| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.6 CrAdmitted-Finance | ₹52.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹52.9 CrAdmitted-Finance | ₹52.9 Cr | L2 | Admitted-Finance |
| 3 | L3₹55.0 CrAdmitted-Finance | ₹55.0 Cr | L3 | Admitted-Finance |
| 4 | L4₹55.2 CrAdmitted-Finance | ₹55.2 Cr | L4 | Admitted-Finance |
| 5 | L5₹55.2 CrAdmitted-Finance | ₹55.2 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GOURI SHANKAR MISHRA L1 | M/S APR INFRASTRUCTURE L5 | VISHWA INFRASTRUCTURES AND SERVICES PVT LTD L6 | KNK PROJECTS PVT LTD L3 | EAST INDIA UDYOG LIMITED L2 | GPR INFRA L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction Work:
Design, Construction, Supply, Installation, Testing and Commissioning of the Work Implementation of 24 x 7 Water Supply in Hinjilicut Municipality including Operation & Maintenance for a Period of Five Years” on Engineering, Procurement & Construction (EPC) Contract etc. all complete as per terms, conditions, scope of work and technical specification stipulated in Draft Agreement and as per conditions of RFP Document. The offer price is submitted in accordance with the bidding documents and the agreement in Appendix-IB (Letter Comprising the Financial Bid). | 1 | Job | 44,99,00,000 ₹45.0 Cr | 45,21,15,000 ₹45.2 Cr | 62,39,71,041 ₹62.4 Cr | 46,74,00,000 ₹46.7 Cr | 47,12,42,285 ₹47.1 Cr | 49,80,00,000 ₹49.8 Cr |
| 2.00 | Operation & Maintenance (excluding energy charge):
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 1st Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 50,00,000 ₹50 L | 64,82,000 ₹64.8 L | 60,00,000 ₹60 L | 66,00,000 ₹66 L | 62,20,800 ₹62.2 L | 36,00,000 ₹36 L |
| 3.00 | Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 2nd Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 50,00,000 ₹50 L | 64,82,000 ₹64.8 L | 60,00,000 ₹60 L | 66,00,000 ₹66 L | 63,45,216 ₹63.5 L | 36,00,000 ₹36 L |
| 4.00 | Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 3rd Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 55,00,000 ₹55 L | 64,82,000 ₹64.8 L | 60,00,000 ₹60 L | 66,00,000 ₹66 L | 64,72,121 ₹64.7 L | 36,00,000 ₹36 L |
| 5.00 | Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 4th Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 55,00,000 ₹55 L | 64,82,000 ₹64.8 L | 60,00,000 ₹60 L | 66,00,000 ₹66 L | 66,01,564 ₹66.0 L | 36,00,000 ₹36 L |
| 6.00 | Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 5th Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 65,00,000 ₹65 L | 64,82,000 ₹64.8 L | 60,00,000 ₹60 L | 66,00,000 ₹66 L | 67,60,299 ₹67.6 L | 36,00,000 ₹36 L |
| 7.00 | Energy Charges for Operation & Maintenance:
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 1st year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 75,00,000 ₹75 L | 1,35,00,000 ₹1.4 Cr | 1,00,00,000 ₹1 Cr | 99,00,000 ₹99 L | 48,91,785 ₹48.9 L | 72,00,000 ₹72 L |
| 8.00 | Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 2nd year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 90,00,000 ₹90 L | 1,35,00,000 ₹1.4 Cr | 1,00,00,000 ₹1 Cr | 99,00,000 ₹99 L | 49,57,009 ₹49.6 L | 72,00,000 ₹72 L |
| 9.00 | Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 3rd year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 90,00,000 ₹90 L | 1,35,00,000 ₹1.4 Cr | 1,00,00,000 ₹1 Cr | 99,00,000 ₹99 L | 50,23,102 ₹50.2 L | 72,00,000 ₹72 L |
| 10.00 | Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 4th year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement. | 1 | Job | 1,10,00,000 ₹1.1 Cr | 1,35,00,000 ₹1.4 Cr | 1,00,00,000 ₹1 Cr | 99,00,000 ₹99 L | 50,90,077 ₹50.9 L | 72,00,000 ₹72 L |
Tender Value
₹62.2 Cr
EMD Value
₹62.2 L
Closing Date
7 Dec 2022, 5:00 pmClosed
Chief Executive Officer
The Chief Executive Officer, WATCO Ground Floor, Unnati Bhawan, H.B. Colony, Satyanagar, Bhubaneswar-751007, Odisha, India (0674) 2391444
Intake Arrangement, DI MS Raw water pipe line, raw water reservoir, WTP, MBR, ESR, GSR, CWR Rising main and Distribution main with pumping arrangement and external-internal electrification
2022_WATCO_82918_1
WATCO (W)-31/ 2022-23 Dt.29.10.2022
National Competitive Bid
Civil Works - Water Works
730 days
Hinjilicut Municipality
Please refer Tender documents.
4 documents required · 4 mandatory
₹35,400
Yes
₹62.2 L
Yes
Bhubaneswar
21 Dec 2022
7 Nov 2022
13 Dec 2022
7 Nov 2022
7 Dec 2022
7 Nov 2022
7 Nov 2022 - 15 Nov 2022
18 Nov 2022
Amount
Construction Work: Design, Construction, Supply, Installation, Testing and Commissioning of the Work Implementation of 24 x 7 Water Supply in Hinjilicut Municipality including Operation & Maintenance for a Period of Five Years” on Engineering, Procurement & Construction (EPC) Contract etc. all complete as per terms, conditions, scope of work and technical specification stipulated in Draft Agreement and as per conditions of RFP Document. The offer price is submitted in accordance with the bidding documents and the agreement in Appendix-IB (Letter Comprising the Financial Bid).
Operation & Maintenance (excluding energy charge): Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 1st Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 2nd Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 3rd Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 4th Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 5th Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Energy Charges for Operation & Maintenance: Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 1st year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 2nd year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 3rd year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 4th year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Pumping Stations, etc.) during 5th year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
EAST INDIA UDYOG LIMITED
KNK PROJECTS PVT LTD
GPR INFRA
M/S APR INFRASTRUCTURE
VISHWA INFRASTRUCTURES AND SERVICES PVT LTD
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
RFP.pdf
Tender Documents • 0.50 MB
EPCA.pdf
Additional Documents • 5.62 MB
BOQ_415826.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid