| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.2 LAccepted-AOC | ₹27.2 L | L1 | Accepted-AOC FIRST LOWEST BIDDER |
| 2 | L2₹27.3 LRejected-Finance VILL BHAISORA POST CHINHAT DISTT LUCKNOW UP | ₹27.3 L | L2 | Rejected-Finance SECOND LOWEST BIDDER |
| 3 | L3₹27.3 LRejected-Finance | ₹27.3 L | L3 | Rejected-Finance THIRD LOWEST BIDDER |
Tender Value
₹27.3 L
EMD Value
₹2.7 L
Closing Date
25 May 2026, 12:00 pmClosed
EXECUTIVE OFFICER
OFFICE OF THE NPP SWAR (RAMPUR)
AWASTHAPANA NIDHI KE ANTARGAT GANGADAS KI PULIYA KE NIKAT WARD NO-10 NAGAR PALIKA PARISHAD SWAR ME GATA NO-186 PER FRAME STRUCTURE DUKANO KA NIRMAN KARYE.
2026_DOLBU_1142682_8
1/31/N.P.P.SWAR/E-TENDER DATED 27-04-2026
Open Tender
Civil Works
60 days
NPP SWAR (RAMPUR)
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,221
NPP SWAR (RAMPUR)
₹2.7 L
1 Jul 2026
28 Apr 2026
25 May 2026
28 Apr 2026
25 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 meters and lead upto 30 meters and including filling, watering and ramming of excavated earth into the trenches or into the space between the builiding and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meters from the foundation trenches (SI. No. 251) UPPWD SOR-2022
1-Coloumn Footing
2-Long Wall
3-Short wall | 84.08 | cum | 180 | ₹15,134.4 |
| 2 | Filling with good quality earth brought from outside approved borrow area, including cost of earth, royalty, loading, transportation, unloading, spreading in layers not exceeding 20 cm thickness, watering, ramming and compaction by manual/mechanical means to achieve desired compaction and level, complete in all respects as directed by the Engineer-in-Charge." | 173.4 | cum | 150 | ₹26,010 |
| 3 | Concrete with 4 cm guage stone ballast, coarse sand and cement in proportion of 8:4:1 in foundation and under floors including supply of all material, labour, T&P etc. required for proper completion of the work. (SI. No. 281 ) 2022
1-Coloumn Footing
2-Long Wall
3-Short wall | 12.25 | cum | 6,720 | ₹82,320 |
| 4 | R.C.C. work with cement approved coarse sand & 2 cms. Guage approved crushed stone grit in proportion of 1:1.5:3 in Raft foundation windows and sunshades excluding supply of reinforncement and its bending but including its fixing & binding the same with 24 BWGGI binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. .UPPWD (SI. No. 287) SOR 2022 | 18.9 | cum | 7,665 | ₹1,44,868.5 |
| 5 | R.C.C. work with cement approved coarse sand & 2 cms. Guage approved crushed stone grit in proportion of 1:1.5:3 in Columan windows and sunshades excluding supply of reinforncement and its bending but including its fixing & binding the same with 24 BWGGI binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. .UPPWD (SI. No. 289) SOR 2022
1-Upto Ground Floor
2-G.F Slab To F.Floor Slab | 10.72 | cum | 8,460 | ₹90,691.2 |
| 6 | R.C.C. work with cement approved coarse sand & 2 cms. Guage approved crushed stone grit in proportion of 1:1.5:3 in Beam windows and sunshades excluding supply of reinforncement and its bending but including its fixing & binding the same with 24 BWGGI binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. .UPPWD (SI. No. 285) SOR 2022 | 8.74 | cum | 8,445 | ₹73,809.3 |
| 7 | M-150 brick work in 1:4 (One part of cement and Four part of coarse sand of 2.75 F.M.) cement mortar in foundation and plinth including supply of all material, labour, T&P etc. required for proper completion of the work. (SI. No. 305) SOR 2022
IN | 21.67 | cum | 4,920 | ₹1,06,616.4 |
| 8 | Same as above item No. 4 but in super structure in 1:4 cement & coarse sand etc (SI. No. 305+ 310)
PWD SOR 2022 | 61.95 | cum | 5,480 | ₹3,39,486 |
| 9 | R.C.C. work with cement approved coarse sand & 2 cms. Guage approved crushed stone grit in proportion of 1:1.5:3 in Beam windows and sunshades excluding supply of reinforncement and its bending but including its fixing & binding the same with 24 BWGGI binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. .UPPWD (SI. No. 285) SOR 2022
1-Shopes G.F
2-Slabe beam | 33.17 | cum | 8,010 | ₹2,65,691.7 |
| 10 | Mild Steel (Tor steel of plain) in plain work such as
R.C.C. or R.B. work including bending for proper shape and including supply of steel and its wastage, bend hooks and authorised overlapping shall be measured UPPWD (SI. No. 504) SOR 2022
Slab And Beam As Per RCC 1.5% | 84.23 | QTL. | 7,796 | ₹6,56,657.08 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
NIT31.pdf
Tender Documents • 1.17 MB
BOQ_2134078.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid