Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | S R CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00SIDE PROTECTION WALL | ||||
| 1.00 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 16.34 | cum | 738.64 ₹12,065.68 Lowest |
| 1.00 | OD430408/2024-2025:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 12 | hour | 286.37 ₹3,436.44 Lowest |
| 1.00 | OD430411/2024-2025:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 20 | metre | 1,318.21 ₹26,364.2 Lowest |
| 1.00 | OD430409/2024-2025:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6 | 3.63 | cum | 7,237.06 ₹26,270.53 Lowest |
| 1.00 | OD430410/2024-2025:VC WEEP HOLES -Providing weep holes using 75mm dia PVC pipes working pressure 4kg/sq.cm including cost of materials, conveyance, labour charge etc complete. | 8 | metre | 111.41 ₹891.28 Lowest |
| 1.01 | 12.5.2.1:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 <br> For height upto 5 m <br> II. P.C.C. grade M 20 <br>(i) Nominal mix (1:2:4) | 38.45 | cum | 8,449.84 ₹3,24,854.1 Lowest |
| 1.01 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 2.4 | tonne | 85,358.24 ₹2,04,945.13 Lowest |
| 1.01 | OD430511/2024-2025:Filling with contractor,s own earth(excluding rock) in open areas not exeeding 20cm depth, consolidating each deposited layers by ramming and watering, lead u7pto 50m and loft upto 1.5m as per direction of site engineers in charge | 10.39 | cum | 338.93 ₹3,523.18 Lowest |
Tender Value
₹6.4 L
EMD Value
₹15,885
Closing Date
23 Sept 2025, 6:00 pmClosed
Binil Kumar S S
Office of the Assistant Engineer, LID and EW Section, Aryankavu Grama Panhayath
Aryankavu GP 2024-25 Side protection wall at Thevarkkadu Colony road in ward no 9
2025_LSGD_750640_2
2025/ARKV/2-14
Open Tender
Civil Works - Roads
Item Rate
180 days
Aryankavu GP
Aryankavu GP 2024-25 Side protection wall at Thevarkkadu Colony road in ward no 9
8 documents required · 8 mandatory
₹1,405
Yes
₹15,885
Yes
12 Nov 2025
12 Sept 2025
25 Sept 2025
15 Sept 2025
23 Sept 2025
15 Sept 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1318478.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .