engineer-in-charge.Foundation | 18.87 | cum | 6,801.8 | ₹1,28,349.97 |
stage.html
html • 0.09 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.38 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_600921.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .