| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | L1 | Accepted-AOC Accepted Vide Resolution No.2(1) dtd.23-02-2026 of Arimpur GP | |
| 2 | L2₹1.8 L+₹5,381.12 (3.13%)Rejected-Finance | L2 | Rejected-Finance Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | K R ARUNLAL L1 | C V SANTHOSH L2 |
|---|---|---|---|---|---|
| 1.00DRINKING WATER PROJECT - WELL DEEPENING | |||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 20 | hour | 379 ₹7,580 Lowest | 380 ₹7,600 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 16.28 | cum | 282 ₹4,590.11 Lowest | 290 ₹4,720.33 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 93.6 | cum | 144 ₹13,477.97 Lowest | 150 ₹14,039.55 |
| 1.00 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 52 | sqm | 338 ₹17,575.66 Lowest | 340 ₹17,679.66 |
| 1.00 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 2.6 | cum | 10,831 ₹28,160.6 Lowest | 10,840 ₹28,184 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 259.99 | kilogram | 123 ₹31,979.02 Lowest | 130 ₹33,798.96 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 1.42 | cum | 349 ₹494.88 | 150 ₹212.7 Lowest |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.32 | cum | 8,725 ₹2,748.38 Lowest | 8,730 ₹2,749.95 |
| 1.01 | OD430335/2025-2026:Flooring with Interlocking cobbles 60mm thick (premium) Minimum strength 4 kg/cm2over a bed of 6mm metal filling in 50mm average thick and compacting using earth hammer /compactingmachine hand operated including cost and conveyance of all materials labour charges, pointing edges etc complete | 26.04 | sqm | 1,057 ₹27,525.34 Lowest | 1,060 ₹27,603.46 |
Tender Value
₹1.6 L
EMD Value
₹3,915
Closing Date
16 Feb 2026, 2:00 pmClosed
ASSISTANT ENGINEER LID AND EW SECTION ARIMPUR GP
ASSISTANT ENGINEER LID AND EW SECTION ARIMPUR GP
PRO.NO. 197/2025-26 MUNAYAM SC DRINKING WATER PROJECT WELL DEEPENING AND RENOVATION WARD 12 IN ARIMPUR GP
2026_LSGD_833565_3
10/TR/AE/LIDEW/AMPR/2025-26
Open Tender
Civil Works - Others
Item Rate
240 days
ARIMPUR GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
₹3,915
26 May 2026
9 Feb 2026
18 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
DRINKING WATER PROJECT - WELL DEEPENING
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural sources derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
OD430335/2025-2026:Flooring with Interlocking cobbles 60mm thick (premium) Minimum strength 4 kg/cm2over a bed of 6mm metal filling in 50mm average thick and compacting using earth hammer /compactingmachine hand operated including cost and conveyance of all materials labour charges, pointing edges etc complete
11.22.1.1:Tile work in skirting, risers of steps and dado upto 2 m height, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointed with grey cement slurry @ 3.3 kg/sqm, including pointing in white cement mixed with pigment of matching shade complete. Marble tiles ( polished ) Raj Nagar8 mm thick
13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work
13.62.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture .
OD287725/2025-2026:Cleaning and disinfecting the well after completion
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_1402430.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.25 MB
BOQ_1402430.xls
BOQ • 0.31 MB
197SBD.pdf
Other Document • 1.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .